C=0 Sampling for Variable Characteristics

Douglas E. Purdy

Quite Involved in Discussions
#1
I have been doing a lot of reading [internet searches] recently and I am embarrassed to even present this thread, but I need feedback from my knowledgeable and experienced Cove Buddies! [Please be Gentle!] Is there any validity in utilizing a C=0 Acceptance Sampling Plan [meant for attribute characteristics] for variable characteristics by QC Inspection of a lot of machined product that has been monitored and measured by the machine operator at some designated periodic inspection [e.g., Every 5 or 10 pcs] that is not controlled in the traditional SPC [X-Bar & R-Chart] manner?
 
Elsmar Forum Sponsor

Michael_M

Trusted Information Resource
#2
I have always understood "C=0" to mean that during the AQL inspection, if any parts are found to have a bad (out of tolerance) attribute then you have to inspection 100% of all parts on that attribute and finish the actual AQL as well.
 

ScottK

Not out of the crisis
Staff member
Super Moderator
#3
Validity is in the eye of the customer. Who is the customer and what do they think?

I would say that since you are gathering in-process data, you should chart that rather than do an AQL inspection at the end. It's redundant if you can can show control. If the process is not in control then you may need both until you learn how to control the process.

As to using an attribute plan for variable characteristics - It my not be "correct" but in my experience in many different factories it is not at all unusual to treat a variable charactersitic as an attribute by saying if it's between x an y units it passes, if its out of x and y it fails.

Of course different industries may feel differently about this... I'm in medical device (class I very low risk) now and have also done this in drug and food packaging as well as general industry. When I was in a machining plant we did SPC charting and were able to eliminate "final" batch inspection of individual components altogether.
 

Douglas E. Purdy

Quite Involved in Discussions
#4
I have always understood "C=0" to mean that during the AQL inspection, if any parts are found to have a bad (out of tolerance) attribute then you have to inspection 100% of all parts on that attribute and finish the actual AQL as well.
Michael,

I do not quite understand what you mean by "and finish the actual AQL as well", unless it means to complete the inspection for the sampled product for all the identified characteristics to be inspected. Yes, when we find a "defective" for the given attribute(s) / characteristic(s) we then perform 100% inspection of the lot for the defective attribute(s) / characteristic(s).

Doug
 

Douglas E. Purdy

Quite Involved in Discussions
#5
Validity is in the eye of the customer. Who is the customer and what do they think?

I would say that since you are gathering in-process data, you should chart that rather than do an AQL inspection at the end. It's redundant if you can can show control. If the process is not in control then you may need both until you learn how to control the process.

As to using an attribute plan for variable characteristics - It my not be "correct" but in my experience in many different factories it is not at all unusual to treat a variable charactersitic as an attribute by saying if it's between x an y units it passes, if its out of x and y it fails.

Of course different industries may feel differently about this... I'm in medical device (class I very low risk) now and have also done this in drug and food packaging as well as general industry. When I was in a machining plant we did SPC charting and were able to eliminate "final" batch inspection of individual components altogether.
Scott,

You hit the proverbial 'nail on the head' in so many ways with your response.

Thanks!

Doug
 

Michael_M

Trusted Information Resource
#6
Michael,

I do not quite understand what you mean by "and finish the actual AQL as well", unless it means to complete the inspection for the sampled product for all the identified characteristics to be inspected. Yes, when we find a "defective" for the given attribute(s) / characteristic(s) we then perform 100% inspection of the lot for the defective attribute(s) / characteristic(s).

Doug
Yes, I personally thought it was obvious but one of our old customers kept making a HUGE point that when you do AQL and find a bad dimension you have to finish doing the AQL as well (spent about 20 minutes on the phone and 3 separate e-mails telling me this).

The customer did not want sampling inspection, they wanted 100% inspection but were not willing to pay for it (thus they are not our customer any longer). Any time the word AQL or sample inspection came up they went off on a tirade.

The entire event sticks with me to this day so I think I was channeling those events badly.
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#7
Like Scott I have been several industries from aerospace to medical devices. measuring a 'variables' characteristic usind an Attributes approach to sample size and converting the results to pass fail (rather than using distributional statistics to predict the number that may be out of tolerance) is very very common. in fact I'd say its typical. Your Custeomr may not accept it? but I can't udnerstand why - unless I've misinterpreted your situattion.

I would add one clarification to Scott's comments about demonstrating control: the requirement is to demonstrate control AND capabliity. remember processes can be horribly out of spec and yet still in statistical control...
 
Last edited:

Mike S.

Happy to be Alive
Trusted Information Resource
#8
I would say that since you are gathering in-process data, you should chart that rather than do an AQL inspection at the end. It's redundant if you can can show control. If the process is not in control then you may need both until you learn how to control the process.
I respectfully disagree. What if the process is in control but does not meet the customer's spec?

Ideally you are in control and meet spec. Some customers will demand you show via AQL-type sampling that you meet spec. That is no reason not to do control charting of course!

Many customers and industries may demand C=0 AQL type inspection.
 

David-D

Involved In Discussions
#9
I'll try to provide an answer in a different direction than the process control vs acceptance sampling debate (i believe in both... sometimes) and instead comment on attribute and/or variable sampling plans.

For any attribute sampling plan, you can create an equivalent variable sampling plan by comparing the equivalence of the Operating Characteristic (OC) Curves of the sampling plans. In doing so, you can create matched (or families of matched sampling plans). Many industrial sampling standards are already constructed this way; for example, ANSI/ASQ Z1.4 (for attributes) and Z1.9 (for variables) are matched (they were copied from the previous MIL-STD-105 and MIL-STD-414). Some of the plans within do happen to be c=0 plans. For pure c=0 plans, MIL-STD-1916 contains both accept on zero (AOZ) attribute plans and corresponding matched variable plans (as well as continuous plans); MIL-HDBK-1916 provides the underlying OC curves for reference. There is also an ISO spec that is basically equivalent to 1916.

