8.6 Release of products and services, 8.3 Design and development - evidence required

Ava Martin

Starting to get Involved
#1
Hi all,

I would like to ask for your opinion on what exactly should be the provided as evidence for 8.6 and 8.3. (examples of some possible documents etc)
We are Shared services providing services to our Business (in areas of Finance, Supply chain, General Accounting, Marketing & sales...)

For 8.3 - I believe this can be only applicable for us in terms of Continuous improvement (we do not directly design our services, as are migrated to our Shared Services), so would be the CI projects or for example if we develop a new team from existing one. But this is not always happening. Can we therefore have an exclusion of this subclause if not applicable?

8.6 - Release of products and services - can we provide the contracts we have and desktop descriptions? Or does it have to be something more specific?

Thank you a lot :)
 
Elsmar Forum Sponsor

Ava Martin

Starting to get Involved
#2
Actually another question, but a different topic :giggle:, if a new process is migrated to our organization, obviously this team should have an exception from Auditing as in the migration phase. How long this team can have the exception? or better said is there any list of requirements, upon which we can check and make sure this team is not prepared for the ISO Audit? Do you have any best practices perhaps? :tg:
 

Johnny Quality

Quite Involved in Discussions
#3
Actually another question, but a different topic :giggle:, if a new process is migrated to our organization, obviously this team should have an exception from Auditing as in the migration phase. How long this team can have the exception? or better said is there any list of requirements, upon which we can check and make sure this team is not prepared for the ISO Audit? Do you have any best practices perhaps? :tg:
Ava,

I would say that the team has exception ONLY if their activities are outside the scope documented on your certification. If so, it's up to you when you add their activities to the scope.
 

Ava Martin

Starting to get Involved
#4
Ava,

I would say that the team has exception ONLY if their activities are outside the scope documented on your certification. If so, it's up to you when you add their activities to the scope.
Thank you Johnny. But they are in the scope. I mean for example, they are included from this year in our service catalogue and as part of a supply chain process, just as a new subprocess, currently in migration phase, they are still in the phase of hiring, documentation preparation etc. So I would say, we can give them exception for 6months, to stabilaze. All other subprocesse of SC will be audited of course, just this one will get expeption. I would like to provide them with some list of requirements, so they can literally check if they have all what is needed and therefore can be in 6months audited. :)
 

Johnny Quality

Quite Involved in Discussions
#5
Hmm, have a chat with your CB. Sorry but I don't know the answer to that but having some time to stabilize sounds sensible. I'm sure your auditor will be interested to see what you have regardless.
 

Tagin

Trusted Information Resource
#7
Thank you Johnny. But they are in the scope. I mean for example, they are included from this year in our service catalogue and as part of a supply chain process, just as a new subprocess, currently in migration phase, they are still in the phase of hiring, documentation preparation etc. So I would say, we can give them exception for 6months, to stabilaze. All other subprocesse of SC will be audited of course, just this one will get expeption. I would like to provide them with some list of requirements, so they can literally check if they have all what is needed and therefore can be in 6months audited. :)
The point is that your company already 'included from this year in our service catalogue and as part of a supply chain process'. So, on the one hand you are - in essence - implying they are up and running and compliant (because it is a subprocess of your 9001 system), but on the other hand, you want a special exemption for them for 6 months. I don't think you can have it both ways. If you had waited the 6 months to include them, then there would likely be no issue.

At the very least, this new process should be monitored via your Continuous Improvement system for risks, controls, monitoring, etc. during this transition to provide evidence for an auditor how risk is being addressed and monitored for a process which is not fully complete, yet which you are already offering as an active service.
 
