SBS - The best value in QMS software

8.3 - Control of nonconformity product or material/part?

Q

QAMTY

#11
Re: 8.3 control of nonconformity product or material/part?

My comments in red
Of course, HR usually own the processes for recruiting and training while Finance own the processes for invoicing and for paying suppliers for conforming services and products.

But, are these processes resulting in nonconforming products: employees without the necessary competence, late or inaccurate invoices or payment for nonconforming services and products?
Yes, I have had several cases, one example, one NCR resulted because we found one worker no complying with competence, so how am I going to manage this? , I think that by mean of an NCR sent to HR (product or service, in this case, Internal Service)
Finance, Normally we sent to client the invoice in every delivery and happened that finance responsible didn't send the invoice to logistic for sending product to client, so product coudn't be delivered at the right time, and the client sent us a claim.

Of all the nonconforming products produced by your system are these among the vital few or the trivial many? Usually, nonconformities from HR and Finance are at the bottom of the pile for an organization that is focused on its customers.
You are right, they are at the bottom, but even if they are like that, in my point of view, these cases must not remain orphan , that's why I try to register the cases in the NCR format.

Thanks
 
Elsmar Forum Sponsor
Q

QAMTY

#12
Re: 8.3 control of nonconformity product or material/part?

Thanks Somashekar , my comments in red color

8.3 is about the controls to be exercised on a NC product or service. These products may be as purchased part or the final product or at any stage in between...
How one deals with this is different from how one deals with the process nonconformity.
Process monitoring and measurement is dealt in 8.2.3
I am still not clear what your question or situation is .....
The point, is how to raise NCR in HR or Finance (product or service) complying with 8.3, because nc's resulted in those departments, now I try to include them in the same format used for nonconformance products.
Thanks
 
Q

QAMTY

#13
Re: 8.3 control of nonconformity product or material/part?

Thanks dsanabria, comments in red
First - it looks like you really want to go after HR and Finance rather than your production process. In your example of finance not paying invoices to customer... let me check...hmmm I thought customer paid your company for services or processes. In essence no company collects money before releasing the product - is the other way around.
As agreed with customer, we must send the invoice accompanied with the product

Bottom line, you are spending too much time going after the wrong department. The finance department has their unique auditors, lawyers and the top guy looking at the books every time they get a chance so they should be on top of things.
We are raising nc's on all departments (sales, quality control, production)
but don't want to let unattended nc's coming from the supporting processes (HR, IT,etc).

You need to let it go and take that same energy and use it in streamlining your process - that is the real fun - now go and conquer the world.
Yes I'll do it, my system is just starting...
 

dsanabria

Quite Involved in Discussions
#14
Re: 8.3 control of nonconformity product or material/part?

My comments in red
Of course, HR usually own the processes for recruiting and training while Finance own the processes for invoicing and for paying suppliers for conforming services and products.

But, are these processes resulting in nonconforming products: employees without the necessary competence, late or inaccurate invoices or payment for nonconforming services and products?
Yes, I have had several cases, one example, one NCR resulted because we found one worker no complying with competence, so how am I going to manage this? , I think that by mean of an NCR sent to HR (product or service, in this case, Internal Service)
Finance, Normally we sent to client the invoice in every delivery and happened that finance responsible didn't send the invoice to logistic for sending product to client, so product coudn't be delivered at the right time, and the client sent us a claim.

Of all the nonconforming products produced by your system are these among the vital few or the trivial many? Usually, nonconformities from HR and Finance are at the bottom of the pile for an organization that is focused on its customers.
You are right, they are at the bottom, but even if they are like that, in my point of view, these cases must not remain orphan , that's why I try to register the cases in the NCR format.

Thanks
Your obsession with finance and HR has diverted your attention to the root cause - incompetent individual is not the responsibility of HR it is the responsibility of the area manager that
a) - hire them,
b) forgot to give appropriate training
c) Crosses trained individual to other areas without proper training.

The HR departments just verifies that legal requirements are met.

So I ask you - have you audited training appropriately to determine the status of all personnel? the NCR should go to the department that did not trained appropriately - not HR.

As far as finance not providing information on time... where was the Final and shipping department that did not raised a flag.

What I am observing is that you need to do an internal process risk assessment and go deep into the possible potential. Focus on your processes and your documentation because you have a bunch o holes in your system.
 

somashekar

Staff member
Super Moderator
#15
Re: 8.3 control of nonconformity product or material/part?

