AS9102 - Assembly FAI for Use As Is or Repaired Parts

#1
Greetings. I am preparing an Assembly level FAI on a first run of Assembly production.

1. Some of the parts to be used for Assembly were a part of Notice of Escape from the Supplier, and processed as Nonconformances​
a. Some of the parts (not meeting Supplier defined process) were dispositioned/approved as Use As Is and Supplier C/A implemented​
b. Some of the parts (not meeting Supplier defined process) were dispositioned/approved as Return to Vendor for Repair and Supplier C/A implemented​
c. Some of the parts (not meeting Customer defined process) were dispositioned/approved as Use As Is and Supplier C/A implemented​
These approved parts are planned to be used on the first run of Assembly production and they were fully dispositioned/approved by all required parties. It was determined during disposition/approval that there is no impact to form/fit/function.

{AS9102B, Section 4.4, Nonconformance Handling, states that an FAI with design characteristic nonconformance(s) is "not complete". An FAI with noted nonconforming design characteristics may have Form 1, "Part Number Accountability", (see field 19) signed and shall be noted as "FAI Not Complete". }

Question1: If using Supplier parts that were non-conforming, but dispositioned as approved for Assembly and there is no impact to form/fit/function, is this still an FAI that will be "not complete"? I am reading this as, regardless of disposition/approval, the parts did not fully meet the design/process requirements during processing.​
Question2: For Assembly FAI, will this require a Partial FAI and then at a later time, another Partial FAI once the previous nonconforming parts come in 100% to the design/process requirements?​
Where I am getting confused, is these previous nonconforming Supplier parts will not have an impact on the Assembly level FAI. I can see if the parts were dimensionally different, fit different, different tools required, etc. but I do not understand how this ties in with the Assembly level FAI. Appreciate any input that will help me understand this fully.

Thank you
 
Last edited by a moderator:
Elsmar Forum Sponsor

dsanabria

Quite Involved in Discussions
#2
Before we continue - you need to understand the purpose of the FAIR.

The primary purpose of FAIR is to validate that product realization processes are capable of producing parts and assemblies that meet engineering and design requirements.

Step 1 - on form 1 place the items (block 15 - 18) that will complete the assembly.

Step 2 - If all dimensions and functions meet the engineering and design requirement - FAIR is complete.

You just validated the product realization process.
 

sandra2014

Involved In Discussions
#3
I have a question relating to AS9102 - We are creating a client requested first article AS9102, and all of the 'off the shelf' parts and components that are used in this 1st article build do not have material certificates for trace ability purposes Our client stated they don't need this certification for 'off the shelf' components. The client requested an AS9102 1st article report without the 'off the shelf item material certification', would this be a violation in meeting the AS9102 requirements? We would appreciate an immediate response from an Aerospace expert on this issue.
 

dsanabria

Quite Involved in Discussions
#4
I have a question relating to AS9102 - We are creating a client requested first article AS9102, and all of the 'off the shelf' parts and components that are used in this 1st article build do not have material certificates for trace ability purposes Our client stated they don't need this certification for 'off the shelf' components. The client requested an AS9102 1st article report without the 'off the shelf item material certification', would this be a violation in meeting the AS9102 requirements? We would appreciate an immediate response from an Aerospace expert on this issue.
Clause 1.3 of AS9102 - Application
Unless contractually required, this standard does not apply to:

· Procured standard catalogue items, COTS, or deliverable software.



So it's ok to contue with the FAIR per AS9102 without certs - just list the COTS on Page 1
 
#6
Before we continue - you need to understand the purpose of the FAIR.

The primary purpose of FAIR is to validate that product realization processes are capable of producing parts and assemblies that meet engineering and design requirements.

Step 1 - on form 1 place the items (block 15 - 18) that will complete the assembly.

Step 2 - If all dimensions and functions meet the engineering and design requirement - FAIR is complete.

You just validated the product realization process.
Thanks for your reply. This makes sense, however, the assembly is still utilizing parts that involve 'design characteristic nonconformance'. Will it be required to note this 'design characteristic nonconformance' on the assembly level FAI?

