On our recent 9100C "upgrade" audit, we received the following nonconformance under Clause 7.2.2 in our Sales process:

"There is a lack of documented evidence that Special requirements of the product are determined, and risks have been identified."

Typical "Special Requirements" for us would be new materials, unproven applications, short delivery times, etc. While we do a good job resolving these before contract acceptance, there doesn't seem to be an easy, clear, consistent way of:
1) Indicating in our ERP system "Yes/No" as to whether an order includes any "Special Requirements"
2) Documenting the evidence that we have identified, evaluated, mitigated and/or accepted the risks involved.

Does anyone have a good method of dealing with this clause? Any ideas as to how to respond to the nonconformance?
 
Elsmar Forum Sponsor

dsanabria

Quite Involved in Discussions
#2
On our recent 9100C "upgrade" audit, we received the following nonconformance under Clause 7.2.2 in our Sales process:

"There is a lack of documented evidence that Special requirements of the product are determined, and risks have been identified."

Typical "Special Requirements" for us would be new materials, unproven applications, short delivery times, etc. While we do a good job resolving these before contract acceptance, there doesn't seem to be an easy, clear, consistent way of:
1) Indicating in our ERP system "Yes/No" as to whether an order includes any "Special Requirements"
2) Documenting the evidence that we have identified, evaluated, mitigated and/or accepted the risks involved.

Does anyone have a good method of dealing with this clause? Any ideas as to how to respond to the nonconformance?
First, you know you could appeal the NCR.

Second, was the auditor clear in his statement about "Lack of Documented evidence" since it is not a clear requirement but an implied requirement - if there are any special requirements.

NOTE AS9101 D - 4.2.2.5 - NOTE 3: If there is no evidence of non-fulfillment of a requirement, the auditor cannot issue a nonconformity.

and finally, the information you provided is not sufficient to provide you with scenario on how to approach it.

I hope that you and the auditor came to a clear understanding of the NCR - if not call the registrar and ask them ro review the evince or send a PM.
 
Thread starter Similar threads Forum Replies Date
Q Connecting AS9100 D Clause 4.2 to 9.3.2 b - Interested parties and relevant issues AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 24
A Definition of "Sensitive Products" Clause 8.5.4 (c) in AS9100 Rev. D AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
C AS9100, Clause 8.5.1.3 - First Article Inspection Costs AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 16
J Not Design Responsible - Can we exclude all or parts of AS9100 clause 8.3 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
I How to satisfy with AS9100 Clause 8.4.3 a, Information for external providers? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
oldqamanager How will you handle Clause 6.1 - Risks and Opportunities for AS9100 Rev. D Auditors? Risk Management Principles and Generic Guidelines 22
howste AS9100 Rev D Clause 10.2 - Is Cause always required? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 39
W AS9100 Clause 8.5.1.3 Production Run Verification AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 14
W Evidence for Review of Requirements - AS9100 Clause 7.2.2 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
A AS9100 Clause 7.1.1 Project Management - Process vs Project. AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
W Checklist for AS9100 Clause 7.2.2 Review Of Requirememts Related to Product AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
W AS9100 Clause 8.2.3.C Monitoring and Measurement of Processes AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 10
S Process Monitoring and Measurement - AS9100 Clause 8.2.3 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
R Verification of Process Changes (AS9100 clause 7.5.1.2) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
Z AS9100 Clause 7.4.2.d Revision Letter Flow Down to Suppliers AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 12
M Management Review - AS9100 Clause 5.6.3 Review Output AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 12
V Application of AS9100 clause 7.5.1.1 - Tooling Supplier AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
G AS9100 clause for Repeat Orders AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
M Compliance with AS9100 clause 7.5.1.3 Ctrl of Equipment, Tools and SW Programs AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
Q AS9100 Clause 8.3 - Control of Nonconforming Product Process for Approving Personnel AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
M Changes Assessment as per AS9100 Clause 7.5.1.2 Control of Production Process Changes AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
M Understanding AS9100 Clause 7.5.1.4 Post-Delivery Support Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
G AS9100 Clause 7.5.1.1 Production Process Verification Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
M Interpreting AS9100 Clause 8.2.2 Internal Audit Requirements Internal Auditing 28
J AS9100 Clause 7.4.3 Verification of Purchased Product - OEM C of C required? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
B AS9100 Clause 8.2.3.C Monitoring and Measurement and 8.5.2 Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
C AS9100 C Clause 8.3 - Personnel Approval Process AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
C AS9100 Rev C Clause 8.5.2 - CAR (Corrective Action Request) Format AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 14
B AS9100 Clause 7.3.3 - Design and Developement Requirements d and e AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
J Production Process Verification - AS9100 Clause 7.5.1.1 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 9
Q AS9100 Clause 7.4.1 Purchasing Process and Approved Supplier List Records AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 37
M AS9100 Clause 4.2.3 requirements - Documents required by the QMS shall be Controlled AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 13
R AS9100C Special Process Procedure - Work Instruction for AS9100 Clause 7.5.2 wanted AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
G AS9100 Clause 7.1.4 Control of Work Transfers clarification AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 12
S AS9100 Clause 8.3 - Control of Nonconforming Product Q AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 13
quality1 AS9100 Clause 8.3 Control of Nonconforming Product - Clarification wanted AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
P Intercompany Work Transfer according to AS9100 Clause 7.1.4 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
O Clause Interpretations related to AS9100 Implementation AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 14
I Standard vs. Specification & AS9100 Clause 7.4.2 (d) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
H Planning of Product Realization - AS9100 Clause 7.1 - Can we exclude 7.1f? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
S Is Configuration Management Mandatory? AS9100 Clause 7.1.3 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 9
S Problem Collecting In-Service Data (AS9100 Clause 7.5.1.4) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
A Understanding AS9100 Clause 7.5.2 Validation of Processes for Production and Service AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
Q What is considered a Training Record? AS9100:2004 Clause 6.2.2 Records and Data - Quality, Legal and Other Evidence 8
B Question about the word "Design" in AS9100 Clause 8.3 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
M New to AS9100 - Clause 7.5.3 - Do you have to identify each part produced AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
J Project Management Procedure - AS9100 Clause 7.1.1 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 15
E Meeting AS9100 Clause 6.3 Infrastructure Requirements - Preventive Maintenance AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
C Definition Repair Schemes - Definition - AS9100 Clause 7.5.1.5 Control of Service Operations Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 5
L How to comply with AS9100 Clause 7.6 - Monitoring and measuring devices to be used AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 31
Similar threads


















































Top Bottom