AS9102 Handwritten Revisions on Ballooned Drawing

Q

qcman012856

#1
Older component, first time we have purchased the part. Customer drawing flowed down to supplier has hand written revisions that do not reference an ECO . My initial reaction was to reject the FAI and tell the customer to officially revise the drawing. Customer is pushing back. Advice?
 
Elsmar Forum Sponsor
K

kgott

#2
Don't know what FAI is but if this is the first drawing of it you have received then mark it "original."

You might then consider going back to your customer seeking a clarification that that drawing is the one they want you to proceed with. Once your customer indicates that they want you to proceed with the drawing then document the communications and go ahead.

If you have previously been told by your customer not to accept or proceed with any drawing that is not traceable via an ECO then your push back is correct.

Bottom line? Don't proceed with a drawing that has not been approved by the customer.
 

dsanabria

Quite Involved in Discussions
#5
Older component, first time we have purchased the part. Customer drawing flowed down to supplier has hand written revisions that do not reference an ECO . My initial reaction was to reject the FAI and tell the customer to officially revise the drawing. Customer is pushing back. Advice?
What are the instructions on the purchase order?

That is the primary document that should have been reviewed during contract review - is this a prototype?
 

rickpaul01

Involved in HankyPanky
#6
Older component, first time we have purchased the part. Customer drawing flowed down to supplier has hand written revisions that do not reference an ECO . My initial reaction was to reject the FAI and tell the customer to officially revise the drawing. Customer is pushing back. Advice?
Your customer provided you with a drawing, and you want to tell him it is NFG? Do you have too many customers right now?
 

Jim Wynne

Staff member
Admin
#7
Your customer provided you with a drawing, and you want to tell him it is NFG? Do you have too many customers right now?
The OP needs to clarify his question. He's using "the supplier" in the third person, so it's not clear if he's referring to his own company as the supplier or some other entity.

If he's saying that his customer gave him a marked-up print without what he considers to be proper control or attribution for the markups, he is probably correct in being concerned about it. I have personally seen instances where product was made to marked-up drawings and the markups turned out to be wrong, and the customer claimed that the person who did the markup wasn't authorized. It can get ugly.

The customer is not always right. Sometimes they need to be led to water (with tact). If they refuse to drink, there needs to be some evidence that they're OK with the drawing in the state that it was provided.
 

rickpaul01

Involved in HankyPanky
#8
Oh, I agree. But he said the customer is pushing back. I interpret that to mean the customer has said “yes, use this drawing”, and he is still not satisfied.
 

Jim Wynne

Staff member
Admin
#9
Oh, I agree. But he said the customer is pushing back. I interpret that to mean the customer has said ?yes, use this drawing?, and he is still not satisfied.
I agree that at some point we do need to give the customer what they want, even if what they want is wrong. Demanding an ECO from a customer after they've told you to use what you've been given (assuming all else is as it should be and properly documented) is probably not a good idea. We might be victims of a customer's document control system, but we're not the owners of it.
 

Wes Bucey

Quite Involved in Discussions
#10
I think the answers given so far cover all that is necessary for OP to proceed.


  1. Written affirmation from the customer that the drawing provided is what it wants is sufficient documentation to proceed.
  2. First Article Inspection in AS is a specific process - ensure it is followed and documented.
  3. I would include copy of the marked up drawing AND the written affirmation with the FAI paperwork.
 
Thread starter Similar threads Forum Replies Date
R AS9102 FAI Change in Material / Process Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
P AS9102 Form 3 Inclusions AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
D Partial FAI - AS9102 - One single drawing has 10 part numbers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M AS9102 FAI Report formats - Boxes in form 1, 2, 3 of AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
P AS9102 Form 3 Dimension Results Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
B Documenting hardware on Form 2 of AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
D AS9102 - Assembly FAI for Use As Is or Repaired Parts AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
M Conformal Coating & AS9102 - Is conformal coating material a COTS part AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
B AS9102 COTS Form 1 vs. 2 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
A AS9102 Delta FAI Require after Rework stock item from stock AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B AS9102 - Completing Partial FAI's for Baseline Part Numbers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
E AS9102 FAI - What makes a COTS modified? (PCB assemblies) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
B AS9102 FAI & Lower Level Drawings - How should we perform the FAI? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
P AS9102 full FAl or a partial FAI after production inactivity period AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
B AS9102 Supplier Flow Down Method AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
L AS9102 Form 1 Section 13 Detail or Assembly Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M FAI AS9102 - What does a First Article Inspection cover? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
W FAIR to AS9102 additional documentation Document Control Systems, Procedures, Forms and Templates 5
O AS9102 FAI report Forms 1-3 Document Control Systems, Procedures, Forms and Templates 6
R AS9102 - Are FAIs against a Customer Red-Lined Drawings Allowed? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
J FAI per AS9102 affecting Fit, Form, Function AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
J AS9102 - What needs to be Bubbled on a Contract or Purchase Order AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
C AS9102 Form 2 Information - Special Processes - Plating AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
R AS9102 FAI with No Drawings Supplied AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
S AS9102 - Clarification - PO asking for an Assembly at Rev B (Print at Rev C) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
M AS9102 Training - Seeking third party agency that provides online AS9102 training AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
C AS9102 FAIR Form 1 Content Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
APHX02 AS9102 FAI Requirements that pertain to a Dimension 'delta' AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S Qualification Builds & Process Changes (AS9102 - First Article Inspection) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R Accounting for Alternate Parts in AS9102 FAIs for Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
S When to switch from a Partial AS9102 back to a Full AS9102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
S AS9102 Aerospace First Article Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R When is a new AS9102 report required for Outsourced Processing? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B New AS9102 Rev B--CA vs UAI--purist vs. pragmatic AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M AS9102 Form #3 modification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
G Is it mandatory to record all processes in form 2 of AS9102 FAI report AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Q FAI IAW AS9102 - First Article Inspection Documentation Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 20
D AS9102 B (FAI - First Article Inspection) is Released - October 2014 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
A AS9102 First Article Inspection and NC Parts - New FAI? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
G AS9102 Design Supplier Part Number vs. Customer Part Number AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
WCHorn AS9102 Paragraph 5.3-5 - Lapse in Production - FAI Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
C Customer Documentation Errors when completing an AS9102 FAIR AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
W AS9102 Requirements - What information from the PO should be included in the FAIR? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
S AS9102 Interpretation on Form 2 field 6 - Specification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R Does anyone know when AS9102 Rev B will be released? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S AS9102 FAI requirements - Inspecting with fixtures, templates AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
Q Two AS9102 Applicability and Interpretation Questions AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T AS9102 FAIR - Customer Drawing Revision Change AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
K AS9102 Field 19 Signature Requirement AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
T Is IAQG planning an update of AS9102? Revision B of AS9102? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4

Similar threads

Top Bottom