Hello all,
Is it normal, or acceptable to modify the acc/rej # when choosing a sampling plan? For instance, I have a process that currently is a Level II, @ .65. However the ac/re value is 2/3.
Can I just use the ANSI Z1.4 for picking sample size only and modify the ac/re criteria to 0/1 and still be considered as following ANSI Z1.4?
Much appreciated,
John
Is it normal, or acceptable to modify the acc/rej # when choosing a sampling plan? For instance, I have a process that currently is a Level II, @ .65. However the ac/re value is 2/3.
Can I just use the ANSI Z1.4 for picking sample size only and modify the ac/re criteria to 0/1 and still be considered as following ANSI Z1.4?
Much appreciated,
John