To start with, you should have a Level 2 procedure definingthe requirements of Qualification and validation. Equipments are
QUALIFIED while the process is
VALIDATED.
All Qualifications and Validation should be started with a Qualification / Validation protocol which defines how you will be going forward. Once the protocol is approved, carry out the requirements that have been mentioned in the protocol. If the requirements are successfully met, summarize in a Qualification / Validation Report.
For the contents of IQ, OQ and PQ, you could refer to the numerous threads that we have on the subject.
Best Luck