Thanks much, David P
 

dsanabria

Quite Involved in Discussions
#7
Thanks for your reply. This makes sense, however, the assembly is still utilizing parts that involve 'design characteristic nonconformance'. Will it be required to note this 'design characteristic nonconformance' on the assembly level FAI?

Thanks much, David P
Yes - and you will also not on form 1 that FAIR is not complete.

This will alert individuals that there is an issue and how it was resolved otherwise known as a Delta fair.
 
Thread starter Similar threads Forum Replies Date
D AS9102 FAI - Detail vs Assembly FAI (Form 1, Box 13) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
R AS9102 Info - Must each Assembly Component have FAI AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
N Does the AS9102 FAI requirement apply to wire assembly sub-kits? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
M What are the FAI requirements for an assembly? New to AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
A AS9102 FAI for Circuit Card Assembly - Measure each hole and document it? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
L AS9102 Form 1 Section 13 Detail or Assembly Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S AS9102 - Clarification - PO asking for an Assembly at Rev B (Print at Rev C) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9102 Form 3 for Assemblies - Verification that the Assembly is Correct AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A AS9102 for Electronic Circuit Card Assembly that contains COTS Components AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
S AS9102 for Assembly with Exploded View AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
D Partial FAI - AS9102 -One single drawing has 10 part numbers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M AS9102 FAI Report formats - Boxes in form 1, 2, 3 of AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
P AS9102 Form 3 Dimension Results Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
B Documenting hardware on Form 2 of AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Conformal Coating & AS9102 - Is conformal coating material a COTS part AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
B AS9102 COTS Form 1 vs. 2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
A AS9102 Delta FAI Require after Rework stock item from stock AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9102 - Completing Partial FAI's for Baseline Part Numbers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
E AS9102 FAI - What makes a COTS modified? (PCB assemblies) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
B AS9102 FAI & Lower Level Drawings - How should we perform the FAI? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
P AS9102 full FAl or a partial FAI after production inactivity period AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
B AS9102 Supplier Flow Down Method AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M FAI AS9102 - What does a First Article Inspection cover? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
W FAIR to AS9102 additional documentation Document Control Systems, Procedures, Forms and Templates 5
O AS9102 FAI report Forms 1-3 Document Control Systems, Procedures, Forms and Templates 6
R AS9102 - Are FAIs against a Customer Red-Lined Drawings Allowed? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
J FAI per AS9102 affecting Fit, Form, Function AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
J AS9102 - What needs to be Bubbled on a Contract or Purchase Order AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
C AS9102 Form 2 Information - Special Processes - Plating AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
R AS9102 FAI with No Drawings Supplied AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
M AS9102 Training - Seeking third party agency that provides online AS9102 training AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9102 FAIR Form 1 Content Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
APHX02 AS9102 FAI Requirements that pertain to a Dimension 'delta' AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S Qualification Builds & Process Changes (AS9102 - First Article Inspection) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R Accounting for Alternate Parts in AS9102 FAIs for Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S When to switch from a Partial AS9102 back to a Full AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
S AS9102 Aerospace First Article Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R When is a new AS9102 report required for Outsourced Processing? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B New AS9102 Rev B--CA vs UAI--purist vs. pragmatic AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M AS9102 Form #3 modification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
G Is it mandatory to record all processes in form 2 of AS9102 FAI report AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Q FAI IAW AS9102 - First Article Inspection Documentation Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 20
D AS9102 B (FAI - First Article Inspection) is Released - October 2014 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
A AS9102 First Article Inspection and NC Parts - New FAI? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
G AS9102 Design Supplier Part Number vs. Customer Part Number AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
WCHorn AS9102 Paragraph 5.3-5 - Lapse in Production - FAI Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
C Customer Documentation Errors when completing an AS9102 FAIR AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
W AS9102 Requirements - What information from the PO should be included in the FAIR? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
S AS9102 Interpretation on Form 2 field 6 - Specification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R Does anyone know when AS9102 Rev B will be released? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2