Thanks Somashekar , my comments in red color

8.3 is about the controls to be exercised on a NC product or service. These products may be as purchased part or the final product or at any stage in between...
How one deals with this is different from how one deals with the process nonconformity.
Process monitoring and measurement is dealt in 8.2.3
I am still not clear what your question or situation is .....
The point, is how to raise NCR in HR or Finance (product or service) complying with 8.3, because nc's resulted in those departments, now I try to include them in the same format used for nonconformance products.
Thanks
NCR are not there to be raised on every answer to a Why, in the 5 why analysis.
You are pointing at possible root cause areas which are an outcome of some other NCR analysis, on which actions are to be initiated.
NCR are company wide, where one process (area / department) see the NC surface due to flaw in some other process (area / department)
Less NCR's and more deeper integration and analysis and corrective actions are the key to company success.
 
Last edited:
Thread starter Similar threads Forum Replies Date
K Are Withdrawal and Recall a kind of Control of Nonconformity? Food Safety - ISO 22000, HACCP (21 CFR 120) 5
B Help with writing a Control of Nonconformity Procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 16
Jimmy123 IATF16949 Control Plan FMEA and Control Plans 1
D Control Number for Class III and IV devices Canada Medical Device Regulations 0
J Document Control Metrics Document Control Systems, Procedures, Forms and Templates 3
I Document Control Software Document Control Systems, Procedures, Forms and Templates 2
T Controlling Expandable Forms in Paper-Based Document Control System Document Control Systems, Procedures, Forms and Templates 10
N ISO 13485 7.3.9 Change control in medical device software ISO 13485:2016 - Medical Device Quality Management Systems 6
C UDI Questions on Control Units Other US Medical Device Regulations 6
A Quality Control Datasheets Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
M Control-self assessment Internal Auditing 5
GreatNate Master Control QMS software Quality Tools, Improvement and Analysis 0
A Prototype control plan FMEA and Control Plans 2
J Records Control - Does each individual record need to be numbered? Records and Data - Quality, Legal and Other Evidence 2
shimonv Document Control Procedure Header Content Document Control Systems, Procedures, Forms and Templates 3
W FMEA - Current control and occurrence rating FMEA and Control Plans 3
S Which department should prepare the control plan? could you show me a standard regarding to this matter. FMEA and Control Plans 17
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 1
N What are the software audit and control steps Reliability Analysis - Predictions, Testing and Standards 2
A Fabric roll inspection - What type of Control Chart to use? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
C Monitoring and Control Instruments RoHS, REACH, ELV, IMDS and Restricted Substances 3
M ISO14971:2019 - Verification of implementation and effectiveness of risk control ISO 14971 - Medical Device Risk Management 3
T Risks arising from control measures vs. ineffective control measures ISO 14971 - Medical Device Risk Management 11
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
P IQ, OQ, PQ protocol, and report templates for Distributed Control Systems in Pharmaceutical Manufacturing Systems. Qualification and Validation (including 21 CFR Part 11) 0
R Risk control measures as per ISO 14971 ISO 14971 - Medical Device Risk Management 6
T Linking Control Plans and PFMEA's FMEA and Control Plans 3
L How to add exemption or statement to control of document procedure? ISO 13485:2016 - Medical Device Quality Management Systems 5
T PFMEA and Control Plans on legacy product FMEA and Control Plans 5
P IATF 16949 requirement - error-proofing in control plan IATF 16949 - Automotive Quality Systems Standard 3
C 8.5.1.1 Control of Equipment, Tools, and Software Programs - Questions about the extent of control of NC programs AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q Version/Revision Control of CAD files Document Control Systems, Procedures, Forms and Templates 2
earl62 What is the best way to control special characteristics in Control plan? Is it Mandatory to have SPC for IATF 16949? IATF 16949 - Automotive Quality Systems Standard 12
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
Sravan Manchikanti How to interpret '8.3 Control of nonconforming product' for SaMD device while implementing ISO 13485 & MDSAP ISO 13485:2016 - Medical Device Quality Management Systems 7
Z Putting back excluded rows/data points in a control chart Using Minitab Software 0
J Control Plan use on the manufacturing floor FMEA and Control Plans 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
D All Dimensions listed on control plan FMEA and Control Plans 10
W Need for current design or process control FMEA and Control Plans 2
Q ISO 9001 8.5.1 - Control of production and service performance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
A What is the difference between Design Process, Process Design and Design Control? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
A Beginners help with ISO3951-2 Combined control s-method n>5 what is Phi ?? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
C Corrective action for failure in documents control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
B Control chart and sample time Statistical Analysis Tools, Techniques and SPC 1
DuncanGibbons Manufacturing Plan vs Material Specification vs Control Plan Manufacturing and Related Processes 5
J Control chart for huge sample size Statistical Analysis Tools, Techniques and SPC 9
K Contamination Control - Class Is medical devices (Clause 6.4.2 ISO 13485:2016 (E)) ISO 13485:2016 - Medical Device Quality Management Systems 12
J 510(k) for a control kit for an external IVD test kit 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
T Assessing Hazard-Related Use Scenarios where control measures exist through standards IEC 62366 - Medical Device Usability Engineering 32

Similar threads

Top Bottom