Morning All:

Background.
I'm Nick, Quality Manager for a smallish Design/Manufacturing company in Lafayette Louisiana servicing the Oil and Gas Industry. We are going through the trials and tribulations of switching from ISO 9001-2008 to API Q1 9th ed and will be Q1 certified (along with getting a API 16.D monogram license) hopefully in January 2014.

I started this thread to share my ongoing experiences and hopefully good insight into this whole process as well as to get an idea of how many O&G folks are here at the Cove and maybe we can talk Marc into a section just for us... :D

Last Friday we did yet another internal audit, this time with a focus on risk assessment. My owners decided, after a lengthy discussion, that our risks were pretty standard across all projects and so I developed a very simple risk matrix covering the broad spectrum risks (i.e. Hurricane, fire, supplier failure to deliver, etc) on one side and the outlines of contingency planning on the other. I ran this by a former API auditor and he agreed that as long as we make sure to capture any risks associated with non-standard projects we should be fine. I'm a big proponent of painting with broad strokes to start and detailing on a case by case basis where applicable.

Keep in mind folks, there is no quick fix when changing from ISO to Q1 9th ed. I don't remember the revision but 9th ed reminds of ISO pre-2000 when I was with Grant Prideco. Lot's of procedures, everything a controlled document, lot's of checklists. I couldn't use our ISO manual at all, had to start fresh. We went from 7 procedures and a process flow to 26 procedures (combined where I could), an engineering process flow, and 2 work instructions.

I'm rambling, sorry. Look forward to hearing from others!

N
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#2
There are a couple of "diaries" here, but none regarding API Q1. I'm sure your input will be very appreciated. Thank you!
 
M

McMoose78

#3
Morning All:

Background.
I'm Nick, Quality Manager for a smallish Design/Manufacturing company in Lafayette Louisiana servicing the Oil and Gas Industry. We are going through the trials and tribulations of switching from ISO 9001-2008 to API Q1 9th ed and will be Q1 certified (along with getting a API 16.D monogram license) hopefully in January 2014.

I started this thread to share my ongoing experiences and hopefully good insight into this whole process as well as to get an idea of how many O&G folks are here at the Cove and maybe we can talk Marc into a section just for us... :D

Last Friday we did yet another internal audit, this time with a focus on risk assessment. My owners decided, after a lengthy discussion, that our risks were pretty standard across all projects and so I developed a very simple risk matrix covering the broad spectrum risks (i.e. Hurricane, fire, supplier failure to deliver, etc) on one side and the outlines of contingency planning on the other. I ran this by a former API auditor and he agreed that as long as we make sure to capture any risks associated with non-standard projects we should be fine. I'm a big proponent of painting with broad strokes to start and detailing on a case by case basis where applicable.

Keep in mind folks, there is no quick fix when changing from ISO to Q1 9th ed. I don't remember the revision but 9th ed reminds of ISO pre-2000 when I was with Grant Prideco. Lot's of procedures, everything a controlled document, lot's of checklists. I couldn't use our ISO manual at all, had to start fresh. We went from 7 procedures and a process flow to 26 procedures (combined where I could), an engineering process flow, and 2 work instructions.

I'm rambling, sorry. Look forward to hearing from others!

N
Hi Nick,

I'm in the same situation, but at the beginning stages. Just attended an API Q1 9th edition training course in Houston. Would you be willing to share a copy of your Quality Manual as a guideline?

Regards,
Arthur
 
I

Irshad Khan

#6
Hi Nick,

Why consider risks associated with Hurricane, fire etc. This is not the intent of Q1 9th Ed and more related with H.S.E. Q1 has identified four categories to assess risks and develop CP.
 
Last edited by a moderator:
N

NHopkins

#7
Actually anything that can effect delivery on a product will fall under risk assessment. Hurricane may cause us to slide delivery to the right a week or more, which in turn activates all kinds of quality processes to deal with the aftermath of being shut down for as little as a day or as long as needed. Our risk assessment matrix covers natural disasters and lines out what steps we would possibly need to take (including customer notifications, supplier communication, adding shifts and hiring temporary workers, renting generators and air compressors...etc) to limit the impact on delivery.

I've actually checked the validity of this through our API contact.

Thanks!
Nick
 
I

Irshad Khan

#8
Nick,
Thanks for your reply. I do not intend to challenge and true that many things can affect the delivery of product, however in 5.3 risks associated with Facility/equipment, supplier, delivery of non conforming product and availability of competent personnel are mentioned and as such required.
One can make a big shopping list but is every item really needed? Because if we try to buy everything we may end up just with more expenses.
The idea of taking into account Natural disasters came from QS 9000 (which I do not know if still a valid QMS).
The API certainly do not want to make business more expensive and customer will not pay for it.

Irshad Khan
 
I

Irshad Khan

#9
Hi Nick: bigwave:
I want to continue on these discussions and hopefully more people are attracted. I am currently working on the transition to 9th Ed and would like to share my experiences and learn from people like you at the same time.

Thanks and hope to hear from you soon,

Irshad
 
I

Irshad Khan

#10
Hello Guys,
Would greatly appreciate if someone can post a sample procedure meeting requirements of 5.6.1 Purchasing and 5.6.1.1 - 5.6.1.3 sub parts of 5.6.1.

