API Certification - In Process Control

A

anderson2015

First of all hello, I am relatively new to this forum and this is my first time posting (hopefully of many).


I have recently started working for a manufacturer of hoses for the oil and gas industry (high pressure).


We are in the process of applying for API Q1 status as well as accreditation to specs 7k, 16c and 17k.


Our sister site in China recently had a 17k audit and received an NCR regarding in process control.


We have an autoclave (which is used for curing the rubber) which is 64m long. Within this autoclave we have 4 temperature probes to monitor the process. The site in China has the same however less probes.


The API auditor stated that due to the lack of probes - the process control was insufficient.


Is it specified anywhere how much / what level of process control is required? How many temperature probes should we have for a 64m length process (bearing in mind the auditor stated to gain acceptance we can have a maximum of 2 degrees difference from 1 end to the other)


Appreciate the help


Let me know if I need to provide any additional information
 
B

bluepagen

Is it specified anywhere how much / what level of process control is required? How many temperature probes should we have for a 64m length process (bearing in mind the auditor stated to gain acceptance we can have a maximum of 2 degrees difference from 1 end to the other)


Did your company purchase the autoclave? If so, I would check with the manufacturer to ask this question.

Hope this helps.
 
A

anderson2015

I am in the process of contacting the supplier of the autoclave.


Our sister site in China has recently underwent an API audit and they were informed of the same thing.


I don't recall reading anywhere in the standard that there is a set guideline for process control (that is as detailed as informing you at how many m you must take a measurement)
 

Steve Prevette

Deming Disciple
Leader
Super Moderator
What do the data indicate? You stated a 2 degree requirement from one end to the other. Does your autoclave with a higher level of instrumentation show you meet that requirement routinely? Have you done a set of statistical analyses to validate the equipment meets the requirements or does not meet?

I would say you should be able to make the case that if you have the equivalent of a good R&R study (and some ongoing SPC monitoring) that the 2 degree requirement is routinely met, and the functionality of the autoclave with less instrumentation is otherwise exactly the same, then you are "in process control".
 
A

anderson2015

What do the data indicate? You stated a 2 degree requirement from one end to the other. Does your autoclave with a higher level of instrumentation show you meet that requirement routinely? Have you done a set of statistical analyses to validate the equipment meets the requirements or does not meet?

I would say you should be able to make the case that if you have the equivalent of a good R&R study (and some ongoing SPC monitoring) that the 2 degree requirement is routinely met, and the functionality of the autoclave with less instrumentation is otherwise exactly the same, then you are "in process control".

We have warning alarms if the autoclave goes outside of the allowed limits in terms of temperature and pressure.


I will speak with the engineering department and maintain the documentation and process data for this and use it as a basis of our case for being "in process control"


Thank you all for your help!!
 
