Hi
Assuming a job shop that does not design and only produces to customer drawings. For use-as-is or repair dispositions, do all have to be submitted to the customer for approval? If yes, is this requirement derived from 8.3, 8.3.1 or 8.3.3? 8.3 does say (where applicable, by customer). Where applicable does perhaps leave a little wiggle room. Also, manytimes it is a contractual requirment by the customer.
Assuming a job shop that does not design and only produces to customer drawings. For use-as-is or repair dispositions, do all have to be submitted to the customer for approval? If yes, is this requirement derived from 8.3, 8.3.1 or 8.3.3? 8.3 does say (where applicable, by customer). Where applicable does perhaps leave a little wiggle room. Also, manytimes it is a contractual requirment by the customer.
Last edited by a moderator: