A
Hi: I wish somebody can give an advice about control of external documents:
Here it's my question
We are a manufacture company and our product were transferred from Canada to our plant here in Mexico, the thing is that we don't have drawings or kind of specs, Canada plant only gave us like operator quality guides that cover Operation instructions also inspection points, problem is those are in English, so we have to translate everything so that people like materials dept. and manufacture supervisor prepare the material kits and be aware of part numbers .
My point is I consider that as a spec since I don’t have anything else (EXTERNAL DOCUMENT ) If I make a new document in Spanish it will be a work instruction ( INTERNAL DOCUMENT) should I keep the one that is in English as external document even if it is only a operator quality guide ?
Another problem is that our manufacturing procedure says that SPECIFICATIONS have to be in a folder along with the work order since the fist operation to the final and should be maintained in that file for further information. What kind of control can I have??
I'M SO CONFUSED
Sorry if my English is not so good, I hope I explained my self well.
Any help would be appreciated.
Thanks.
Adriana

Here it's my question
We are a manufacture company and our product were transferred from Canada to our plant here in Mexico, the thing is that we don't have drawings or kind of specs, Canada plant only gave us like operator quality guides that cover Operation instructions also inspection points, problem is those are in English, so we have to translate everything so that people like materials dept. and manufacture supervisor prepare the material kits and be aware of part numbers .
My point is I consider that as a spec since I don’t have anything else (EXTERNAL DOCUMENT ) If I make a new document in Spanish it will be a work instruction ( INTERNAL DOCUMENT) should I keep the one that is in English as external document even if it is only a operator quality guide ?
Another problem is that our manufacturing procedure says that SPECIFICATIONS have to be in a folder along with the work order since the fist operation to the final and should be maintained in that file for further information. What kind of control can I have??
I'M SO CONFUSED
Sorry if my English is not so good, I hope I explained my self well.
Any help would be appreciated.
Thanks.
Adriana
