Good day Steve,

In order to give a useful response, can we please have some more details?

What is the project about? Who is the end customer?

What are the goals of the project?

This is just a starting point.
 
F

FMS-Steve

#3
Re: 7.1.1 Project Management

Going for AS9100 C updating the standards just need to know how to attack 7.1.1 question.
 
T

The Specialist

#4
Re: 7.1.1 Project Management

Hi Steve,

There are a few of us waiting to help, but don't quite understand your request.

Can you clarify/confirm

You are looking for a statement/process that you can include in your QMS around how to manage risk, assess risk and define acceptable risk... is that correct?
 

Marc

Fully vaccinated are you?
Staff member
Admin
#5
Re: 7.1.1 Project Management

Going for AS9100 C updating the standards just need to know how to attack 7.1.1 question.
Take a minute and paste the text from clause 7.1.1 in a post. That might help. My assumption is you are asking how to comply with that specific clause of AS9100C.
 
F

FMS-Steve

#6
Re: 7.1.1 Project Management

Yes, I do have couple more questions
1) In the standard you have destroy all scrap can we place the scrap document it on our routers and have a company melt the metal?
2) Frozen Planning can anyone explain?

Thanks
 
T

The Specialist

#7
(Clause 7.1.1) –​
[FONT=Arial,Arial][FONT=Arial,Arial]There is a new [/FONT][/FONT]Project Management [FONT=Arial,Arial][FONT=Arial,Arial]requirement for planning and managing product realization in a structured and controlled way to meet requirements at acceptable risk, within resource and schedule constraints. [/FONT][/FONT]
[FONT=Arial,Arial][FONT=Arial,Arial]
Rationale – Since most aviation, space and defense products are complex and involve multi-tier partners, this addition provides focus and planning throughout the entire product realization process.

Audit Considerations – The organization must have a process to manage product realization planning without compromising quality and time schedules.


Pasting this to enable others to help OP!
[/FONT]
[/FONT]
 
T

The Specialist

#8
(Clause 7.1.1) –​

[FONT=Arial,Arial][FONT=Arial,Arial]There is a new [/FONT][/FONT]Project Management [FONT=Arial,Arial][FONT=Arial,Arial]requirement for planning and managing product realization in a structured and controlled way to meet requirements at acceptable risk, within resource and schedule constraints. [/FONT][/FONT]​


[FONT=Arial,Arial][FONT=Arial,Arial]Rationale – Since most aviation, space and defense products are complex and involve multi-tier partners, this addition provides focus and planning throughout the entire product realization process. [/FONT]


[FONT=Arial,Arial]Audit Considerations – The organization must have a process to manage product realization planning without compromising quality and time schedules. [/FONT]


[FONT=Arial,Arial]Pasting this to enable others to help OP![/FONT]
[/FONT]

What I glean from this requirement is that you initiate a suitable project management process... such as use of a GANT CHART tool, or similar.

Does this sound feasible to others?
 

DannyK

Trusted Information Resource
#10
Re: 7.1.1 Project Management

Yes, I do have couple more questions
1) In the standard you have destroy all scrap can we place the scrap document it on our routers and have a company melt the metal?
2) Frozen Planning can anyone explain?

Thanks
1. Clause 8.3 of AS9100C states: Product dispositioned for scrap shall be conspicuously and permanently marked, or positively controlled, until
physically rendered unusable.

You do not have to destroy all scrap. You have to positively control it ( ie by locking it up) until it has been physically rendered unusable. You can melt the metal as long as you have controls to ensure that it has been melted.

2. Frozen planning occurs when the customers asks the supplier to provide the planning or process sheet that provides the routing and instructions for manufacturing. Once approved, you cannot makes changes to the plan unless approved by the customer or approval authority.
 
