SBS - The best value in QMS software

AS9100:C PEARs (Process Effectiveness Assessment Report)

dsanabria

Quite Involved in Discussions
#71
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Hi All,
I am a minimalist and would like the auditor to apply PEAR’s to as few processes as possible. Does anyone have a clear understanding of the minimum number of processes required? For example, we do very little product design. So, can I ignore that process?
Thanks
Rick
Try these as a beginning point and modified them as required!
 
Elsmar Forum Sponsor

rickpaul01

Involved in HankyPanky
#72
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Hi Sidney,
The reason I am getting confused is because of the PEAR instructions. It states the processes as “determined by the organization”. Again, what do you think the minimum might be?
Thanks
Rick
 

dsanabria

Quite Involved in Discussions
#73
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Try these as a beginning point and modified them as required!
OK - with attachments!
 

Attachments

Buckyb

Involved In Discussions
#74
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Our organization has had a number of discussions about this. We did a lot of research and decided it was up to us. We concluded that we could have as many or as few as necessary to express how we do business. I have attached a Process Matrix that we are using. Hope some find it useful. I have a vsd copy if anyone would like it to modify for your organization. Gotta love AS9100C :rolleyes:
 

Attachments

howste

Thaumaturge
Super Moderator
#75
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Our organization has had a number of discussions about this. We did a lot of research and decided it was up to us. We concluded that we could have as many or as few as necessary to express how we do business. I have attached a Process Matrix that we are using. Hope some find it useful. I have a vsd copy if anyone would like it to modify for your organization. Gotta love AS9100C :rolleyes:
Bucky, the diagram you have is very pretty. However, at the risk of beating a dead horse here (this has been discussed many times in other threads)...

Do you really just happen to have four processes in your system that just happen to have the same names as clauses 5 through 8 of AS9100? Is it coincidence that the "QMS Process Map" you created looks just like the diagram in clause 0.2 of the standard rotated 90°? If this is how your processes are identified in your manual, can you please explain how this diagram describes the interactions between the QMS processes?
 

Big Jim

Super Moderator
#76
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

Bucky, the diagram you have is very pretty. However, at the risk of beating a dead horse here (this has been discussed many times in other threads)...

Do you really just happen to have four processes in your system that just happen to have the same names as clauses 5 through 8 of AS9100? Is it coincidence that the "QMS Process Map" you created looks just like the diagram in clause 0.2 of the standard rotated 90°? If this is how your processes are identified in your manual, can you please explain how this diagram describes the interactions between the QMS processes?
The Deming Wheel just continues to be reinvented. Over and over and over again. But if it works for the standard, why not for the organization? I agree though, that it isn't likely that the process names are really the ones used by very many organizations.
 
Last edited by a moderator:

Buckyb

Involved In Discussions
#77
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

I do appreciate most comments and feedback here but I have to take exception to the Demming comments. I came to this forum to seek help from folks who have been at this game for more years and with much more experience than I. However, I look at the attachments that dsanabria posted and other posts on this forum and I see little difference. The diagram doesn't just happen to look like clause 0.2 of the Standard, it is modeled after it intentionally, not coincidentally. Having said that here is our sub-processes using four colors to represent the four processes which also happen to match clauses 5 through 8 of the Standard. The attachment is how we function as a business which shows interaction of all the processes and sub-processes. We REALLY do business just as the flow diagram shows. Have I overlooked bread crumbs along the way? :confused:
 

Attachments

dsanabria

Quite Involved in Discussions
#78
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

I do appreciate most comments and feedback here but I have to take exception to the Demming comments. I came to this forum to seek help from folks who have been at this game for more years and with much more experience than I. However, I look at the attachments that dsanabria posted and other posts on this forum and I see little difference. The diagram doesn't just happen to look like clause 0.2 of the Standard, it is modeled after it intentionally, not coincidentally. Having said that here is our sub-processes using four colors to represent the four processes which also happen to match clauses 5 through 8 of the Standard. The attachment is how we function as a business which shows interaction of all the processes and sub-processes. We REALLY do business just as the flow diagram shows. Have I overlooked bread crumbs along the way? :confused:
See attachment: (Not posted before)

Take the linear and simple approached - then you could sub dive the process as required and develop a process approach that works for your company - note - this is the beginning process.

