AS9100C Risk Management Procedure Example

B

bsathyanarayanarao

Re: AS9100C Risk Management Procedure Example wanted

I was so excited to see someone had the same question I did about a Risk Management procedure - but deflated when I did not have access to the reply. I just had my Stage 1 audit for AS9100 Rev C and that was one of the areas I fell short (and Configuration Management but there is a lot of info I have obtained in my search). Can someone help me with a generic procedure or flowchart for Risk Management?:confused:
Dear Sir,

Please sent whatever you have the documentation, data, procedure related to 9100 Rev. "c". for this I will be thankful to you for ever.

Thanking you in anticipation.
B.S. Rao
 
Elsmar Forum Sponsor
M

m.andito

Hello, I am Andito from Indonesia (Engine Maintenance, Aviation). I'd like to ask about Risk Management.

After getting preliminary assessment for AS9110, the auditor still come with this finding: [FONT=&quot]The Key document (KMR KB01-009 Risk Management Review) is still in Indonesian and needs to be redrafted to highlight in English how the process is managed. This document is managed by the company for overall to the company. However, a concern is the Roles & Responsibilities for Risk Management for Engine Maintenance has yet to be defined.
[/FONT]
[FONT=&quot]

[/FONT]About the language, agreed. Probably we shall translate it to the English. Regarding to the concern, what about if our company structure is like this?

__________ (Father Company) __________
| | |
Line Maintenance Base Maintenance Engine Maintenance



We already have Risk Management system in placed in the father company. We already explain to the auditor that the Risk Management is controlled by Father Company. And all the managers in Engine Maintenance already create and control the Risk Assessment in their area.
example:
01 Risk Assessment Assy-Disassy
02 Risk Assessment Material Planning
03 Risk Assessment Welding
04 Risk Assessment Thermal Spray
05 Risk Assessment Form Test Cell
06 Risk Assessment Marketing Sales
07 Risk Assessment Warehouse
08 Risk Assessment Planning Engineering
09 Risk Assessment NDT
10 Risk Assessment Bench Inspection
11 Risk Assessment Engine APU Field Engineer
12 Risk Assessment Purchasing
13 Risk Assessment Part Repair Production Control
14 Risk Assessment Tool Crib
15 Risk Assessment Engine - APU PPC
16 Risk Assessment Forecasting and Scheduling

Herewith I attach the sample of our Risk Assessment (Purchasing)

How to deal with this? Do you have suggestions? Thanks :)



[FONT=&quot] [/FONT]
 

Attachments

J

Jimtop

]Hello, I am also somewhat new to AS9100. Our customers have required us to upgrade from ISO 9001:2008. We are a small company 6 people. Any help with risk assessment procedure or flow chart would be appreciated. We do assembly no design.
 

Big Jim

Trusted Information Resource
]Hello, I am also somewhat new to AS9100. Our customers have required us to upgrade from ISO 9001:2008. We are a small company 6 people. Any help with risk assessment procedure or flow chart would be appreciated. We do assembly no design.
ISO 9001:2008 does not have a requirement for addressing risk. AS9011C does.
 
M

m.andito

]Hello, I am also somewhat new to AS9100. Our customers have required us to upgrade from ISO 9001:2008. We are a small company 6 people. Any help with risk assessment procedure or flow chart would be appreciated. We do assembly no design.

ISO 9001:2008 does not have a requirement for addressing risk. AS9011C does.
@BigJim: I think, Jimtop will upgrade from ISO 9001:2008 to AS9100. That's why his company need risk assessment

@Jimtop: Regarding AS9100 procedures, you can search it in google with keyword risk assessment procedures.

www(dot)dit(dot)ie/media/healthandsafety/documents/Risk%20Assessment%20Procedure.pdf
www(dot)hse(dot)gov(dot)uk/pubns/indg163.pdf
www(dot)docstoc(dot)com/docs/9078239/PROCEDURE-ON-COMPETION-OF-RISK-ASSESSMENT-FORMS

change (dot) with .

or any other web address that have risk assessment on it.

Based on our experience, the auditor will ask:
1. Show me your procedure
2. When you have a client, do you create risk assessment for each? (plus few question: when you have supplier, do you create risk assessment for them? Risk at assembly-disassembly process; man power capacity, overtime work, light, noise, etc)
3. How to mitigate the risk?
4. How do you know that your risk assessment is effective?

Oh yeah, and we still have a concern (not NCR) regarding: how you make sure that your risk assessment is effective. We shall fix that one :)

*sorry for my bad English -not native speaker-
I hope you understand
 
R

rreplayy

Re: AS9100C Risk Management Procedure Example wanted

Hello, Could you help me, as9100 Risk Assesment problem,
I am really in bad situation because of our audit?
Can anyone send me an extra as9100 document?
I appreciate for your help.
 

Doug

Life Balance
Re: AS9100C Risk Management Procedure Example wanted

If your QMS is mature, you should have a good idea of the risk associated with various process/activities within your organization. A good example is OTD, on-time delivery, which you should already be tracking.

I use a simplified PFMEA to assess each of my risk. What failure modes effect on-time delivery? They could be material arriving late from a customer, bad weather, an inaccurate sales quote, process capability failure, etc. Then I create an action plan for those risk that are within my power to mitigate. Thse items then need to be tracked for compliance to my action plan.

