AS 9100a Clause 7.4.3 - Verificaton Of C of C (Certificate of Compliance)

DAHSR

Registered Visitor
#1
As9100a 7.4.3 Verificaton Of C Of C

I am looking for ideas on how to validate certificate of compliance received with product/raw materials IAW AS9100A 7.4.3.
 
Elsmar Forum Sponsor

CarolX

Super Moderator
Super Moderator
#2
DAHSR said:
I am looking for ideas on how to validate certificate of compliance received with product/raw materials IAW AS9100A 7.4.3.
Hello DAHSR and welcome to the Cove.

I have been out of the aircraft business for a while, but what I use to do was to perform and independent test on each mill once a year. We would send a sample out to a local labe, have them perform the tests and then compare the results with the mill test report sent with the shipment.

I don't know much about the spec....but I hope this helps.

CarolX
 

howste

Thaumaturge
Super Moderator
#3
Validation can be done by sending material out for an independent lab analysis, or by doing analysis in-house if you have the capability. I believe the intent is to correlate results and to establish confidence in your supplier's test results.
 

Wes Bucey

Prophet of Profit
#4
howste said:
Validation can be done by sending material out for an independent lab analysis, or by doing analysis in-house if you have the capability. I believe the intent is to correlate results and to establish confidence in your supplier's test results.
Howtse' suggestion and Carol's solution are similar to a service we provided for our customers when I was in the high tech contract machining business in which we dealt with a lot of exotic alloys.

We would take one or several "coupons" (test size sample) of the bar stock or ingot, tag and store it with a copy of the mill cert. We offered each customer the option of having us send out the coupon to an independent metallurgy lab for a comparison to the mill specs listed on the cert. We held the coupon with our quality records until retention period was up and then offered it to the customer to hold for reference. We notified all our raw material suppliers of our policy as part of our purchase contract, including a clause we would hold them liable for any substantial discrepancy, not least of which would be the cost of the analysis. Two of our suppliers thought it was such a good idea, they asked us to cut a coupon for them as well, with the agreement we would send random coupons to our independent lab at the supplier's notice and expense as a check on his own internal analysis procedures.

Obviously, if you have the coupons in hand, only random samples are sent to the lab to confirm supplier's certs unless there is a failure somewhere down the line and confirmation/traceability of the material is a critical factor.
 

DAHSR

Registered Visitor
#5
As9100a 7.4.3 Verificaton Of C Of C

It seems I would have to send out a sample of a raw material, like aluminum for independent lab analysis. Does this apply to ALL raw materials, like chemicals I use, paints & thinners, glues and adhesives? What about nuts, bolts & screws or electronic components?
 

Wes Bucey

Prophet of Profit
#6
DAHSR said:
It seems I would have to send out a sample of a raw material, like aluminum for independent lab analysis. Does this apply to ALL raw materials, like chemicals I use, paints & thinners, glues and adhesives? What about nuts, bolts & screws or electronic components?
It may not even be necessary to send it out and pay for the analysis in advance, if you trust your supplier. Just keep a sample tagged and handy with a copy of the supplier's cert should the occasion arise where the supplier's certificate of conformance comes into question. (If you do a good supplier survey, you will know whether you can trust it, subject to an error at the supplier. Like grandpappy says, "Trust everybody, but count the cards!")

It seems to me that each organization has separate requirements for what needs to be tracked and confirmed, just as each organization has different components as part of its product. Customers create one of the major requirements for tracking/confirming components, but regulatory bodies can create the greatest risk.

For example, there are several European nations that ban cadmium plated products or cadmium plated components in complex products, with various penalties for violations. It seems to me, then, any organization whose products might end up in such nations have a need to ensure and document that fact that none of their products start out with cadmium plated components (that any cadmium plated components are probably unauthorized "field replacements" done by unaffiliated third parties.) Without such testing and documentation, the organization has little defense.

True story: My organization ran into this problem 3 years ago. Purchase records and tagged "exemplar" products which had been pulled from production and sent to our lab for functional testing established our innocence with a minimum of fuss. The initial paperwork from the foreign government was VERY scary, though. Our CEO ran around like a goose for a whole day because he had been served with the papers while at a conference in that country. He rested easily when he called us at work during his European supper time and we were able to tell him we were covered. (Kind of reminds me of the Mastercard ad ("Being able to sleep that night - Priceless!")

Also note (for your query "Does this apply to ALL raw materials, like chemicals I use, paints & thinners, glues and adhesives? What about nuts, bolts & screws or electronic components?"), there are "threshhold" amounts of product which need reporting and tracking. Governments have lists of toxic and carcinogenic substances which need to be tracked and reported, but they have reasonable limits. It's up to the organization to keep informed whether a customer or regulatory body will want ANYTHING documented and tracked.
 
