A
Iso TS 16494 section 8.2.4.1 refer to layout inspection as a full dimension report and functional test for all product and should apper in the control plan. no period of time is mensioned. I would like to know if the agreement on control apear in the control plan then the period or the execution of this request depend on the control plan and agreement with the customer. or you need to do the full measurements in a defined period and wich period?