Hello my cove friends.

Could I please tax your brains?

My company is AS9100 certified. We've just taken on a new customer who needs us to help them out with a potential 50 parts tool transfer, urgently.

The parts are a mix of non-aerospace, aerospace and ITAR.

They don't want to pay for FAIR's so I've suggested they choose key dimensions and we measure 20 parts from a batch, which they like the sound of. They are now dragging their heels a little.

The questions are:

1) As they are moving tools to us, don't we HAVE to do a FAIR to validate the process change?
2) Will they have to do a FAIR on the incoming parts from us?
3) Are they able to give us any ITAR parts to run for them, or is this not allowed?

I want to help this customer but I need to make sure we are doing things by the book.

Thank you in advance for your help!
 
Elsmar Forum Sponsor

John Predmore

Trusted Information Resource
#2
Why is the new customer dragging his heels? They don't want to pay for FAIR's?
You said you want to make sure you are doing things by the book. You mentioned your company is AS9100 certified. Let's start there.

section 8.5.1.3 Production Process Verification
... The organization shall use a representative item from the first production run of a new part or assembly to verify that the production processes, production documentation, and tooling are able to produce parts and assemblies that meet requirements. ... NOTE: This activity can be referred to as First Article Inspection (FAI).

"Shall" means your company has to do production process verification to be in compliance. AS9100 doesn't require you generate a report, although it is customary to provide results to the customer. AS9100 doesn't say every dimension, every part number must be inspected, only you show you are able to produce conforming parts. If the 50 different parts have similar features produced by similar processes, you might reasonably save time and money by doing a partial FAI on a set of p/ns.

You don't provide enough information for me to comment on your ITAR question.
 

fraktion

Involved In Discussions
#3
Hi John.

I appreciate you reaching out. Since posting I have done more digging...

To address your questions, yes the customer doesn't want to pay us £2000 pounds for a FAIR for a single part number that will take us 2 weeks to complete due to the complexity of the part(s).

As it stands all the parts / drawings are customer owned, not passed down the line from their end customer. I'm told that as a result of this, it is acceptable for us to complete a report based on a quantity of parts over select key dimensions. The onus would be on our customer to create a FAIR their end (be it a full or delta) in order to supply on to their end customer.

Regarding ITAR: Customer owned tooling / drawings but end user requests ITAR control. I'm told that in order for my company to run these parts, we will need a 3 way NDA with our customer and their customer.

Does this all sound correct to you?
 

Big Jim

Super Moderator
#4
AS9100 doesn't require you generate a report said:
Perhaps you don't need to generate a report but you still need to keep a record to handle this pesky line:

"The organization shall retain documented information on the results of production process verification."
 
Thread starter Similar threads Forum Replies Date
M Software verification and validation AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
J AS9100 - Validation of Test Reports for Al 304 Raw Material AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E AS9100 Section 7.4.3 Test Validation for Material AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
A Understanding AS9100 Clause 7.5.2 Validation of Processes for Production and Service AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
S Validation Of Outsourced Special Processes under AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
Z AS9100 Control of Nonconforming Outputs - Rework Dispositions AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
briteme4 ASL - AS9100 / Supplier Survey Supplier Quality Assurance and other Supplier Issues 3
Crusader AS9100 7.5.2 NOTE Approval methods identified AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
A Can a organization use a disclaimer "pending AS9100 Certification" in Marketing Information? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R AS9100D internal audit checklist or ISO 9001 2015 to AS9100 D AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
T AS9100 audit due to facility move AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K AS9100 and ISO9001 together AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Do AS9100 Registrar Auditors have nonconformity quotas? General Auditing Discussions 18
L Heading dies as "tooling" and AS9100 Manufacturing and Related Processes 2
L Heading dies as "tooling" and AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L AS9100 - Product and Service Provision 8.5.1q AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
T Temperature Requirements For In House Calibration - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 16
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
G Tool tracebility and First calibration requirements for aerospace (AS9100) organisation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T Internal Nonconformance procedure thoughts (AS9100) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
A AS9100 Training - Where do I start? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
SocalSurfer Can you recommend an enterprise QMS for new AS9100 startup AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L Open Positions During AS9100 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
SocalSurfer AS9100 new certificate, but need QMS software, help Quality Assurance and Compliance Software Tools and Solutions 2
C AS9120 or AS9100 Cert pertaining to inventory? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
H AS9100 Checklist for Internal Audit needed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
hockeyhead Existing process never included in AS9100 scope of certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
W Major NCRs within AS9100 - What is the most frequent reason for Major NCRs? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q AS9100:2016 D - Intent of 8.4.3 (K) - Implement QMS AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
was named killer AS9100 Supplier Approval Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9100 8.4.1 Supplier Selection/Evaluation criteria and reevaluations AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
S Effective nonconforming process for AS9100 8.7 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
O Adding ISO 13485 to an AS9100 QMS ISO 13485:2016 - Medical Device Quality Management Systems 13
M Customers Request AS9100 certification - Small Company (less than 20 employees) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
NDesouza AS9100 - D Capacity Planning Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D ISO 9001 & AS9100 Certificate issued by a consultant for a Distributor Registrars and Notified Bodies 11
B FAR/Prime Contractor Flow-down Tool - AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9100 - 7.3 - Are these black and white questions with specific correct answers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Does AS9100 require traceability to operators performing the work? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
R Traceability on Unmarked Parts - AS9100 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M When is FAI required? AS9100 8.5.1.3 and 8.4.3 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
M Ethics and Legality AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
K Counterfeit parts prevention - Audit Nonconformance - AS9100 8.2.2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 25
classical_quality AS9100 Surveillance Audit - advice on drafting strong responses AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
L AS9100 - Infrastructure or Product? Inflight internet connectivity network AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9100 Rev D 8.1.1 & APQP - Operational risk management process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
T AS9100 - Changing PEARs target AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 41
R AS9100 DELTA FAI - Sub-supplier for plating changed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
G AS9100-8.1.2 Configuration Management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6

Similar threads

Top Bottom