Thanks
 
Thread starter Similar threads Forum Replies Date
S API spec Q1 9th edition - Castings & Forgings Oil and Gas Industry Standards and Regulations 4
N API spec Q1 9th edition Oil and Gas Industry Standards and Regulations 2
A API Spec Q1 9th Edition # Re-audit - Disputing with API AARs Oil and Gas Industry Standards and Regulations 1
F API Spec Q1 9th Edition Surveillance Audit - Questions about internal audits. Oil and Gas Industry Standards and Regulations 22
A API Spec Q1 9th Edition - 12 month Internal Audit Schedule Audit Nonconformance Oil and Gas Industry Standards and Regulations 10
L Newly API Q1 9th Edition applicant HELP please =) Oil and Gas Industry Standards and Regulations 3
C API Q1 9th Edition Internal Audit Checklist /Report Oil and Gas Industry Standards and Regulations 22
F Operating Procedures for API Q1 9th Edition Oil and Gas Industry Standards and Regulations 2
J API Q1 9th Edition - Question on Outsourcing 5.6.1.6 Oil and Gas Industry Standards and Regulations 1
S Product Risk Assessment and Management Procedure per API Q1 9th Edition Oil and Gas Industry Standards and Regulations 8
M API Spec. Q1, 8th Ed. Section 7.5.2 vs. Q1, 9th Ed. Section 5.7.1.5 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
N Audit non-compliance - API Spec Q1 9th Ed 5.6.1.2 b Oil and Gas Industry Standards and Regulations 10
A API Q1 9th ed Addendum 2 - Vendor Assessment for critical products Oil and Gas Industry Standards and Regulations 18
F Quality Manual Updates - ISO 9001:2015 and API Q1 9th Editition Quality Management System (QMS) Manuals 14
P Experience / advice for integrating API Q1 9th with a WCM program Oil and Gas Industry Standards and Regulations 5
M Calibration Procedure Traceable to National/International Standards (API Q1 9th Ed) Oil and Gas Industry Standards and Regulations 3
M Risk Assessment & Contingency Planning (API Q1, 9th. Ed.) Oil and Gas Industry Standards and Regulations 9
M Defining Critical Vs. Non-Critical Suppliers/Service Providers (API Q1, 9th. Ed.) Oil and Gas Industry Standards and Regulations 2
J API Q1 9th Raw Material Specs on P.O.s Oil and Gas Industry Standards and Regulations 2
lanley liao How to understand correctly the requirements of API monogram products Oil and Gas Industry Standards and Regulations 0
A API Monogram audit review process Oil and Gas Industry Standards and Regulations 4
lanley liao Are there guidelines for application of all API monogrammal product? Oil and Gas Industry Standards and Regulations 2
U API License Agreements Oil and Gas Industry Standards and Regulations 2
U API Spec Q1 - 5.6.1.2 C (3) - Design software Oil and Gas Industry Standards and Regulations 3
R American Petroleum Institute - Becoming an API Auditor Professional Certifications and Degrees 2
B There is an estimated date of release of API Q1 10th edition? Oil and Gas Industry Standards and Regulations 8
lanley liao How to correctly understand the bullet list d) of 6.3 Analysis of Data for API Spec Q1 Oil and Gas Industry Standards and Regulations 7
A API Spec Q1 Purchasing Process - Supplier Reevaluation based on Supplier Risks 5.6.1.4 Oil and Gas Industry Standards and Regulations 17
lanley liao How to keep the manufacturing capability under the API monogram Oil and Gas Industry Standards and Regulations 6
lanley liao How to understand this bulleted list from API 600 Oil and Gas Industry Standards and Regulations 0
lanley liao The validity of API Spec Q1 certificate Oil and Gas Industry Standards and Regulations 2
R [ASK] API Q1 Ninth Edition, Section 5.4.5 Oil and Gas Industry Standards and Regulations 4
A Design and development procedure for API Spec Q2 Oil and Gas Industry Standards and Regulations 6
S API Spec.Q1 Standards Version in Purchasing Information Oil and Gas Industry Standards and Regulations 1
S API Spec. Q1 clause 5.6.1.2 On site evaluation Oil and Gas Industry Standards and Regulations 10
H Updating Quality Manual to API Q1 Service Industry Specific Topics 6
lanley liao How to understand the term 3.1.21 'Servicing' and the clause 5.7.1.2 'Servicing' of API Spec Q1? Oil and Gas Industry Standards and Regulations 19
M API 4F/7K/8C Design Package Validation Oil and Gas Industry Standards and Regulations 2
F Who can sit in/perform an API audit? Oil and Gas Industry Standards and Regulations 2
A Does anyone have a checklist of API Spec 650 13th Edition? Oil and Gas Industry Standards and Regulations 0
N Audit non-compliance API Q1 - Use of External Documents 4.4.4 in Product Realization Oil and Gas Industry Standards and Regulations 8
P Does anyone have a API Q1 Documentation Package? Quality Management System (QMS) Manuals 1
D API 6A Certification Question Oil and Gas Industry Standards and Regulations 4
C New to Site - Request Help with API Q2 Implementation Oil and Gas Industry Standards and Regulations 9
T API Q1 - Will I be able to maintain Q1 if I have products that fall under 6A Oil and Gas Industry Standards and Regulations 5
R Process control documents - Context of API Spec Q1, Clause 5.7.1.3 Other ISO and International Standards and European Regulations 0
P API monogram mark requirements Oil and Gas Industry Standards and Regulations 1
W Does anyone have an API Q2 checklist for internal auditing? Oil and Gas Industry Standards and Regulations 1
K 820.200 Servicing Procedure - Our system (because there is an API involved) is classified as Class 3 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
B API Q1 5.7.1.5 Process Validation - Machining, heat treating, Manganese Phosphate and Zinc Plating Manufacturing and Related Processes 2

Similar threads

Top Bottom