100% Inspection Control Chart By Dr. Feigenbaum - SMT (Surface Mounting Technology)

shrikantborkar

Starting to get Involved
#1
Dear All,

I am interested in Implementing Control chart in our new SMT (Surface Mounting Technology) set up.

Please help me which is suitable control chart for SMT pcb assembly line.
secondly , I was familier with 100% Inspection Control chart by Dr, Fengban.
I have tried to search on INTERENET but unable to find detail.

Kindly suggest suitable Application of suitable control chat. and Information and comments On 100% Inspection control chart by Dr. Fengban

I would be grateful for any comments about this subject.


Thanks and regards

Shrikant borkar
 
Last edited by a moderator:
Elsmar Forum Sponsor

gard2372

Quite Involved in Discussions
#2
shrikantborkar said:
Dear All,

I am interested in Implementing Control chart in our new SMT (Surface Mounting Technology) set up.

Please help me which is suitable control chart for SMT pcb assembly line.
secondly , I was familier with 100% Inspection Control chart by Dr, Fengban.
I have tried to search on INTERENET but unable to find detail.

Kindly suggest suitable Application of suitable control chat. and Information and comments On 100% Inspection control chart by Dr. Fengban

I would be grateful for any comments about this subject.


Thanks and regards

Shrikant borkar
Shrikan Welcome to the cove,

Perhaps your internet search was unsuccessful due to the way you spelled Dr. Armand V Feigenbaum's name. A search on this forum, or google the term control chart and I'm sure you will find one to help you.
 
Thread starter Similar threads Forum Replies Date
G Is 100% Inspection a Control or does a Process need another type of control? FMEA and Control Plans 9
S 100% Final Inspection Requirements of Active Medical Devices (MDD or IEC Standards?) EU Medical Device Regulations 4
E Is there a specific regulatory requirement for 100% inspection of IFUs? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
N Switch to 100% inspection when lot fails sampling? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
G Is Controlled Shipping requirement Sampling Based or 100% Inspection? Misc. Quality Assurance and Business Systems Related Topics 3
N 100% Inspection in Retail Warehouse which Ships Products to Customers Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
K 100% Inspection or do the usual IQ, OQ, PQ Validation - Medical Molding Design and Development of Products and Processes 3
G Am I silly to do a 100% inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 15
M 100% Inspection - 85% Effective Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
M Vision System - Camera vs. Sensor to perform 100% EOL Inspection Quality Tools, Improvement and Analysis 2
S AQL .65 Level III - Take a particular component off 100% Inspection AQL - Acceptable Quality Level 4
A Injection Mold 100% Visual Inspection - Short Shots and Debris not being found Inspection, Prints (Drawings), Testing, Sampling and Related Topics 22
M SPC vs. 100% Inspection - Is SPC still value-added when 100% inspection is in place? FMEA and Control Plans 40
S Applying ANSI/ASQ Z1.4 given known lot size and 100% visual inspection AQL - Acceptable Quality Level 2
S Is there an Accept/Reject Criteria for 100% Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
E 100% continuous inspection question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 14
R Transfering Cpk specification to 100% inspection specifications Capability, Accuracy and Stability - Processes, Machines, etc. 24
S Condition of 100% inspection in organization. Capability, Accuracy and Stability - Processes, Machines, etc. 7
Q Who is responsible for 100% Inspection (QC) activities? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 16
1 U Charts, Defects and 100% Inspection Statistical Analysis Tools, Techniques and SPC 8
C Acceptance Sampling is Better Than 100% Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
J Visual Inspection Not 100% Effective - How to Improve Visual Inspection Quality Tools, Improvement and Analysis 51
J Customer Complaint Corrective Action Response - 100% Vision Inspection Customer Complaints 9
M 100% Measurement Shift to Sample Inspection? PCB Substrates Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
L Customer Requires Cpk 1.33 with 100% Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 18
R 100% Visual Inspection - Would you Remove or Reduce the Visual Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
G Inspection 100% - Process continuos (Continuous Process) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
S Tips for convincing general labour that 100% inspection not required Various Other Specifications, Standards, and related Requirements 18
S P-Chart Question - Need Guidance - 100% inspection of all product parts required? Statistical Analysis Tools, Techniques and SPC 11
T Prototype Inspection - 100% Inspection on All Parts or just a Sample? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
A How effective is 100% inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 25
R 8.2.3.1 Monitoring and measurement - Containment of product and 100% inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
J Final Inspections - Does 100% inspection really work Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
R 100% Inspection - 80% Accurate - Quote from Juran (?) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 94
CarolX Accuracy of 100% Visual Inspection - Proofs Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
Ninja Windows 10 100 % disk use after update Coffee Break and Water Cooler Discussions 33
A 21 CFR part 11 - section 11.100 - Electronic Signature Certification Other US Medical Device Regulations 6
Stoic Manual soldering processes - 100% verifiable, or always requiring validation? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 15
E Correct way to certify hydrostatic testing when it is not 100% (and Sample Size) Various Other Specifications, Standards, and related Requirements 6
A What to do when 100 % verification is not 100 % Manufacturing and Related Processes 5
Nicole Desouza ISO / AS Certification - Small business with less than 100 employees ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M EU – Chemical Safety Report – CSR – REACH Authorisation decisions – Triton X-100 – Ortho-clinical-Use1 REACH and RoHS Conversations 0
D Measuring fine tubing (< 0.100") "Wall by weight" General Measurement Device and Calibration Topics 11
Marc Anniversary of the First Trans-Atlantic Flight 100 years ago - June 2019 Coffee Break and Water Cooler Discussions 2
Y IEC 62304 Section 4.3(a) - 100% probability of failure IEC 62304 - Medical Device Software Life Cycle Processes 3
BHobbs_Busche All Measurements taken with a Variable Gage have to be Recorded 100% IATF 16949 - Automotive Quality Systems Standard 14
Pmarszal Clarification for 21 CFR Part 11.100 - General Requirements Other US Medical Device Regulations 14
B Is Gage R&R required on a 100% Dimensional Layout? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
K IEC 61010-2-100 Labeling question - IVD equipment Other ISO and International Standards and European Regulations 1
D Long length measurement of 18" up to 100" with an accuracy of .005 min General Measurement Device and Calibration Topics 8

Similar threads

Top Bottom