I have searched the forums and have not found an answer, maybe someone remembers or can help.
If for any reason these local documents are updated does this fulfill the requirement for updating the control plan as long as on these individual documents have the information as per appendix J.
There are reasons that there has been a change, addition of inspection, etc. which do not require re PPAP and thus to update the complete original CP is wastefull.
Can any one help me to justify the updating of the local documents is acceptable as per requirements.
Auditors?
I believe that the control plan although the basis for the inspection and control instructions, after approval the actual locally approved individual instructions referenced in the control plan are the descisive documents.According to 4.2.3.7 the control plan shall include the information in Appendix J
If for any reason these local documents are updated does this fulfill the requirement for updating the control plan as long as on these individual documents have the information as per appendix J.
There are reasons that there has been a change, addition of inspection, etc. which do not require re PPAP and thus to update the complete original CP is wastefull.
Can any one help me to justify the updating of the local documents is acceptable as per requirements.
Auditors?