Heavy Manufacturing Supplier QA - Building Units at a Supplier's Facility

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
quality assurance (qa)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 11th May 2011, 05:20 AM
pog451

 
 
Total Posts: 27
Please Help! Heavy Manufacturing Supplier QA - Building Units at a Supplier's Facility

Ladies and Gentlemen, Boys and Girls,

I would appreciate your esteemed ideas on the following.

My company essentially makes large painted, welded metal boxes (up to 15/20m on a side) which are technologically fairly simple but due to their size, number of individual components to be assembled and requirements on welding and surface treatment quality are not easy to build. Due to the global nature of our customers we manufacture almost exclusively at suppliers the world over and ship as locally as possible. This also means that we are frequently faced with building units at suppliers we do not know well or at all. Our production runs are from 1 to 10pcs typically.

At the moment our quality assurance is based on having a project and product specific manufacturing quality plan which states a minimum number of test points that are supposed to be completed and signed off as production prgresses and having these witnessed or reviewed by a combination of local or ex-pat QC staff. We also generally have a local project "expediter" whose role is a combination of project manager/coordinator, process observer and quality guy.

My problem is that this system all too often fails, leaving us at final inspection with products that display significant numbers of NCs, albeit of a fairly minor nature (i.e. paint 50 microns too thin rather than entire unit 50cm too small). Classically either the quality plan has been ignored until the day before the inspection and then been signed off all at once or the supplier has signed off tests and inspections that have not been carried out (well).

I know as well as the rest of you that the way to secure the quality of our products is to optimise the design and the supplier processes to the point where a final inspection becomes unnecessary, but leaving that aside for a moment, has anyone else experienced a Quality plan/expediter/QC model of QA and can suggest some measures to optimise this to ensure that the quality plan is followed more effectively?

Sponsored Links
  Post Number #2  
Old 11th May 2011, 09:21 AM
harry

 
 
Total Posts: 6,290
Re: Heavy Manufacturing Supplier QA - Building Units at a Supplier's Facility

Quote:
In Reply to Parent Post by pog451 View Post

.......................... At the moment our quality assurance is based on having a project and product specific manufacturing quality plan which states a minimum number of test points that are supposed to be completed and signed off as production prgresses and having these witnessed or reviewed by a combination of local or ex-pat QC staff. We also generally have a local project "expediter" whose role is a combination of project manager/coordinator, process observer and quality guy. ..................
Therein lies the problem. A standard quality plan for different areas that are in a different level of technological (& hence quality) thinking and development. You either tweak and tighten your quality and inspection plan for areas that are lower down the technological ladder or increase supervision and control.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Should the facility landlord be an approved supplier? Jane's Supplier Quality Assurance and other Supplier Issues 12 22nd November 2017 06:08 PM
Building Production / Manufacturing Facility for Class 2 Medical Device melissa87 US Food and Drug Administration (FDA) 1 27th March 2014 12:00 AM
Two Business Units Combined in the same Building HHakim ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8 28th February 2014 10:27 AM
Supplier Audit Letter Requesting an Onsite Audit of their Manufacturing Facility Achemd 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1 25th May 2012 02:20 PM
How to calculate supplier PPM with multiple units vallesj Supplier Quality Assurance and other Supplier Issues 9 3rd September 2008 09:03 AM



The time now is 05:59 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"