N
Any thoughts on the usefulness of applying (P)FMEA concepts to all the steps leading up to releasing a job into production - including reviewing customer specs, order entry, creating the manufacturing drawing, mapping the process, scheduling, etc.?
The steps leading up to manufacture are processes after all, and it is PROCESS-FMEA.
Also, aside from what's required for PPAP, how about not creating a PFMEA specific to each new job, but instead having one living document that is all encompassing for each pre-production processes.
Thanks in Advance!
The steps leading up to manufacture are processes after all, and it is PROCESS-FMEA.
Also, aside from what's required for PPAP, how about not creating a PFMEA specific to each new job, but instead having one living document that is all encompassing for each pre-production processes.
- Anyone doing FMEA on pre-production processes?
- Is there maybe another tool that would suit this example better?
Thanks in Advance!