I think that assuming that the design is correct It means that I don't have to consider the possibility of having a wrong design, so I don't have to consider Design Failure mode but just Preocess ones. AmI wrong?
Thanks for the clarification. You're doing a design FMEA, not a process FMEA.

Think of it this way: If the design is "correct," the task is to try and understand potential design/product failure modes with that assumption in mind.

BUT, in the course of the DFMEA process, it might be discovered that there is something questionable about the design, despite the assumption of correctness. That discovery should be reported to the proper design authority.
 
Elsmar Forum Sponsor
C

Carmine

#12
I am doing a PFMEA and the manual gives this assumption.This is a Process FMEA assumption. I am reading the manual right now. Read at page 81 bout Process Failure Mode the two assumption
1) About incoming material to be correct

2)About Design to be correct

See carefull it
 

Jim Wynne

Staff member
Admin
#13
I am doing a PFMEA and the manual gives this assumption.This is a Process FMEA assumption. I am reading the manual right now. Read at page 81 bout Process Failure Mode the two assumption
1) About incoming material to be correct

2)About Design to be correct

See carefull it
It would have been good to give the specifics in the beginning. If you're doing a PFMEA, assume the design is correct but notify the design authority if you see something that doesn't seem right. See Miner's examples.
 

Chennaiite

Never-say-die
Trusted Information Resource
#15
Thanks for the clarification. You're doing a design FMEA, not a process FMEA.

Think of it this way: If the design is "correct," the task is to try and understand potential design/product failure modes with that assumption in mind.

BUT, in the course of the DFMEA process, it might be discovered that there is something questionable about the design, despite the assumption of correctness. That discovery should be reported to the proper design authority.
Why would someone report the design flaw discovered in DFMEA to the Design authority, given that the authority himself shall be the owner of the DFMEA process and hence is very much part of the discovery?

Moreover, I don't agree with the concept of assuming Design correctness for DFMEA. I would say DFMEA per se is the process of questioning the Design and its robustness in order to evaluate risk. That is why Design changes become the outcome of DFMEA depending on the risk involved, cost constraint, technical feasibility, etc. I agree that the team shall not start questioning the design 'concept' which are supposed to be evaluated and frozen before even DFMEA begins. For instance, when the concept is frozen for a Rear Engine Vehicle, the DFMEA team shall not pitch in and question the positioning of Engine. But in real time scenario there are even occasions when Design concept is questioned.
 

Jim Wynne

Staff member
Admin
#16
Why would someone report the design flaw discovered in DFMEA to the Design authority, given that the authority himself shall be the owner of the DFMEA process and hence is very much part of the discovery?

Moreover, I don't agree with the concept of assuming Design correctness for DFMEA. I would say DFMEA per se is the process of questioning the Design and its robustness in order to evaluate risk. That is why Design changes become the outcome of DFMEA depending on the risk involved, cost constraint, technical feasibility, etc. I agree that the team shall not start questioning the design 'concept' which are supposed to be evaluated and frozen before even DFMEA begins. For instance, when the concept is frozen for a Rear Engine Vehicle, the DFMEA team shall not pitch in and question the positioning of Engine. But in real time scenario there are even occasions when Design concept is questioned.
There was some confusion here. The OP, as it turned out, was referring to PFMEA, not DFMEA.
 
