Hi all
I think examples stated in clause 7.5.1.3 of ISO/TS such as initial run of a job or material changeover need to be validated according to 7.1.4 or 7.3.7 and may require customer approval. Because:
Initial run is the first time which a job (production operation) is started so it should be validated and approved by customer.
Material changeover can affect on customer, so it should be validated and approved according to 7.1.4
Changes that can be verified are such as tool replacement, shift (personnel) change and so on.
Is my interpretation right?
Thanks all
I think examples stated in clause 7.5.1.3 of ISO/TS such as initial run of a job or material changeover need to be validated according to 7.1.4 or 7.3.7 and may require customer approval. Because:
Initial run is the first time which a job (production operation) is started so it should be validated and approved by customer.
Material changeover can affect on customer, so it should be validated and approved according to 7.1.4
Changes that can be verified are such as tool replacement, shift (personnel) change and so on.
Is my interpretation right?
Thanks all