•5.6.1 Management
review minutes / etc.
•6.2.2 (e) Education,
training, skills and experience.
•7.1 (d) Evidence
that the realization processes and resulting product fulfill requirements.
•7.2.2 Results
of the review of requirements relating to the product and actions arising from
the review.
•7.3.2 Design
and development inputs.
•7.3.4 Results
of design and development reviews and any necessary actions.
•7.3.5 Results
of design and development verification and any necessary actions.
•7.3.6 Results
of design and development validation and any necessary actions.
•7.3.7 Results
of the review of design and development changes and any necessary actions.
•7.4.1 Results
of supplier evaluations and actions arising from the evaluations.
•7.5.2 (d) As required by
the company to demonstrate the validation of processes where the resulting
output cannot be verified by subsequent monitoring or
measurement.
•7.5.3 The
unique identification of the product, where traceability is a requirement.
•7.5.4 Customer
property that is lost, damaged or otherwise found to be unsuitable for
use.
•7.6 (a) Standards used for
calibration or verification of measuring equipment where no international or
national measurement standards exist.
•7.6 Validity
of previous results when measuring equipment is found not to conform with its
requirements.
•7.6 Results
of calibration and verification of measuring equipment
•8.2.2 Internal
audit results.
•8.2.4 Evidence of product
conformity with the acceptance criteria and indication of the authority
responsible for the release of the product.
•8.3 Nature
of the product nonconformities and any subsequent actions taken, including
concessions obtained.
•8.5.2 Results
of corrective actions.
•8.5.3 Results
of preventive actions.