Elsmar.com
© 2004 The Elsmar Cove
Rev:  Pre-C
Rendered: Friday, February 13, 2004
Elsmar.com  --  The Cove!
Slide  80
Quality Management System Implementation
ISO 9000 Distilled - 7.3.4
•7.3.4 Design and Development Review
°Perform and record results of  product design and development reviews.
•
•7.3.5 Design and Development Verification
°Perform and record results of design and development verifications.
•
•7.3.6 Design and Development Validation
°Perform and record results of product design and development validations.
This is meant to give you a basic idea of the intention / requirements. A detailed discussion is presented in Clause_Interp_and_Upgrading.doc.