A Andrews May 9, 2003 #1 May 9, 2003 #1 4.2.3a requires " preparation of quality plans" whereas 4.2.3.7 requires "control plan" to be developed. What is the difference between the two?
4.2.3a requires " preparation of quality plans" whereas 4.2.3.7 requires "control plan" to be developed. What is the difference between the two?
Marc Hunkered Down for the Duration with a Mask on... Staff member Admin Jan 28, 2005 #2 Jan 28, 2005 #2 See this thread: Difference between the Quality Plan vs. Control Plan. I think there is another thread in which this is discussed but I couldn't find it off hand.
See this thread: Difference between the Quality Plan vs. Control Plan. I think there is another thread in which this is discussed but I couldn't find it off hand.