Thread starter Similar threads Forum Replies Date
N AIAG 4th ed. FMEA Manual "Fit" Changed to "Appearance" - Fit severity? FMEA and Control Plans 2
K 4th Edition AIAG FMEA Occurrence, Severity and Detection Criteria for Plastics FMEA and Control Plans 1
P Occurrence Rating in AIAG FMEA Manual 4th Edition FMEA and Control Plans 5
M DFMEA Detection Ranking in AIAG FMEA Manual 4th Ed. - Explanation wanted IATF 16949 - Automotive Quality Systems Standard 6
P AIAG FMEA manual 4th edition - Problem with Appendix C FMEA and Control Plans 3
L AIAG's FMEA 4th Edition - Presentation with changes wanted FMEA and Control Plans 8
U AIAG's FMEA Manual 4th Edition Released - 2nd July 2008 FMEA and Control Plans 77
Stijloor AIAG's FMEA 4th Edition Rollout Events. FMEA and Control Plans 3
R AIAG's FMEA Manual 4th Edition pushed back to 1st quarter 2008 FMEA and Control Plans 16
J Which OEM or customers are now requiring the new AIAG/VDA FMEA format? FMEA and Control Plans 2
C AIAG/VDA FMEA - Is the new better? FMEA and Control Plans 0
P VDA AIAG FMEA - Slides for Quality Audience FMEA and Control Plans 4
B AIAG/VDA’s FMEA Manual Is a Major Advance (my take on this subject) FMEA and Control Plans 2
B AIAG-VDA FMEA - When the new format will be required FMEA and Control Plans 5
C FMEA Process assessment In the Draft for the AIAG/VDA FMEA Manual is gone FMEA and Control Plans 0
K AIAG/VDA FMEA & Process Control Plans FMEA and Control Plans 0
D FMEA-MSR in the AIAG-VDA Aligned Handbook - What is it? FMEA and Control Plans 5
bobdoering AIAG VDA FMEA Handbook - 2019 - something familiar about this.... FMEA and Control Plans 37
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
G AIAG FMEA - Major customers of the FMEA process FMEA and Control Plans 3
R Information on the roll out of the new harmonized DRAFT FMEA AIAG/VDA manual IATF 16949 - Automotive Quality Systems Standard 4
Marc When will Revision 5 of the AIAG FMEA Manual be released? FMEA and Control Plans 93
S Pre-release version of the upcoming AIAG FMEA Revision 5 FMEA and Control Plans 1
Z Failure Mode Identification in PFMEA according to AIAG FMEA Rev.4 FMEA and Control Plans 6
M AIAG FMEA Manual Request FMEA and Control Plans 9
D AIAG FMEA 4? Ed. Explanation: Relationship between PFMEA and Special Characteristics FMEA and Control Plans 8
V Latest revisions of Core Tools Manuals from the AIAG (APQP, PPAP, FMEA, SPC and MSA) IATF 16949 - Automotive Quality Systems Standard 3
X AIAG FMEA Occurrence Criteria Issue FMEA and Control Plans 6
A AIAG Design FMEA Severity Rankings - Noncompliance Government Regulation? FMEA and Control Plans 9
I What is the difference between FMEA Fourth edition (AIAG) and VDA 4.2? VDA Standards - Germany's Automotive Standards 7
R Is there an FMEA standard other than AIAG? FMEA and Control Plans 11
M What are the changes in the latest AIAG FMEA edition FMEA and Control Plans 4
Stijloor Latest AIAG PPAP and FMEA Errata Sheet APQP and PPAP 7
T RPN of Action Results per the AIAG FMEA manual FMEA and Control Plans 5
P AIAG FMEA Core Tools Exam FMEA and Control Plans 4
S Are the AIAG document (FMEA, PPAP, SPC, MSA, APQP) guidelines or requirements FMEA and Control Plans 6
K Ford FMEA - differences to AIAG FMEA FMEA and Control Plans 8
S Has the AIAG published the latest FMEA manual yet? FMEA and Control Plans 2
L PFMEA (Process FMEA) issue about lower RPN - AIAG 3rd edition page 55 FMEA and Control Plans 13
J Changes to AIAG's FMEA manual to happen in the 3rd quarter of 2007 FMEA and Control Plans 10
K AIAG FMEA Manual - New version in June 2007? FMEA and Control Plans 6
S PFMEA Form - What forces you to use the AIAG form for Process FMEA? FMEA and Control Plans 4
S VDA vs. AIAG - FMEA Ranking FMEA and Control Plans 4
C Is Risk Assessment Still Necessary? The AIAG FMEA Manual does not address FMEA and Control Plans 1
M PFMEA Detection Evaluation Criteria - Visual Check - Page 52 of the AIAG FMEA manual FMEA and Control Plans 2
A Sae J1739:2002 - Is it different from the AIAG's latest FMEA manual? FMEA and Control Plans 1
A AIAG Releases FMEA Update - 30 June 2001 FMEA and Control Plans 16
M Renault vs. AIAG FMEA - Would like details of it's usage and any training aids FMEA and Control Plans 4
O AIAG VDA DFMEA Template Required FMEA and Control Plans 2
M "Issue & continuous improvement" columns in AIAG-VDA PFMEA form FMEA and Control Plans 4

Similar threads

Top Bottom