Thread starter Similar threads Forum Replies Date
T API SPEC Q1 Clause 5.6.1.2.C).2) First Article Oil and Gas Industry Standards and Regulations 16
A ISO Clause 4.1/4.2 & 6.1 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
K ISO 9001 Clause 8.3 & 8.6 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
J ISO 9001:2015 Clause 8.5.1 Control of Production and service provision - Help with Work Instruction Access ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
P Maximum Mains Voltage (clause 8.5.3) IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
S IATF 16949 - Summary at a glance Clause wise - changes from ISO TS IATF 16949 - Automotive Quality Systems Standard 4
A ISO 14001:2015 clause 4.4 ISO 14001:2015 Specific Discussions 2
M Customer Property - ISO 13485:2016 Clause 7.5.10 ISO 13485:2016 - Medical Device Quality Management Systems 9
D PSW with waiver statement (hold harmless clause) IATF 16949 - Automotive Quality Systems Standard 3
Ashland78 MSA clause or wording needed. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
A IT-NETWORK in PEMS Sub-Clause 14.13 for Medical Device IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
A 60601-1 clause 8.11.3.6 Test Clarification IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
S MSA clause 7.1.5.1.1 - Statistical studies on counting weight scale Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 12
Thee Bouyyy Internal NCR - API Q1 5.4.2b - API 16C Clause 4.1.3 Internal Auditing 9
L ISO 45001:2018 - Clause 5.4: Consultation and Participation of Workers Process Maps, Process Mapping and Turtle Diagrams 1
V Clause 7.1.3.1 Plant, facility, and equipment planning Lean in Manufacturing and Service Industries 0
J Aluminum anodization as MOP insulation? Clause 8.5.1.1 IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
ebrahim QMS as per ISO 13485, Clause 4.2 Requirements for regulatory purposes for Medical Devices Authorized Representatives. ISO 13485:2016 - Medical Device Quality Management Systems 3
R AS5553 Clause 3.1.7 f - "Implement a returns process....." AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
C Requirement to link Quality Manual to ISO 9001 clause numbers? ISO 13485:2016 - Medical Device Quality Management Systems 13
V Setup for testing against ISO14708 clause 16 (protection of the patient from herms caused by heat) Other Medical Device Related Standards 0
M IATF16949 Clause 9.1.2.1e - Customer notification related IATF 16949 - Automotive Quality Systems Standard 4
N 60601-2-2 Ed 6 Clause 201.8.8.3.102 - HF instrument leakage IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
R IEC 60601-1 Clause 15.3.2, Push test IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
A ISO 13485 Sterilization Clause Applicability ISO 13485:2016 - Medical Device Quality Management Systems 7
A AS9100D - Clause 8.1 Operation - Coating service company AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
T AS9100D Clause 10.2.1g Supplier Corrective Action for each and every nonconformity? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
H AS9100D clause 8.5.1 f) & 8.5.1 g) - Special Processes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S ISO 9001 Clause 8.2.3 - Review of the requirements for products and services in a Cafe ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
C ISO/IEC 17021-1 clause 7.1.2 - Determination of competence criteria Document Control Systems, Procedures, Forms and Templates 2
S API Spec. Q1 clause 5.6.1.2 On site evaluation Oil and Gas Industry Standards and Regulations 10
K ISO 13485 clause 8.5.2 'Any necessary CA shall be taken without undue delay' ISO 13485:2016 - Medical Device Quality Management Systems 11
lanley liao How to understand the clause 6 Planning of ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
lanley liao How to understand the term 3.1.21 'Servicing' and the clause 5.7.1.2 'Servicing' of API Spec Q1? Oil and Gas Industry Standards and Regulations 19
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
D Layered Process Audits - FCA 9.2.2 - Exemption Clause? IATF 16949 - Automotive Quality Systems Standard 5
T Single Fault Condition IEC 60601 Clause 8.7.1 shorting Cr/Cl in Patient Applied Part IEC 60601 - Medical Electrical Equipment Safety Standards Series 7
J Scope of ISO 9001 clause 10.2 in the product life cycle ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
E PEMS Hazards - IEC 60601 Clause 14.6 - Internal data use - Pressure sensor IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
S MDR GSPR Clause 17 - Software Requirements EU Medical Device Regulations 2
B IEC 60601-2-43 - Clause 203.6.103 - Physical button? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
K Contamination Control - Class Is medical devices (Clause 6.4.2 ISO 13485:2016 (E)) ISO 13485:2016 - Medical Device Quality Management Systems 12
R Clause 7.7 Replicate, Recalibration and Intermediate checks using Artifact ISO 17025 related Discussions 1
A ISO 13485 - Clause 8.3.3 appropriate actions in response to nonconforming product ISO 13485:2016 - Medical Device Quality Management Systems 2
M Description of the requirements of clause 9.2.2.3 manufacturing process audit- needs your feedback IATF 16949 - Automotive Quality Systems Standard 0
A ISO 41001:2018 - Clause No.8 Operations Part Quality Management System (QMS) Manuals 2
L AS5553 Clause 3.1.7 e "Control packaging material ..................reused" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
R What is meant by Use of COMPONENTS WITH HIGH-INTEGRITY CHARACTERISTICS in ME EQUIPMENT (clause no 4.9) IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
K What is mean by Oxygen Rich Environment as per the IEC 60601-1 clause no 11.2.2 IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
P Definition of production tooling in IATF16949 clause 8.5.1.6 IATF 16949 - Automotive Quality Systems Standard 4

Similar threads

Top Bottom