C
class08820
Guys
I don't know where do I post this thread so Moderator please feel free to move in to appropriate form I am looking for SOP in the refrecenc for Batch or Lot release in to market. There are two major points need to address in this procedure 1 Clearance from Production in brief if that batch have any deviation or investigation that should be closed out. and process should be completed in time cycle 2 Clearance from QC in brief any Out of specification occurance close out I would really appreciate if anybody provide refrence material or document
Thanks in advance
I don't know where do I post this thread so Moderator please feel free to move in to appropriate form I am looking for SOP in the refrecenc for Batch or Lot release in to market. There are two major points need to address in this procedure 1 Clearance from Production in brief if that batch have any deviation or investigation that should be closed out. and process should be completed in time cycle 2 Clearance from QC in brief any Out of specification occurance close out I would really appreciate if anybody provide refrence material or document
Thanks in advance