I would like to seek advise on the following question.

Currently, our company is QS 9000 certified and we have an APQP process in place. However, due to the dynamism of the business, APQP activity is seen as an obstacle rather than a help. I'm trying to revise the format in which APQP is carried out now (we have a APQP checklists for all personnel involved to check and update).

Can you recommend any simple, effective format that I can use and that will conform to the QS 9000 standard?

Thanks alot!
 
Elsmar Forum Sponsor
J
#2
Can you provide a little more detail on your current system/business?

You say your using check sheets. Is that for every order?
Do you run many different parts through the same set of processes?

If so you may want to do an APQP on your processes rather than on your parts. Then you can describe and control via processes.

For instance:
Type "A" parts go through processes 1-3-4-6-8.
Type "B" parts go through 1-2-5-6...

once this is established, the only time you would have to do a formal APQP, is if your processes change, or if the job is particularly different, or challanging.

hope this helps.

James
 
D

Daniel

#3
Thanks James for that feedback.

My company basically installs and qualify equipment at our customer sites. We also provide warranty and post-warranty services.

We have many new equipment coming in all the time and the question now is that do we need APQP for every single equipment we are to install?

Is there a simple way of conforming to APQP requirements based on the above situation?

Thanks.
 
A

Al Dyer

#5
Originally posted by Daniel:
Thanks James for that feedback.

My company basically installs and qualify equipment at our customer sites. We also provide warranty and post-warranty services.

We have many new equipment coming in all the time and the question now is that do we need APQP for every single equipment we are to install?

Is there a simple way of conforming to APQP requirements based on the above situation?

Thanks.
Believe it or not, APQP is not that complicated if planned correctly. If you are talking about QS-9000, the APQP manual is a guide, not a specific requirement to follow as written in the book.

It allows you to define how you go about the activity. As asked above, maybe some more information. I think that if you are bringing in a new machine that there is a reason for it, either a process change or a new product, which would require a new APQP or at least a review of the current APQP/PPAP.

One question, you say you are having a hard time getting buy-in for the APQP process, is top management involved as leaders or is their focus the bottom line.

In my experience, middle management follows the views of upper management, good or bad.

ASD...
 
J
#6
Daniel,

Don't Know if I can be of much help here as I am not in the installation/service business.

I still think that you have to either do APQP on your products or on your processes. If you can do at least some of your processes, you can avoid "reinventing the wheel".

I like your idea of checksheets. It provides a quick consistant way of recording the tasks, and I don't know if there is a simpler way or not.

Perhaps the best solution is to get everone together, and see what can be worked out.
Explain that APQP must be done, but maybe there is a better way. "Let's work together to find it". Let them bring ideas to the table. It may be that they will convince themselves that the current system is the best that can be had.

Best of Luck

James

------------------
Low tech is better than no tech.

[This message has been edited by JRKH (edited 31 July 2001).]
 
Thread starter Similar threads Forum Replies Date
Sidney Vianna SCMH Awareness Webinar Focused on the revised Advanced Product Quality Planning APQP AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 0
G APQP (advanced product quality planning) for cable assemblies APQP and PPAP 1
A When do you start the Advanced Product Quality Planning (APQP) Process? APQP and PPAP 10
G APQP Scope and scale tool APQP and PPAP 2
G AS9145/APQP return on investment APQP and PPAP 6
Pau Calvo PPAP customer requirements in the APQP APQP and PPAP 22
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 0
B What is the role of Quality Engineer in APQP and PPAP APQP and PPAP 3
S APQP Relationship Diagram APQP and PPAP 2
C Looking for APQP Training recommendations preferably in the aerospace industry APQP and PPAP 2
G Engineering Specifications - APQP APQP and PPAP 5
K APQP Gates_Project/Product Localization APQP and PPAP 4
K APQP Phase 3 - Team Feasibility Commitment APQP and PPAP 3
A New Supplier implementation - PPAP vs APQP APQP and PPAP 9
F APQP for Medical Devices APQP and PPAP 4
A How to view supplier APQP timeline and do risk management APQP and PPAP 4
J Does anyone have a good APQP template that meets IATF requirements? APQP and PPAP 3
kedarg6500 APQP & PPAP for Process Industry - Concept for Waste to Energy Program APQP and PPAP 0
H Prerequisites for AIAG APQP/PPAP Certification Exam? Training - Internal, External, Online and Distance Learning 1
J APQP Requirements - What is meant by "among other items" IATF 16949 - Automotive Quality Systems Standard 2
K Is APQP Required for All Projects? APQP and PPAP 4
S APQP, PPAP and PSW Question from a Rookie APQP and PPAP 4
K APQP requirement when a new print or spec is received from a customer - Existing Part APQP and PPAP 3
C What is the SOEP in APQP? APQP and PPAP 6
S How can I make a Process Flow Diagram for APQP process Manufacturing and Related Processes 2
M APQP and PPAP for Beginners - Where do I start? APQP and PPAP 48
R Looking for good, low cost APQP Software recommendations APQP and PPAP 2
W Certification on AS9100C - FAI or PPAP? Project Management or APQP? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 11
I Any recommendations on software for managing the APQP, PPAP, PFMEA, Control Plan etc? Quality Assurance and Compliance Software Tools and Solutions 2
L Continental Automotive (or any other big German OEM) APQP list wanted VDA Standards - Germany's Automotive Standards 5
M APQP for Non-Automotive Suppliers APQP and PPAP 6
Q Consult "GM APQP" Step1: Key Stakeholders Meeting - GM 1927-18 APQP and PPAP 5
A APQP in Bombardier APQP and PPAP 1
Q Need guidance new APQP and PPAP Process Improvement Software Idea Quality Assurance and Compliance Software Tools and Solutions 1
S Please Review my APQP Training Material APQP and PPAP 4
Q Electronic APQP System APQP and PPAP 7
T APQP and PPAP in an AS9100 plant APQP and PPAP 2
J Question about APQP Control Plans FMEA and Control Plans 2
J What are the Design Factors in APQP? APQP and PPAP 3
J Three Best Practices and Lessons Learned in APQP APQP and PPAP 1
T PPAP & APQP - What other sectors are Adopting/Adapting these Concepts? APQP and PPAP 14
W Production Trial Run in AIAG APQP and Run at Rate (GP-9) GM 1927 APQP and PPAP 2
L Request APQP Process Internal Audit checklist APQP and PPAP 2
J APQP Project Management in Excel - Many projects APQP and PPAP 8
J Email Reminder through Excel for APQP Planning Excel .xls Spreadsheet Templates and Tools 6
G APQP Timing Plan Template attached APQP and PPAP 3
B Frequently asked PPAP, FMEA, SPC, MSA, APQP & 7QC Tools questions for Interviews Career and Occupation Discussions 1
GURU SDI APQP Procedure For Sand Casting Process APQP and PPAP 6
Jim Wynne APQP, or Why Things Always Go Wrong APQP and PPAP 0
Jim Wynne Adventures in APQP Imported Legacy Blogs 9
Similar threads


















































Top Bottom