Hello everyone,
I recently joined an aerospace start-up company, and we're in the process of drafting our procedures. Currently, we're in the prototype phase and don't yet have real customers until we launch our first rocket. Therefore, we're performing 100% quality checks for the items/parts produced internally.
As we begin drafting, I find myself with several unanswered questions:
Thank you.
I recently joined an aerospace start-up company, and we're in the process of drafting our procedures. Currently, we're in the prototype phase and don't yet have real customers until we launch our first rocket. Therefore, we're performing 100% quality checks for the items/parts produced internally.
As we begin drafting, I find myself with several unanswered questions:
- What sampling plan is typically used as a reference in aerospace companies?
- Are we permitted to implement a sampling plan for small quantities produced? The production team is negotiating the possibility of implementing a sampling plan whenever we need to produce more than 10 parts. They prefer not to conduct a 100% inspection. However, in the standards, the terms "batch" and "lot" are frequently used, which isn't applicable to our current situation, as we're producing parts/items dedicated to one rocket (one project).
Thank you.