|
No. 2 Die
No. 1 Die
Production over
For next production
Removing axis
Bolster
Roller
Stopper
Roller
[1] Take out old die
[2] Shift old die sideways
[3] Shift new die sideways
[4] Insert new die
[1] Take out old die
[2] Insert new die
[1] Insert new die while removing old die (linked movement)
bolster
free bearing
Air Cushion
H2
A
D
-1.0
-0.5
Improved Setting of Dies on a Fixed Bolster
die
Before Improvement
fixed bolster
After Improvement
die
roller conveyor
fixed bolster
| Previous slide | Next slide | Back to first slide | View graphic version |
ADVERTISEMENT
View the Elsmar Cove Privacy Policy and Terms and Conditions