APQP Appendix F - Product Quality Planning Summary And Sign-off

Richard.L.Holland

Starting to get Involved
#1
:eek: Can some one help me with Appendix F "Product Quality Planning Summary And Sign-off" form. When is the form signed off? When all pending actions have been done, which does not sound correct.
Help I need to talk to some one !!!!
 
Elsmar Forum Sponsor

Howard Atkins

Forum Administrator
Staff member
Admin
#2
from page 27 of the APQP Handbook
Management support is necessary prior to the quality planning sign-off. The team should be able to
show that all planning requirements are met or concerns documented and schedule a management
review. The purpose of this review is to inform upper management of program status and gain their
commitment to assist in any open issues. The Product Quality Planning Summary and Sign-Off report
shown in Appendix F is an example of the documentation required to support an effective quality
planning sign-off.
This seems to be to be quite clear.
If you have problems repost
 
#5
We use a form similar to this. We sign it off at the completion of the APQP process before running our sample for PPAP submission.
 
A

Andrews

#6
Product Quality Summary

This form seems to check whether activities like PPk study, MSA has been completed. But the APQP manual requires these activites to be completed before PPAP is submitted. So it makes no sense to use this check list after PPAP is submitted. I think this should be done just before PPAP submitted. Any other thoughts on this topic?
 
R
#8
Richard,

Pls. educate me. I did not understand what Feasibility has to do with "Product Quality Planning Summary And Sign-off" form?
 
A

Al Dyer

#9
rak,

Absolutely nothing, the form is not a required piece of paper for submission to the B3, just a form available for your use as you see fit.

There is also no "official" feasibility form, Feasibility is enacted during the contract review phase of the process and is not a required for.

Of course, if your customer requires it, youneed to comply!
 

Howard Atkins

Forum Administrator
Staff member
Admin
#10
Feasibility Reviews - 4.2.3.3
The supplier shall investigate and confirm the manufacturing feasibility of proposed products prior to contracting to produce those products.
Feasibility is an assessment of the suitability of a particular design, material, or process for production, while conforming to all engineering requirements at the required statistical process capability and at specified volumes. Feasibility reviews should be documented using the Team Feasibility Commitment in the Advanced Product Quality Planning and Control
Plan reference manual.
The word “shall” indicates mandatory requirements. The word “should” indicates a mandatory requirement with some flexibility allowed in compliance methodology. Suppliers choosing other approaches to satisfy a “should” must be able to show that their approach meets the intent of QS-9000. All QS-9000 requirements shall be addressed in the quality system documentation, but not necessarily by individual procedures.
Approach QS-9000

Whilst there is no offical form the demand is that you use a method that is as per the form referenced in the APQP book.
 
Thread starter Similar threads Forum Replies Date
G Issues/Roadblocks with APQP implementation APQP and PPAP 7
G APQP Scope and scale tool APQP and PPAP 2
G AS9145/APQP return on investment APQP and PPAP 6
Pau Calvo PPAP customer requirements in the APQP APQP and PPAP 25
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
B What is the role of Quality Engineer in APQP and PPAP APQP and PPAP 3
S APQP Relationship Diagram APQP and PPAP 2
C Looking for APQP Training recommendations preferably in the aerospace industry APQP and PPAP 2
G Engineering Specifications - APQP APQP and PPAP 5
K APQP Gates_Project/Product Localization APQP and PPAP 4
K APQP Phase 3 - Team Feasibility Commitment APQP and PPAP 3
A New Supplier implementation - PPAP vs APQP APQP and PPAP 9
F APQP for Medical Devices APQP and PPAP 4
A How to view supplier APQP timeline and do risk management APQP and PPAP 4
J Does anyone have a good APQP template that meets IATF requirements? APQP and PPAP 3
Sidney Vianna SCMH Awareness Webinar Focused on the revised Advanced Product Quality Planning APQP AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
kedarg6500 APQP & PPAP for Process Industry - Concept for Waste to Energy Program APQP and PPAP 0
H Prerequisites for AIAG APQP/PPAP Certification Exam Training - Internal, External, Online and Distance Learning 2
J APQP Requirements - What is meant by "among other items" IATF 16949 - Automotive Quality Systems Standard 2
K Is APQP Required for All Projects? APQP and PPAP 4
S APQP, PPAP and PSW Question from a Rookie APQP and PPAP 4
K APQP requirement when a new print or spec is received from a customer - Existing Part APQP and PPAP 3
C What is the SOEP in APQP? APQP and PPAP 6
S How can I make a Process Flow Diagram for APQP process Manufacturing and Related Processes 2
M APQP and PPAP for Beginners - Where do I start? APQP and PPAP 48
R Looking for good, low cost APQP Software recommendations APQP and PPAP 2
W Certification on AS9100C - FAI or PPAP? Project Management or APQP? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
I Any recommendations on software for managing the APQP, PPAP, PFMEA, Control Plan etc? Quality Assurance and Compliance Software Tools and Solutions 2
L Continental Automotive (or any other big German OEM) APQP list wanted VDA Standards - Germany's Automotive Standards 5
M APQP for Non-Automotive Suppliers APQP and PPAP 6
Q Consult "GM APQP" Step1: Key Stakeholders Meeting - GM 1927-18 APQP and PPAP 5
A APQP in Bombardier APQP and PPAP 1
Q Need guidance new APQP and PPAP Process Improvement Software Idea Quality Assurance and Compliance Software Tools and Solutions 1
S Please Review my APQP Training Material APQP and PPAP 4
Q Electronic APQP System APQP and PPAP 7
T APQP and PPAP in an AS9100 plant APQP and PPAP 2
J Question about APQP Control Plans FMEA and Control Plans 2
J What are the Design Factors in APQP? APQP and PPAP 3
J Three Best Practices and Lessons Learned in APQP APQP and PPAP 1
T PPAP & APQP - What other sectors are Adopting/Adapting these Concepts? APQP and PPAP 14
W Production Trial Run in AIAG APQP and Run at Rate (GP-9) GM 1927 APQP and PPAP 2
L Request APQP Process Internal Audit checklist APQP and PPAP 2
J APQP Project Management in Excel - Many projects APQP and PPAP 8
J Email Reminder through Excel for APQP Planning Excel .xls Spreadsheet Templates and Tools 6
G APQP Timing Plan Template attached APQP and PPAP 3
B Frequently asked PPAP, FMEA, SPC, MSA, APQP & 7QC Tools questions for Interviews Career and Occupation Discussions 1
GURU SDI APQP Procedure For Sand Casting Process APQP and PPAP 6
Jim Wynne APQP, or Why Things Always Go Wrong APQP and PPAP 0
Jim Wynne Adventures in APQP Imported Legacy Blogs 9
R What does P-release mean in APQP documents regarding drawings and approvals? Design and Development of Products and Processes 1

Similar threads

Top Bottom