API Q1 clause (5.6.3) Verification of Purchased Products or Activities

#1
Does verification of Purchased Products or Activities required in case of Non-critical Products or Activities? e.g. if we purchase wooden box for packing the material.
 
Elsmar Forum Sponsor

jmech

Trusted Information Resource
#4
Read section 5.6.3 (including the changes from addendum 2) again.

Verification is required for ensuring that purchased products (regardless of whether they are critical or non-critical) meet specified purchased requirements. However, for non-critical purchases, there is not a requirement for testing or inspection - a review of the paperwork or another simple check could be sufficient (as long as this is correctly documented in your verification procedure).
 
Thread starter Similar threads Forum Replies Date
D API Q1 clause (1.0) Scope Oil and Gas Industry Standards and Regulations 1
J API Q2 clause 5.4.3 b) Oil and Gas Industry Standards and Regulations 3
B How to satisfy clause 5.7.1.5 process validation for valve production API 6D Oil and Gas Industry Standards and Regulations 13
T API SPEC Q1 Clause 5.6.1.2.C).2) First Article Oil and Gas Industry Standards and Regulations 16
T Internal NCR - API Q1 5.4.2b - API 16C Clause 4.1.3 Internal Auditing 9
SANTHSH API Spec. Q1 clause 5.6.1.2 On site evaluation Oil and Gas Industry Standards and Regulations 12
lanley liao How to understand the term 3.1.21 'Servicing' and the clause 5.7.1.2 'Servicing' of API Spec Q1? Oil and Gas Industry Standards and Regulations 19
R Process control documents - Context of API Spec Q1, Clause 5.7.1.3 Other ISO and International Standards and European Regulations 0
R API 4F - Clause 11.10.3 Bolt Pretensioning Oil and Gas Industry Standards and Regulations 4
N API Q2 clause 6.2.2.1 Auditing Outsourced Suppliers Oil and Gas Industry Standards and Regulations 5
L Validation Processes of Production & Servicing - API Q1 clause 5.7.1.5 Oil and Gas Industry Standards and Regulations 2
C API Q1 8th ed Clause 7.4 Purchasing - 7.4.1.1 Purchasing Process (supplemental) Oil and Gas Industry Standards and Regulations 9
C API Q1 Clause 7.1.1 Planning of Product Realisation Oil and Gas Industry Standards and Regulations 2
M API Spec Q1 9th Ed. 5.5 Contingency Planning Oil and Gas Industry Standards and Regulations 1
J Response time from API for review of responses to audit findings Oil and Gas Industry Standards and Regulations 7
R Marking on API 20E bolts Oil and Gas Industry Standards and Regulations 1
J API 5CT - NDE for Accessory Material - Section 10.15.11 Oil and Gas Industry Standards and Regulations 2
J API Q1 - 5.6.1.2 (b) - Initial Supplier Evaluation—Critical Purchases Oil and Gas Industry Standards and Regulations 1
J API Q1 - 5.7.1.5 - Validation of Processes for Production and Servicing Oil and Gas Industry Standards and Regulations 4
B Validation of design for valve api 6d 25 edition ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
B Hi , everyone i need a procedure for validation of design prototype api 6d (valve manufacturing) Oil and Gas Industry Standards and Regulations 1
I API Q1 5.7.1.5.a and API 6A10.4.2.12.2 AAR in API audit Oil and Gas Industry Standards and Regulations 0
M API SPEC Q1 9th edition NCR Oil and Gas Industry Standards and Regulations 3
M API Q1 9th edition NCR Oil and Gas Industry Standards and Regulations 10
A Metadata For Drugs, API's, Regulatory & Clinical Documents and Dossier Service Industry Specific Topics 2
P Product Quality Review API-GMP Manufacturing and Related Processes 0
A API Q1 9th Edition Surveillance Audit - Quality Policy Oil and Gas Industry Standards and Regulations 2
B Use an iso 9001/2015 form for api q1 systeme Oil and Gas Industry Standards and Regulations 5
J API Spec Q1 9th Ed. Oil and Gas Industry Standards and Regulations 4
B Evaluation of suppliers API Spec Q1 5.6.1.2c Oil and Gas Industry Standards and Regulations 2
T API 4F & 7K license - Add Mexico location? Oil and Gas Industry Standards and Regulations 5
B Validating calibration certificate as per API Q1 General Measurement Device and Calibration Topics 9
B API 5L for Cold Drawn Pipes Oil and Gas Industry Standards and Regulations 2
G API 5DP Monogram Licensee Oil and Gas Industry Standards and Regulations 6
H API monogram 4F - Certification process Oil and Gas Industry Standards and Regulations 2
N API Q1, Management of Change & Document Change Request Oil and Gas Industry Standards and Regulations 4
N API Q1 Audit Surveillance - Questions Oil and Gas Industry Standards and Regulations 2
J Help to understand and response to API AAR during the re-certification audit Oil and Gas Industry Standards and Regulations 17
J QTC Requirement as per API 6A-21st Edition Oil and Gas Industry Standards and Regulations 1
D What are the Activity deemed critical for the API 6D Ball Valve ? Oil and Gas Industry Standards and Regulations 4
Q API Spec Q1 9th Ed 4.4.2 Non-conformance Oil and Gas Industry Standards and Regulations 8
J API Q1 4.3.2.2 Personnel Competence for Internal Auditors Oil and Gas Industry Standards and Regulations 5
H API monogram 4F, The difference between PSL-1 & PSL-2 Oil and Gas Industry Standards and Regulations 5
D How to testing of Pressure relief valve as per API 6D ? Oil and Gas Industry Standards and Regulations 1
J API Spec 6D 25th edition release date? Oil and Gas Industry Standards and Regulations 23
P API Q1 - Monogram Product & API 4F - Proof Load Test Oil and Gas Industry Standards and Regulations 3
L API Q1 Application Oil and Gas Industry Standards and Regulations 2
U Need Help With API Q2 Quality Manual Oil and Gas Industry Standards and Regulations 8
lanley liao Confusion between national standard and API related standard. Oil and Gas Industry Standards and Regulations 8
T API Q1 9th edition 5.4.3 c) and 5.4.3 d) Oil and Gas Industry Standards and Regulations 13

Similar threads

Top Bottom