The short answer is that for whatever your sampling plan (especially if it is an actual AQL) it should be pretty easy to look up or derive (via OC curves) an equivalent variable sampling plan.

As a further aside, most of the c=0 variable plans I know of require both meeting the variable analysis (Cpk by any other name) and not finding any nonconforming units.

David
 

toffeeman

Starting to get Involved
#10
Bump

We have been using the C=0 Sampling plan for all Lot By Lot incoming inspections, where variable dimensional data is recorded. Where a dimension is found to be out of specification on one sample, the batch is either rejected or 100% inspected.

Can anyone provide an acceptable rationale for using C=0 for variable date instead of a sampling plan such as ANSI Z1.9?

Thanks
 
Thread starter Similar threads Forum Replies Date
R What to Report when Using C=0 Sampling Plan Supplier Quality Assurance and other Supplier Issues 15
G Sampling Plan according to SAE ARP9013 C=0 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
M AS9100A (old revision) - Required C=0 sampling plans if sampling was used? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
WCHorn AS9100 and Sampling - ANSI ASQ Z1.4 C=0 Conflict AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
A C=0 and Skip Lot Sampling Plan Relationship Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
V C=0 Zero Acceptance Number Sampling Plan - Question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
A ANSI/ASQ Z1.4 tables for C=0 - Setting up a robust Sampling Inspection Scheme Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
M c=0 Acceptance Sampling Plan similar to the N. Squeglia version Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
C C=0 vs. AQL MIL Standard 105 E - Sampling Plans Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
P Why sample size for c=0 sampling plan reduces across the increases of AQL AQL - Acceptable Quality Level 2
Q C=0 Sampling Plan Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
V C=0 vs. ANSI/ASQC Z1.4 - Part Inspection Sampling Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A What is a good lot size? We use the C=0 Sampling plans at AQL %1.0 AQL - Acceptable Quality Level 9
R My C=0 sampling failed to detect parts are out of round Inspection, Prints (Drawings), Testing, Sampling and Related Topics 20
QChas The Source of "C=0 Sampling Plans Index Values (Associated AQLS)" AQL - Acceptable Quality Level 3
Marc Zero Acceptance Number Sampling Plan - C=0 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
G Has anyone heard of the Squeglia Zero (c=0) Acceptance Sampling Plan? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
L Established a c=0 "AQL" or "RQL" table AQL - Acceptable Quality Level 5
M Determining c=0 AQL numbers Misc. Quality Assurance and Business Systems Related Topics 3
Q Definition C - What the "C" in C=0 Sample Plan means Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 10
S Justifying the AQL for a Zero (C=0) Acceptance Plan (Medical Device) AQL - Acceptable Quality Level 6
L Please Explain Inspection Levels including C=0 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 6
T How to define c=0 Reject Rates Inspection, Prints (Drawings), Testing, Sampling and Related Topics 14
L What does "C" in C=0 mean? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
C Ansi/ASQ Z1.4 C=0 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
C C=O puzzle - What protection does C=0 provide a supplier? Statistical Analysis Tools, Techniques and SPC 15
C MIL-STD-105E vs MIL-STD-1916 - Is 1916 the same as C=0? Preventive Action and Continuous Improvement 4
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
S Is using ANSI/ASQ Z1.4-2008 the correct sampling plan to determine Pass/Fail of Apparel measurements? AQL - Acceptable Quality Level 4
N Sampling Plan for Internal Audits - ISO 2859 or 3951 - Or Neither? Internal Auditing 6
F Product audit sampling plans IATF 16949 - Automotive Quality Systems Standard 3
R Reduced sampling plan for sterial products APQP and PPAP 0
A ISO 2859-1 - 9.3.3.2 Switching score - Sampling Plans and PPM AQL - Acceptable Quality Level 0
R BS EN 12060:1998 - Zinc and zinc alloys Method of sampling Specifications Manufacturing and Related Processes 4
S High voltage testing - ISO 17025 - 7.2.2 Validation of methods and 7.3 Sampling ISO 17025 related Discussions 3
8 Activity Sampling Exercise Lean in Manufacturing and Service Industries 11
T Defining sampling plan for different AQL AQL - Acceptable Quality Level 1
B AS9100D Sampling Plan AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
R Design verification for interim design outputs - sampling rationale ISO 13485:2016 - Medical Device Quality Management Systems 2
Nicole Desouza Sampling plan for a customer who wants AQL 1.0 (per ANSI Z1.4) AQL - Acceptable Quality Level 5
V How to interpret AQL sampling tables AQL - Acceptable Quality Level 5
A AQL sampling bags of parts Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
C Applying Weibayes to Attribute sampling Reliability Analysis - Predictions, Testing and Standards 0
I Sampling processes - Who must define the AQL level? AQL - Acceptable Quality Level 9
E Sampling for capability studies for variables and attributes Capability, Accuracy and Stability - Processes, Machines, etc. 4
O Statistical justification of sampling size in V&V tests ISO 13485:2016 - Medical Device Quality Management Systems 5
M Sampling Plan for Alumin High Pressure Die Castings Manufacturing and Related Processes 0
E Sampling plan for orthopedic implant - Process Validation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
S Inspection/sampling economics Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
S How to make a Sampling Plan - Conveyor belts Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4