SBS - The best value in QMS software

AS9100 8.4.2 Type and Extent of Control - External provider test reports

ImLost

Starting to get Involved
#1
Plain English and how in the world to implement it (because apparently our process does not address how to handle this - and stating that we only use test reports to verify product when its required by the customer ~ very, very rarely does not meet the requirement)

When external provider test reports are utilized to verify externally provided products, the organization shall implement a process to evaluate the data in the test reports to confirm that the product meets requirements. When a customer or organization has identified raw material as a significant operational risk (e.g., critical items), the organization shall implement a process to validate the accuracy of test reports.
 
Elsmar Forum Sponsor

ImLost

Starting to get Involved
#3
8.4.2, the statement of the non-conformity was: The organization's process to evaluate the data in the test reports to confirm that the product meets requirements when external provider test reports are utilized to verify externally provided products meet requirements is not effective in all cases.

We added the process that if an customer requires a test report for a part, it will be flowed down to purchasing who will then add it to the PO. The receiving inspector will request an engineer to verify the test results against the required documentation... the only problem for us is that it is very very rare that a customer requires any of these test results, most cases our suppliers send them to us as a part of the C of C package. We keep them just to keep all documentation together - so we dont have a process or anything to do this paragraph of the standard, let alone have any idea how...
 

Pjservan

Involved In Discussions
#4
So in order to perform incoming inspections what is in place to specify what is required? Do you have an inspection plan? Or a instruction/procedure?
 

Sidney Vianna

Post Responsibly
Staff member
Admin
#5
most cases our suppliers send them to us as a part of the C of C package. We keep them just to keep all documentation together - so we dont have a process or anything to do this paragraph of the standard, let alone have any idea how...
I don't understand what you don't understand. You buy raw materials, don't you? How do you verify the raw materials being received are in conformance with the specification they are supposed to comply with? Chemical, mechanical, metallurgical properties, etc. How do YOU ensure the material is conforming?

If you DONT buy raw materials, then you need to give us some context of the organization, products and what exactly the auditor was looking at when the NC was written.
 

ImLost

Starting to get Involved
#6
I don't understand what you don't understand. You buy raw materials, don't you? How do you verify the raw materials being received are in conformance with the specification they are supposed to comply with? Chemical, mechanical, metallurgical properties, etc. How do YOU ensure the material is conforming?

If you DONT buy raw materials, then you need to give us some context of the organization, products and what exactly the auditor was looking at when the NC was written.
We verify against the drawing or spec. Most items (99%) of what we purchase are COT's parts.
 

ImLost

Starting to get Involved
#7
So in order to perform incoming inspections what is in place to specify what is required? Do you have an inspection plan? Or a instruction/procedure?
We have a procedure;

"Test Reports: If the purchase order and/or DANA require a Test Report the inspector will call an engineer or the Quality Engineer to verify the test results against the required documentation. Upon verifying the provided test report and applicable documentation, the engineer/quality engineer shall sign for the acceptance of the test results on the packing slip."
 

Golfman25

Trusted Information Resource
#8
So was the auditor thinking that all test reports had to be verified? Or did you miss verification of some reports identified by the PO/DANA?
 

ImLost

Starting to get Involved
#9
Definitely did not miss any; we will only request test reports for critical or safety related items.
My best guess is because its not stated that we only request and verify/validate test reports for critical or safety related items?
 

Attachments

Thread starter Similar threads Forum Replies Date
A Can a organization use a disclaimer "pending AS9100 Certification" in Marketing Information? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R AS9100D internal audit checklist or ISO 9001 2015 to AS9100 D AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
T AS9100 audit due to facility move AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9100 and ISO9001 together AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Do AS9100 Registrar Auditors have nonconformity quotas? General Auditing Discussions 18
L Heading dies as "tooling" and AS9100 Manufacturing and Related Processes 2
L Heading dies as "tooling" and AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
F AS9100 - Validation, FAIR's, ITAR and Sub-Contracting AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L AS9100 - Product and Service Provision 8.5.1q AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
T Temperature Requirements For In House Calibration - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
G Tool tracebility and First calibration requirements for aerospace (AS9100) organisation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Internal Nonconformance procedure thoughts (AS9100) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
A AS9100 Training - Where do I start? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
SocalSurfer Can you recommend an enterprise QMS for new AS9100 startup AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L Open Positions During AS9100 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
SocalSurfer AS9100 new certificate, but need QMS software, help Quality Assurance and Compliance Software Tools and Solutions 2
C AS9120 or AS9100 Cert pertaining to inventory? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
H AS9100 Checklist for Internal Audit needed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
hockeyhead Existing process never included in AS9100 scope of certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
W Major NCRs within AS9100 - What is the most frequent reason for Major NCRs? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q AS9100:2016 D - Intent of 8.4.3 (K) - Implement QMS AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
was named killer AS9100 Supplier Approval Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9100 8.4.1 Supplier Selection/Evaluation criteria and reevaluations AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
S Effective nonconforming process for AS9100 8.7 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
O Adding ISO 13485 to an AS9100 QMS ISO 13485:2016 - Medical Device Quality Management Systems 13
M Customers Request AS9100 certification - Small Company (less than 20 employees) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
NDesouza AS9100 - D Capacity Planning Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D ISO 9001 & AS9100 Certificate issued by a consultant for a Distributor Registrars and Notified Bodies 11
B FAR/Prime Contractor Flow-down Tool - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9100 - 7.3 - Are these black and white questions with specific correct answers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Does AS9100 require traceability to operators performing the work? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R Traceability on Unmarked Parts - AS9100 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M When is FAI required? AS9100 8.5.1.3 and 8.4.3 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Ethics and Legality AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K Counterfeit parts prevention - Audit Nonconformance - AS9100 8.2.2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 25
classical_quality AS9100 Surveillance Audit - advice on drafting strong responses AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
L AS9100 - Infrastructure or Product? Inflight internet connectivity network AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
T AS9100 - Changing PEARs target AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 41
R AS9100 DELTA FAI - Sub-supplier for plating changed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
G AS9100-8.1.2 Configuration Management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R AS9100 REV D gap analysis matrix AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
Sidney Vianna Informational New IAQG Document - AS9100 Clarifications of Intent AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E Recommendations for CBs south of England AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
T Was Just told we could ONLY buy material for AS9100 customers if the DISTRIBUTION house is AS9100 / AS9120 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E AS9100 installtion procedure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
Q Connecting AS9100 D Clause 4.2 to 9.3.2 b - Interested parties and relevant issues AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
D AS9100 Inspection records - Is there a requirement to have gauge ID and calibration status AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5

Similar threads

Top Bottom