Best of luck,
Doug
 

Buckyb

Involved In Discussions
The concern for needing a procedure is not required by AS9100C. Currently only six procedures are required for compliance: control of documents; records; internal audit; control of nonconforming product; corrective and preventive action. The Standard states that risk is a "process" under 7.1 and that "the organization shall establish, implement and maintain a process". How the process is managed is up to the organization as long as 7.1.2 is satisfied as well as the requirements in 7.2.2e.
 
M

Mike_H

The concern for needing a procedure is not required by AS9100C. Currently only six procedures are required for compliance: control of documents; records; internal audit; control of nonconforming product; corrective and preventive action. The Standard states that risk is a "process" under 7.1 and that "the organization shall establish, implement and maintain a process". How the process is managed is up to the organization as long as 7.1.2 is satisfied as well as the requirements in 7.2.2e.
I agree 100%, but often *procedure* gets confused with *process* in questioning, lost in the translation possibly. When that happens, I'm guessing people want to read through the documented process (aka procedure) to help visualize it somewhat.

If you can demonstrate you are able to consistently meet all requirements with your undocumented process that runs like clockwork and everyone understands ---> no procedure.
If you want to establish more control because you think it's of benefit and there are indications people are departing from it, or some confusion over the tools to use etc...(if you're "herding cats") ---> document your process and whether you call it a procedure of simply your flowchart that's your call.
:2cents:
 
Last edited by a moderator:
Thread starter Similar threads Forum Replies Date
A AS9100C. 7.1.2 Risk Management - Interpretations AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
E Risk Management - Planning Stage (AS9100C Section 7.1.2(d)) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
K Risk Management (ISO 31000) and AS9100C - Gap Analysis Template Needed Risk Management Principles and Generic Guidelines 2
P How To Transition From AS9100c to AS9100 Rev. D AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
W Nonconforming product AS9100C, 8.3 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
A AS9100C to D - Has anyone done a gap analysis? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
S AS9100C 8.2.2 - Selected Tools & Effectiveness of IA Process and Performance AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
S AS9100C 7.5.1 Control of Production and Service Provision AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
W AS9100C Process based manual Design and Development of Products and Processes 4
W DCMA and AS9100C - Dedicating a week and 5 auditors to perform a AS9100C audit AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
W Unattached (stand-alone) Forms acceptable for AS9100C? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
A AS9100C to AS9100D Transition Testing AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
M Need help on QMS Development in an AS9100C certified organization AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 10
I AS9100C Lead Auditor Training Courses being Cancelled AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
Q What are the differences between ISO 13485 vs. AS9100C ISO 13485:2016 - Medical Device Quality Management Systems 3
W Certification on AS9100C - FAI or PPAP? Project Management or APQP? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 11
AmandaMusser AS9100C Out Of Tolerance (OOT) Equipment - Customer Approval AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 14
B AS9100C 7.5.1 d and calibrated equipment in the production areas AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
D AS9100C Clause 8.2.4 Monitoring and Measurement of Product AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 9
T AS9100C Processes which need to be documented AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
W AS9100C/ISO9001:2008 Dual Certification (to both standards) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
W AS9100C registration - How long does the system have to run before initial audit? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 9
I Guidance for Transition from ISO9001:2008 to AS9100C AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
M AS9100C Quality Policy Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 14
M AS9100C Document Control for Machine Set Up Work Instructions AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
alonFAI Update an existing QMS manual or write a new one for AS9100C Certification? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
M AS9100C "Split" Audit Stages AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
H Is instrument ID required in the in-process inspection report per AS9100C AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 8
D AS9100C 4.2.3 - Obsolete Electronic ERP Documents AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
J Auditing AS9100C Section 7.5.1.2 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Adding AS9100C Lead Auditor Certification to an IRCA ISO 9001 LA Certification AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
D AS9100C - New requirements to existing standard? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
K AS9100C for Non-Aerospace Military Equipment? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
K How Can I Implement the Process Approach in AS9100C AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 9
Q Interpretation of Clause 7.1 Planning Of Product Realization in AS9100C standard AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
Q Basic questions about AS9100C Quality Standard Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
D Number of Audit Days for AS9100C Surveillance Audit (20 employees) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
L AS9100C 8.2.4 a-d Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 6
L Documented procedures requirements for AS9100C requirement 7.5.1 a) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 1
A AS9100C 7.4.3 Delegation of Verification (to a supplier for a specific circumstance) AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
S AS9100C Complete Internal Audit Software Package Recommendations Quality Assurance and Compliance Software Tools and Solutions 13
R Relating Cpk to Sampling Plans - AS9100C Para 8.2.4 & AS9103 Para 4.4 d. Capability, Accuracy and Stability - Processes, Machines, etc. 1
Buckyb AS9100C Clause 7.4.1 Appoved Supplier "Conditional" Status AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
B Example of Production Process Change having Significant Consequences AS9100C 7.5.1.2 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 0
G AS9100C Clause 4.1.1 Requirements Clarification AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
G AS9100C for Multiple Production Department AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
G AS9100C Internal Auditor Eligibility Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
G Detailed Project Plan for Implementing AS9100C AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
G AS9100C Gap Analysis Checklist for Implementation in our Company AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
C Become AS9100C certified...then move the facility. AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
Similar threads


















































Top Bottom