(Not a copy of the template that the standards shows. In addition, please note the clauses pertaining to each process is noted - thus 4.2.2 in merged into this simple flowchart.)
 
#79
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

I agree with Buckyb, the organization should be able to decide how many processes are identified. We call them our CORE processes and prefer to keep them at a minimum. Every thing else is an activity (ex. inprocess inspection, shipping). The measurements takes for our Core processes are supported by the data collected in various activities.
 

Buckyb

Involved In Discussions
#80
Re: AS9100:C PEAR's (Process Effectiveness Assessment Report)

See attachment: (Not posted before)

Take the linear and simple approached - then you could sub dive the process as required and develop a process approach that works for your company - note - this is the beginning process.

(Not a copy of the template that the standards shows. In addition, please note the clauses pertaining to each process is noted - thus 4.2.2 in merged into this simple flowchart.)
Dsanabria,

I did see your three attachments several days ago in a post. Are you referring to one of these in your latest post or do you have another attachment that did not attach?
 
Thread starter Similar threads Forum Replies Date
T AS9100 - Changing PEARs target AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 41
W AS9100 Rev C PEARs - Grouping Processes Document Control Systems, Procedures, Forms and Templates 3
Crusader AS9100 7.5.2 NOTE Approval methods identified AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Can a organization use a disclaimer "pending AS9100 Certification" in Marketing Information? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R AS9100D internal audit checklist or ISO 9001 2015 to AS9100 D AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
T AS9100 audit due to facility move AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9100 and ISO9001 together AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Do AS9100 Registrar Auditors have nonconformity quotas? General Auditing Discussions 18
L Heading dies as "tooling" and AS9100 Manufacturing and Related Processes 2
L Heading dies as "tooling" and AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
F AS9100 - Validation, FAIR's, ITAR and Sub-Contracting AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L AS9100 - Product and Service Provision 8.5.1q AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
T Temperature Requirements For In House Calibration - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
G Tool tracebility and First calibration requirements for aerospace (AS9100) organisation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Internal Nonconformance procedure thoughts (AS9100) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
A AS9100 Training - Where do I start? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
SocalSurfer Can you recommend an enterprise QMS for new AS9100 startup AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L Open Positions During AS9100 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
SocalSurfer AS9100 new certificate, but need QMS software, help Quality Assurance and Compliance Software Tools and Solutions 2
C AS9120 or AS9100 Cert pertaining to inventory? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
H AS9100 Checklist for Internal Audit needed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
hockeyhead Existing process never included in AS9100 scope of certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
W Major NCRs within AS9100 - What is the most frequent reason for Major NCRs? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q AS9100:2016 D - Intent of 8.4.3 (K) - Implement QMS AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
was named killer AS9100 Supplier Approval Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9100 8.4.1 Supplier Selection/Evaluation criteria and reevaluations AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
S Effective nonconforming process for AS9100 8.7 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
O Adding ISO 13485 to an AS9100 QMS ISO 13485:2016 - Medical Device Quality Management Systems 13
M Customers Request AS9100 certification - Small Company (less than 20 employees) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
NDesouza AS9100 - D Capacity Planning Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D ISO 9001 & AS9100 Certificate issued by a consultant for a Distributor Registrars and Notified Bodies 11
B FAR/Prime Contractor Flow-down Tool - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9100 - 7.3 - Are these black and white questions with specific correct answers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Does AS9100 require traceability to operators performing the work? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R Traceability on Unmarked Parts - AS9100 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M When is FAI required? AS9100 8.5.1.3 and 8.4.3 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Ethics and Legality AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K Counterfeit parts prevention - Audit Nonconformance - AS9100 8.2.2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 25
classical_quality AS9100 Surveillance Audit - advice on drafting strong responses AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
L AS9100 - Infrastructure or Product? Inflight internet connectivity network AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R AS9100 DELTA FAI - Sub-supplier for plating changed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
G AS9100-8.1.2 Configuration Management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R AS9100 REV D gap analysis matrix AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
Sidney Vianna Informational New IAQG Document - AS9100 Clarifications of Intent AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E Recommendations for CBs south of England AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
T Was Just told we could ONLY buy material for AS9100 customers if the DISTRIBUTION house is AS9100 / AS9120 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E AS9100 installtion procedure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0

Similar threads