M
Mark Bidinger
A friend I know just went through a 1st time registration and were given a minor due to the fact that the PO submitted for outside calibration did not specifically call out the test method and criteria for each type of measurement device they had in house, the PO merely stated that it was the suppliers repsonibility to know the appropriate ASI/ASTM/NIST test required and the subsiquent critiera. The Lead Auditor felt this was not enought, that all the specifics should be on the PO
Does this make sence to anyone. I can see having a master list on hand of the information, which is provided to the supplier, and referenced on the PO, but tohave to call them all out on the PO?
Any one else run in to this or have suggestions as to how to resolve?
------------------
Does this make sence to anyone. I can see having a master list on hand of the information, which is provided to the supplier, and referenced on the PO, but tohave to call them all out on the PO?
Any one else run in to this or have suggestions as to how to resolve?
------------------