Yes, ongoing. My calculations are 2 more weeks for the living room and the two hallways to be finished. Then about another 6 'working days' to tile the floor (porcelain tile, nothing fancy) in the living room and the 2 halls (I am *really* tired of carpet). Then we'll start the kitchen but I'm not sure exactly what I'm going to do there. It mostly needs 'cleanup' and I'm not sure I'll be doing it in wood. I figure that will take about 3 weeks. That will only leave the master bedroom. There I know I want to tile the floor but I'm not sure about walls and ceiling.

My big mistake so far - Stained the wall wood with too dark a stain. But, too late to change that.
 