Slide 58
Quality
Management System Implementation
Required Level II Flow Charts (Procedures)
°4.2.3 Control of Documents
°4.2.4 Control of Quality Records
°8.2.2 Internal Audit
°8.3 Control of Nonconformity
°8.5.2 Corrective Action
°8.5.3 Preventive Action
•4.3 Contract Review
•4.4 Design Control
•4.5 Document and Data Control
•4.6 Purchasing
•4.7 Control
of Customer Supplier Product
•4.8 Product
Identification and Traceability
•4.9 Process Control
•4.10 Inspection and Testing
•4.11 Control of IM&TE
•4.12 Inspection and Test Status
Procedures ‘Required’
By the 2000 Revision
Partial Listing of Procedures
‘Required’ By the 1994
Revision
Note:
A requirement for a
‘documented procedure is not a requirement for a text based document. A flow chart is readily acceptable. I’ve been
using them in implementations for years.
I personally disdain text based procedures.