Thread starter Similar threads Forum Replies Date
D Risk Register - have we considered enough and is the format acceptable? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
W Acceptable Risk Index - What is acceptable? ISO 14971 - Medical Device Risk Management 1
Eva lee Which is the range for the validated batch size(for example ±5%, 10%) is acceptable? Manufacturing and Related Processes 6
S Examples of FDA acceptable Software Design Specification (SDS) Medical Device and FDA Regulations and Standards News 6
Q Acceptable Tolerance - how to derive? Measurement Uncertainty (MU) 16
W Misinterpretation of requirement acceptable as root cause? Problem Solving, Root Cause Fault and Failure Analysis 19
J Standard used to determine if check fixture gauge is acceptable Reliability Analysis - Predictions, Testing and Standards 2
M Measurement Error - How to determine what is acceptable? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
M Are Fungal counts acceptable in class 1000 clean rooms? Other ISO and International Standards and European Regulations 2
T ISO 14971-2019 doubt - Evaluate if estimated risks are acceptable ISO 14971 - Medical Device Risk Management 9
samer Acceptable limits for Spills - Tracking Hydraulic Spills ISO 14001:2015 Specific Discussions 3
V Acceptable maximum RSD (relative standard deviation) for an sample size Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
B Gage R&R Acceptable (10-30%), deduct Total Variation from Tolerance Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 12
Q Acceptable calibration accuracy of a 60" linear measuring device General Measurement Device and Calibration Topics 16
F It is acceptable moving remote locations staff to manufacturing plant for auditing? IATF 16949 - Automotive Quality Systems Standard 3
Q Is it acceptable to mix components from two different lots into an assembly? ISO 13485:2016 - Medical Device Quality Management Systems 1
C Acceptable NDC for %GR&R part inspection to Tolerance (%Tolerance) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
K Operator Checks - How to show that they were completed on a checklist as acceptable IATF 16949 - Automotive Quality Systems Standard 2
C Example Work Instruction/Procedure for AQL (Acceptable Quality Level) AQL - Acceptable Quality Level 4
S Dates on Labels acceptable to the USA - GS1 General Specification 3.4.4 Other US Medical Device Regulations 3
E Root Cause Analysis - Is Insufficient Understanding an acceptable Root Cause? General Auditing Discussions 9
W Unattached (stand-alone) Forms acceptable for AS9100C? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
V Why Gauge R&R 10% is acceptable for variable instruments ? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
X Acceptable methods to store and archive records ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Is it acceptable to audit to the Nuclear Principles? Quality Manager and Management Related Issues 9
I Is it acceptable it is to list new products under an existing 510(k)? Other US Medical Device Regulations 14
S If this EN ISO 11137 certificate acceptable for Contract Sterilization? ISO 13485:2016 - Medical Device Quality Management Systems 2
D What is satisfactory & acceptable for Coliform - Staphylococcus - Hands and Surfaces Food Safety - ISO 22000, HACCP (21 CFR 120) 3
S Is a Dynamic Controlled Form acceptable per 21CFR820 Document Control Systems, Procedures, Forms and Templates 3
C Lowest Acceptable Grade for Master Gage Set Calibration and Metrology Software and Hardware 1
B Digital Signature Solutions acceptable to use in an FDA Medical Device Environment 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
J Is a ndc less than five is also acceptable? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
T Technical regulations that determine the acceptable limits of cigarettes General Measurement Device and Calibration Topics 4
L IEC 60601-1 3rd edition Clause 9.2.2 Trapping Zone (Acceptable Gaps) IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
N Is it acceptable to sterilize products without claiming and labeling "sterile" ? ISO 13485:2016 - Medical Device Quality Management Systems 6
M Quality Objectives - Acceptable Levels and Functions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 37
C What is an acceptable bioburden level or count when working in cleanroom ISO class7 ISO 13485:2016 - Medical Device Quality Management Systems 1
D Is embedding documents within a Contract an acceptable practice ? Contract Review Process 9
B Non Acceptable % Tolerance Result - Decrease Sorting Limits Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
F ANSI ASQ Z1.4 - Is the following process acceptable? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
C Maximum acceptable Tolerance - Uncertainty Ratio (TUR) General Measurement Device and Calibration Topics 2
S Is it acceptable to have an ASL for Critical suppliers alone? Supplier Quality Assurance and other Supplier Issues 4
S Is this Quality Policy acceptable in the context of ISO 13485? ISO 13485:2016 - Medical Device Quality Management Systems 24
A Help with acceptable screw gage values per standard BS 919 for Go/ No Go gage General Measurement Device and Calibration Topics 4
S What are typical Acceptable Quality Levels (AQL) adopted in Food industry? Food Safety - ISO 22000, HACCP (21 CFR 120) 1
somashekar Who can provide a WHO GMP certificate in India acceptable to the CDSCO Other Medical Device Regulations World-Wide 6
D Root Cause and Corrective Action - Is our Practice Acceptable? ISO 13485:2016 - Medical Device Quality Management Systems 5
W Application of AQL (Acceptable Quality Level) Concept AQL - Acceptable Quality Level 15
H Acceptable Time to provide proof of CAR (Corrective Action Report) Nonconformance and Corrective Action 4
A Sample Size for Mathematical Model with acceptable Confidence Level Using Minitab Software 7

Similar threads

Top Bottom