Last edited:

Tagin

Trusted Information Resource
#8
For 8.3 - I believe this can be only applicable for us in terms of Continuous improvement (we do not directly design our services, as are migrated to our Shared Services), so would be the CI projects or for example if we develop a new team from existing one. But this is not always happening. Can we therefore have an exclusion of this subclause if not applicable?
If you do not perform design of products/service offered, then I think you could possibly exclude it. It's not exactly clear what services you provide to your customers or to what extent you are involved in design. Take a look at TS9002:2016, it offers some examples of when 8.3 is needed for service-related organizations:
— a financial advisory organization that designs and develops the services it offers to its clients in relation to managing their stock portfolios;
— an educational organization which designs and develops its curricula

8.6 - Release of products and services - can we provide the contracts we have and desktop descriptions? Or does it have to be something more specific?
It's essentially whatever doc(s) it is that 'gives the go-ahead' to deliver the product/service to the customer. So, if your signed contract is what is used as the approval to trigger the start of the delivery of the service to the customer, then that works. Note that 8.6 requires traceability to the person authorizing the release, so presumably your company representative's signature on the contract is the authorizing person for your company?
 

Ava Martin

Starting to get Involved
#9
The point is that your company already 'included from this year in our service catalogue and as part of a supply chain process'. So, on the one hand you are - in essence - implying they are up and running and compliant (because it is a subprocess of your 9001 system), but on the other hand, you want a special exemption for them for 6 months. I don't think you can have it both ways. If you had waited the 6 months to include them, then there would likely be no issue.

At the very least, this new process should be monitored via your Continuous Improvement system for risks, controls, monitoring, etc. during this transition to provide evidence for an auditor how risk is being addressed and monitored for a process which is not fully complete, yet which you are already offering as an active service.
Thank you, this definitelly makes sense and then for the future to wait till the process is stabilized before signing it in into the Service Catalogue. I have to speak with my management, to see why it is so.
 

Ava Martin

Starting to get Involved
#10
If you do not perform design of products/service offered, then I think you could possibly exclude it. It's not exactly clear what services you provide to your customers or to what extent you are involved in design. Take a look at TS9002:2016, it offers some examples of when 8.3 is needed for service-related organizations:

We do not really perform desing of our services offered. These services are just "shifted" to our organization from the business. We are not the process "owners". But last year, external auditor pointed out that even tho we do not design the process "from scratch", we still have own initiated "process design" such as CI. So it is confusing whether to add or exclude it.



It's essentially whatever doc(s) it is that 'gives the go-ahead' to deliver the product/service to the customer. So, if your signed contract is what is used as the approval to trigger the start of the delivery of the service to the customer, then that works. Note that 8.6 requires traceability to the person authorizing the release, so presumably your company representative's signature on the contract is the authorizing person for your company?
Yes correct, our service level agreements are sign by representatives from our shared services and from the business. So I believe this will cover it.
 
