Example # Validation of Magnetic Particle Examination in line with Clause number 5.7.1.5 of API Specification Q1 - 9th Edition with addendum 2 #
a) Required Equipment - Electromagnetic Yoke
b) Qualification of personnel - NDT level I or NDT level II or NDT level III for performance of magnetic particle examination as per documented procedure. NDT level II or level III for interpretation and evaluation of indications observed during magnetic particle examination as per documented procedure.
c) Use of specific methods including identified operating parameters - Continuous wet fluorescent magnetic particle examination with electromagnetic yoke technique.
d-1) Identification of acceptance criteria - Sufficient magnetic field must be established so that indication on CX-230 Shim shall be achieved while performing magnetic particle examination as per documented procedure.
d-2) Requirements of planned results - Sufficient magnetic field strength must be established so that indication on CX-230 shim shall be achieved while performing magnetic particle examination as per documented procedure.
d-3) Condition for acceptance of procedure validation - Achievement of planned results mentioned above. Establishment of sufficient magnetic field strength so that indication on CX-230 shim shall be achieved while performing magnetic particle examination as per documented procedure.
d-4) Evidence of successful achievement of planned results - Mentioned documented procedure for magnetic particle examination was validated on 11-23-2021 for achievement of indications on CX-230 type of shim on grinded surface, on machined surface as well as on weld surface prepared with wire brush. This concludes successful validation of mentioned procedure.
e) Requirement for records - The records for achievement of planned results and hence successful validation has developed on 11-23-2021.
f) Revalidation - Upon revision of mentioned magnetic particle examination procedure, validation records shall be reviewed by NDT level III for requirements of revalidation. If no revalidation will required, then the same will be documented in the revised magnetic particle examination procedure with revision details.
Hope this will give you the guidance for rest of your identified processes that require validation in line with clause 5.7.1.5. Good Night Pal..
You want me to give one of the example from Magnetic Particle Testing/ Ultrasonic Testing/ Radiography Testing/ Liquid Penetrate Testing? For better understanding or you understood by Post #2?
thank you
First I was confuse to figure out your numbering system as a) to f), later on I realized that you have used this numbering system just to match with clause 5.7.1.5, right ?
Can you give it for PWHT process?