The Cove Business Standards Discussion Forums
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

How to verify the actual capacity of suppliers

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
capacity analysis, supplier performance, suppliers (general topics)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 13th June 2018, 01:35 PM
JoseGB

 
 
Total Posts: 3
Please Help! How to verify the actual capacity of suppliers

Hello everyone,

I work as an SQE (jr) in the automotive industry. Management is looking to have a review across supplier for their available capacity (in percentage) in case of increasing or introducing new part numbers.

I have worked with [email protected] spreadhseets to verify suppliers can meet our demand for current part numbers being delivered, but I don't think this study is the one indicated for the information I've been asked to deliver.

This is why I'm looking for an Excel form or your suggestions on how to verify the actual capacity of the suppliers. They can come to me with a percentage but I want to investigate and evaluate by myself their available capacity.

Thank you!

Sponsored Links
  Post Number #2  
Old 13th June 2018, 02:06 PM
Wes Bucey's Avatar
Wes Bucey

 
 
Total Posts: 11,169
Re: How to verify the actual capacity of suppliers

FWIW:
One of the questions Primes in most industries fail to consider is the difference between "production capacity" and the amount of capacity (as a percentage of "production capacity") any given supplier is WILLING to allocate to any single customer. (Smart suppliers do NOT put all their eggs in one basket lest they put themselves in a position to be bullied by an aggressive customer or devastated by an unexpected disaster befalling a major customer.)


All in all, total transparency between customer and supplier on ACTUAL needs and plans for ramping up makes better economic sense in the long run. Working with an aware and trusted supplier can be to the advantage of both parties. Knowing plans and aspirations of some of our customers, we were able to suggest alternate manufacturing methods which ultimately resulted in MUCH LOWER unit costs rather than just ramping up current methods or allocating more machine time on one kind of machine.



With assurances of increased sales, we were willing and able to finance new and different equipment capable of increased efficiency (defined as lower unit costs) as well as increased capacity to meet a customer's needs, allowing us to turn previously used equipment for shorter runs for other, new customers, maintaining our percentage balance of customers.


Smart suppliers do not want to run a zero sum game; they want and need to expand capacity and sales, not just shuffle sales from one customer to another.
Thanks to Wes Bucey for your informative Post and/or Attachment!
  Post Number #3  
Old 13th June 2018, 02:25 PM
Miner's Avatar
Miner

 
 
Total Posts: 4,372
Look! Re: How to verify the actual capacity of suppliers

Keep in mind that whatever information that you obtain will be obsolete as soon as you get it. Let's say you learn that a certain supplier is at 80% capacity. As soon as you obtain this information, this supplier lands a new account that takes them to 90% capacity. I doubt that they will contact you and update this information.
Thanks to Miner for your informative Post and/or Attachment!
  Post Number #4  
Old 14th June 2018, 02:55 AM
supadrai

 
 
Total Posts: 40
Re: How to verify the actual capacity of suppliers

Can you put the question to the suppliers?
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
FORD CPA (Capacity Planning Analysis) User Guide for Suppliers beyaz Customer and Company Specific Requirements 13 27th September 2017 05:39 PM
Verify Software System Testing: Verify that results meet the Pass/Fail Criteria sope01 IEC 62304 - Medical Device Software Life Cycle Processes 1 18th January 2013 10:40 AM
Design Capacity - What does 'Design Capacity' (or 'Rated Capacity') mean? samsung Definitions, Acronyms, Abbreviations and Interpretations 10 13th June 2012 01:36 PM
Capacity Utilization - How to do a capacity utilization project Andy_80 Six Sigma 2 4th June 2007 05:24 PM
Part Numbers and Qualified Suppliers - Put supplier name in the actual drawing sheet? gheghe Document Control Systems, Procedures, Forms and Templates 4 20th November 2003 02:18 PM



The time now is 11:02 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"