Thread starter Similar threads Forum Replies Date
DuncanGibbons Why is 8.4 post-delivery activities before 8.6 release of products and services in AS9100D? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
shimonv Frequency and sample size for lot release of EtO sterilized products EU Medical Device Regulations 2
H Extra checks to do when reviewing the batch records for release of products Records and Data - Quality, Legal and Other Evidence 2
W What does "Release of Purchased Serial Products" mean? IATF 16949 - Automotive Quality Systems Standard 7
M Customer Approval of New Products - First articles prior to release to production Other ISO and International Standards and European Regulations 6
A SaMD: Metric for release frequency EU Medical Device Regulations 5
T Lot Release Test and Certificate of Analysis 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
A Updating Technical Documentation regularly => Leaner Release Advice EU Medical Device Regulations 2
M How to apply IEC 62304 Problem Resolution Process for bugs discovered prior to release i.e. during initial development? IEC 62304 - Medical Device Software Life Cycle Processes 2
J API Spec 6D 25th edition release date? Oil and Gas Industry Standards and Regulations 23
C Spreadsheet Validation and Release Qualification and Validation (including 21 CFR Part 11) 2
Sidney Vianna Release of ISO 10013:2021, Quality management systems – Guidance for documented information Other ISO and International Standards and European Regulations 0
A Document release vs its related training. Which should come first? ISO 13485:2016 - Medical Device Quality Management Systems 18
B Is there an estimated date of release of API Q1 10th edition? Oil and Gas Industry Standards and Regulations 39
O Any info on release date of FDA “Computer Software Assurance for Manufacturing and Quality System Software” document? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
O Release of Sanctioned Interpretations (SIs) related to Rules 5th Edition and Sanctioned Interpretations related to IATF 16949:2016 IATF 16949 - Automotive Quality Systems Standard 0
shimonv Single lot release for sterile packaging 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
B New Release of CQI-12 Coatings Process (Revision 3- Release date- 7/2020) Customer and Company Specific Requirements 2
S Can a Contract Manufacturer "release" product on behalf of client to the market? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 11
I Release checklist EO sterilization process Medical Device and FDA Regulations and Standards News 8
I Revision History Date - date of updates or date of release? ISO 13485:2016 - Medical Device Quality Management Systems 2
B Verification/release medical device modules Other ISO and International Standards and European Regulations 7
S Software Release Note - Class A stand alone software medical device IEC 62304 - Medical Device Software Life Cycle Processes 2
M Informational Team-NB published a press release regarding the survey run among its members to analyse the certificates being issued Medical Device and FDA Regulations and Standards News 0
K Release testing for Combination Drug-Medical Device Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 0
S C of C release with accompanying EASA Form 1 for EASA Part 145 EASA and JAA Aviation Standards and Requirements 0
M Informational Health Canada begins release of clinical data Medical Device and FDA Regulations and Standards News 0
M Informational EU – Draft Functional specifications for the European Database on Medical Devices (Eudamed) – First release (High(1)) to be audited Medical Device and FDA Regulations and Standards News 0
M Informational Team-NB published a press release regarding the capacities of notified bodies to meet the sector needs Medical Device and FDA Regulations and Standards News 0
M Medical Device News Team-NB publishes a press release regarding the designation process in the framework of the IVDR regulation – Regulation (EU) 2017/746 Medical Device and FDA Regulations and Standards News 0
Q Release of the first batch of a cleared product before process validation 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
M Manufacturing date does not match release date? Other US Medical Device Regulations 2
P What is expected in a Medical Device Commercial Release Procedure Design and Development of Products and Processes 3
R Medical Device License - CMDCAS certificate release - Health Canada Canada Medical Device Regulations 0
A Certificate of release/certificate of conformity/certificate of compliance Other Medical Device and Orthopedic Related Topics 3
P Is ISO 9001 Model tested for its effectiveness by ISO before its release? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Pre-release version of the upcoming AIAG FMEA Revision 5 FMEA and Control Plans 1
V Is 'Compliance' a pre-requisite or is it ok before Batch Release to Market? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
V Purchasing Controls - Prerequisites for Batch Release or even before Purchase Order 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
J Change in Lot Release Specifications - Definition of "Substantial Change" EU Medical Device Regulations 14
JoCam User Manual Release before CE Mark EU Medical Device Regulations 5
Marc Release of New or Revised Procedures Document Control Systems, Procedures, Forms and Templates 5
E ISO 22000 new release in 2016? Food Safety - ISO 22000, HACCP (21 CFR 120) 1
I How to sample in a real time release process? AQL - Acceptable Quality Level 4
M Release authorization before or after packaging per 21 CFR 820.80(d)? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
H POA procedure and EASA Form 1 Release EASA and JAA Aviation Standards and Requirements 2
shimonv Using sterilization data obtained from batch release for CE submission EU Medical Device Regulations 11
M A Question on EASA's "Release and Acceptance of Components" EASA and JAA Aviation Standards and Requirements 2
E Is Design Transfer to Production be complete prior to Release of first production lot 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
M Engineering Release Process Owner Manufacturing and Related Processes 4

Similar threads

Top Bottom