The Cove Business Standards Discussion Forums
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

Available (Availability), Uptime and EPE in VSM (Value Stream Mapping)

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
value stream mapping (vsm)
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
  Post Number #1  
Old 24th January 2008, 06:39 PM
Peters

 
 
Total Posts: 318
Please Help! Available (Availability), Uptime and EPE in VSM (Value Stream Mapping)

I have problem - how to understand 3 terms in VSM boxes:

1. available or availability -
What's this?
Is it in pieces? In percents?
Per shift/day/week/month?

2.Uptime
What is the definition?
How to estimate it?

3.EPE
What's this?
How to estimate it? How to use this?

Can anybody help me?
I couldn't find this in the past topics...

Sponsored Links
  Post Number #2  
Old 25th January 2008, 07:18 PM
Peters

 
 
Total Posts: 318
Re: Available (Availability), Uptime and EPE in VSM (Value Stream Mapping)

OK.
Letís talk about boxes in Strategos VSM (see attachment).
Box ďmachineĒ.

1. C/T=44 sec. (Cycle Time) - time (in seconds) that elapses between one part
coming off the process to the next part coming off

I donít know why below the box is 45 sec but itís small problem

2. C/O=60min. (Changeover Time) - time to switch from producing one product on the process to another

Do we use this indicator in this graph or this indicator is minor importance?
How often do we do exchange of tool? After every lot?

3. Lot/batch=1000pc.

OK. Do we use this?

4. Avail=27600. Available Capacity??? in seconds? in pieces? in Ö?

5. Uptime=87%. (Uptime)- percentage time that the machine is available for processing

And this 13% - whatís that? Exchange of tool? Breaks? Waiting?

6. EPE they don't use in this graph. But it can be found in symbols/definitions (EPE (a measure of production rate/s) - Acronym stands for "Every Part Every___").

And I don't understand this. Do we need this indicator?

7. The only effect of calculation in VSM graph is TIME? (Lead Time versus Total Cycle Time?). Of course time is money But why don't we estimate money directly...

I know Too many questions Maybe I'm too scrupulous
Attached Files: 1. Scan for viruses before opening, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: pdf vsm1.pdf (172.0 KB, 928 views)
  Post Number #3  
Old 30th May 2011, 02:05 PM
Marc's Avatar
Marc

 
 
Total Posts: 26,662
I Say... Re: Available (Availability), Uptime and EPE in VSM (Value Stream Mapping)

I was browsing some older posts and I came across this one which was never answered. Does anyone have any thing to share or help with? This could be a good informational thread.

Also see these existing Value Stream Mapping and VSM discussion threads.
  Post Number #4  
Old 24th May 2018, 05:32 AM
ngkjrs

 
 
Total Posts: 77
Re: Available (Availability), Uptime and EPE in VSM (Value Stream Mapping)

Availability is measured in time

Uptime is the opposite of downtime. If downtime is 1% uptime is 99%. It can be measured in time or in percentage.

EPEI stands for Every part Every Interval

Here's more on EPEI. Let's say that we have 4 items being produced in the process each with unique demand, cycle times and changeover times.

EPEI is the length of time needed to make the required demand of each of the 4 items including the changeovers between items.

1 - Calculate the total run time needed daily for production by multiplying the daily demand X cycle time for each item and adding up the times.
2 - Subtract the total production time from the available work time for a day which gives you the total amount of time available for changeovers.
3 - Add up the total amount of changeover time required for all items.
4 - Divide the total changeover by the time available for changeovers (step 2) to get the number of days to cycle through all of your items.

This is a very simple case. A more elaborate situation might involve factoring in downtimes, yield loss, rework, perhaps different kinds of changeovers, etc. But the above is the key concept.

EPEI directly sets required WIP levels. If I run a process to a 5 day EPEI, then I need to have 5 days of inventory (plus safety time etc) since I only produce a particular item every 5 days. If I can reduce EPEI to 3 days, then I only need 3 days of inventory buffer. One big benefit of focusing on reducing changeovers is to drive the EPEI lower which in turn reduces the need for inventory.

I've found that EPEI is a conceptually tough concept for people to really understand. The best way I've found to explain it is this: Let's use all of our available time to run as many changeovers as possible so that we can reduce our production lot sizes to as small as possible. By doing this we can reduce our WIP inventory to as low a level as possible without impacting our service levels.

I've found that EPEI is the key metric for high mix, low volume value stream improvements with the goal being to drive to lower and lower EPEI.
Thank You to ngkjrs for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Value Stream Mapping Template cartermi Document Control Systems, Procedures, Forms and Templates 0 8th July 2012 08:01 PM
Value Stream Mapping - Trying to do Value Stream Mapping of our Products peach Lean in Manufacturing and Service Industries 3 10th April 2012 12:24 PM
Value Stream Mapping - are there any tools to use? haueyman Lean in Manufacturing and Service Industries 10 21st June 2006 02:35 AM
Mapping your value stream VHS peach Book, Video, Blog and Web Site Reviews and Recommendations 1 31st December 2004 01:18 PM
Have any of you heard of a Value Stream Mapping sjrutland ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1 2nd November 2004 02:40 PM



The time now is 08:28 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"