Search the Elsmar Cove!
**Search ALL of Elsmar.com** with DuckDuckGo including content not in the forum - Search results with No ads.

Are there any aerospace specific requirements for material resource planning?

John Predmore

Involved In Discussions
#2
Section 8.1 of ISO-9001 covers Operational Planning and Control. AS9100 has expanded requirements in 8.1 . There is no mention of MRP software, per se. The organization decides how to best accomplish the requirements, using software or a different approach.
 
Top Bottom