As I said earlier, router/travelers vary tremendously in format and details. I've seen documents like those which identified the actual production equipment and fixtures that needed to to be used for a given operation. In such cases, if a specific machine is down, and the operation can be performed in another production equipment, the authorization for temporary deviation (redlining) is perfectly acceptable, as long as it is done by authorized personnel with the knowledge to allow the change.