Thread starter Similar threads Forum Replies Date
H API monogram 4F - Certification process Oil and Gas Industry Standards and Regulations 2
G Start and main steps of API Q1 Certification Process Various Other Specifications, Standards, and related Requirements 5
J Help to understand and response to API AAR during the re-certification audit Oil and Gas Industry Standards and Regulations 17
D API 6A Certification Question Oil and Gas Industry Standards and Regulations 4
F API Spec Q1 Scope - Limiting the scope of certification Oil and Gas Industry Standards and Regulations 3
M API Q1 Certification Activation - Waiting, Waiting, and Waiting... Oil and Gas Industry Standards and Regulations 3
S API Q1 Approved Training & Professional Certification Sources Oil and Gas Industry Standards and Regulations 5
J API Q1 Certification for Design and Development company Oil and Gas Industry Standards and Regulations 3
V Can anybody help me to get knowledge about API (6A) certification Oil and Gas Industry Standards and Regulations 8
V Help with API 6A Certification and API 6A Documentation Oil and Gas Industry Standards and Regulations 4
S API ISO/TS 29001 Certification Body in Malaysia Oil and Gas Industry Standards and Regulations 8
D Oil and Gas API 6A Major NC Oil and Gas Industry Standards and Regulations 5
D Contract Review Evidence/ Sample for API Monogram Licensing Oil and Gas Industry Standards and Regulations 9
A ISO 9001 & API Q1 Approved Supplier/Sole Agent ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M API Spec Q1 9th Ed. 5.5 Contingency Planning Oil and Gas Industry Standards and Regulations 1
J Response time from API for review of responses to audit findings Oil and Gas Industry Standards and Regulations 7
R Marking on API 20E bolts Oil and Gas Industry Standards and Regulations 1
J API 5CT - NDE for Accessory Material - Section 10.15.11 Oil and Gas Industry Standards and Regulations 2
J API Q1 - 5.6.1.2 (b) - Initial Supplier Evaluation—Critical Purchases Oil and Gas Industry Standards and Regulations 1
J API Q1 - 5.7.1.5 - Validation of Processes for Production and Servicing Oil and Gas Industry Standards and Regulations 4
B Validation of design for valve api 6d 25 edition ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
D API Q1 clause (1.0) Scope Oil and Gas Industry Standards and Regulations 1
D API Q1 clause (5.6.3) Verification of Purchased Products or Activities ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
B Hi , everyone i need a procedure for validation of design prototype api 6d (valve manufacturing) Oil and Gas Industry Standards and Regulations 1
I API Q1 5.7.1.5.a and API 6A10.4.2.12.2 AAR in API audit Oil and Gas Industry Standards and Regulations 0
M API SPEC Q1 9th edition NCR Oil and Gas Industry Standards and Regulations 3
M API Q1 9th edition NCR Oil and Gas Industry Standards and Regulations 10
A Metadata For Drugs, API's, Regulatory & Clinical Documents and Dossier Service Industry Specific Topics 2
J API Q2 clause 5.4.3 b) Oil and Gas Industry Standards and Regulations 3
P Product Quality Review API-GMP Manufacturing and Related Processes 0
A API Q1 9th Edition Surveillance Audit - Quality Policy Oil and Gas Industry Standards and Regulations 2
B Use an iso 9001/2015 form for api q1 systeme Oil and Gas Industry Standards and Regulations 5
J API Spec Q1 9th Ed. Oil and Gas Industry Standards and Regulations 4
B Evaluation of suppliers API Spec Q1 5.6.1.2c Oil and Gas Industry Standards and Regulations 2
T API 4F & 7K license - Add Mexico location? Oil and Gas Industry Standards and Regulations 5
B Validating calibration certificate as per API Q1 General Measurement Device and Calibration Topics 9
B API 5L for Cold Drawn Pipes Oil and Gas Industry Standards and Regulations 2
G API 5DP Monogram Licensee Oil and Gas Industry Standards and Regulations 6
N API Q1, Management of Change & Document Change Request Oil and Gas Industry Standards and Regulations 4
N API Q1 Audit Surveillance - Questions Oil and Gas Industry Standards and Regulations 2
J QTC Requirement as per API 6A-21st Edition Oil and Gas Industry Standards and Regulations 1
D What are the Activity deemed critical for the API 6D Ball Valve ? Oil and Gas Industry Standards and Regulations 4
B How to satisfy clause 5.7.1.5 process validation for valve production API 6D Oil and Gas Industry Standards and Regulations 13
Q API Spec Q1 9th Ed 4.4.2 Non-conformance Oil and Gas Industry Standards and Regulations 8
J API Q1 4.3.2.2 Personnel Competence for Internal Auditors Oil and Gas Industry Standards and Regulations 5
H API monogram 4F, The difference between PSL-1 & PSL-2 Oil and Gas Industry Standards and Regulations 5
D How to testing of Pressure relief valve as per API 6D ? Oil and Gas Industry Standards and Regulations 1
J API Spec 6D 25th edition release date? Oil and Gas Industry Standards and Regulations 23
P API Q1 - Monogram Product & API 4F - Proof Load Test Oil and Gas Industry Standards and Regulations 3
T API SPEC Q1 Clause 5.6.1.2.C).2) First Article Oil and Gas Industry Standards and Regulations 16

Similar threads

Top Bottom