Can formal document control requiring QM signoff live with continuous improvement?

Quality Manager sign off and continuous improvement can't work well together

  • Agree

    Votes: 3 33.3%
  • Don't Agree

    Votes: 5 55.6%
  • Undecided

    Votes: 1 11.1%

  • Total voters
    9
B

BrianHu

#1
I've just taken over a role that includes ISO9000 managment.

I want to have simple and effective processes which enable continuous improvement by the people in the process. I want to develop systems thinking within the company so that people critically think of how well processes work and and link together.

Our existing document control procedure requires the quality manager (me) to sign off and approve all procedures. Where these are in a specialised technical area then my review adds little. Publishing documents on our electronic document control system applies the document identifier and registers the submitter as document owner - so we have a document control process.

So that people can continually review and improve their processes, I don't see that I add any value in signing off their procedures - what I think is best is that new or changed procedures receive peer review.

So, cam formal document control requiring QM signoff live well with continuous improvement?

What are your comments and suggestions?

Brian H
 
Elsmar Forum Sponsor

Mike S.

Happy to be Alive
Trusted Information Resource
#2
Brian,

I think you can do it either way, whichever way works best in your situation is the way to go, IMHO. In the small companies I've worked in ( < / = 250 employees) I have required that I review all doc's (levels 1, 2, & 3) as part of the approval process. In some cases I cannot add anything on a technical level, but I make sure the "little things" are done -- a proper approval by the responsible person, hardcopy control (if required), electronic copy control, proper document numbering, an acceptable format with the required sections, etc. But I am sure you can also find a way to control these things even without the QM review if you work together with the affected folks and there is some discipline exercised. And there are probably folks who will post after me to explain how they do it!
~~~~~~~~~~~~
Edited by Marc: It would not take all the post because you had a 'formula' in there and without spaces it would not render as it passed through the php parser.
 
K
#3
No Value

The QM here wants QA to sign off on all procedures. I wrote the Document Control Procedure to limit that requirement to level 2 procedures; level 3's and work instructions are departmental. He finally looked at a work instruction from manufacturing and discovered nobody from QA signed off on it. We are now discussing this very issue.:confused:
 

E Wall

Just Me!
Super Moderator
#4
FROM MIKE S Unable to post fully

Helping Mike out since he's having problems posting. The problem seems to be the combination of the > , \ , and = symbols in front of the 250 employees. As you can see I changed to a tilda and it works. Here is the message he is trying to get out:

Brian,

I think you can do it either way, whichever way works best in your situation is the way to go, IMHO. In the small companies I've worked in (~250 employees) I have required that I review all doc's (levels 1, 2, & 3) as part of the approval process. In some cases I cannot add anything on a technical level, but I make sure the "little things" are done -- a proper approval by the responsible person, hardcopy control (if required), electronic copy control, proper document numbering, an acceptable format with the required sections, etc. But I am sure you can also find a way to control these things even without the QM review if you work together with the affected folks and there is some discipline exercised. And there are probably folks who will post after me to explain how they do it!

Mike S.
 
#6
QM sign-offs

In several companies I've worked with, the QM signs off on the procedures from a doc control and format standpoint to ensure the procedures do not violate the rules for doc control. The content of the procedures is signed off by the department or activity manager.

Where these are in a specialised technical area then my review adds little.
This is often true. The QM is probably not the expert on the best way to perform the process. Leave that (and the corresponding procedure development) to the process owners. On the flipside, the process owners are probably not the best ones to determine if the document naming, numbering and format meets established conventions. This is where the QM review can be valuable. It is also the ideal time to add the document changes to the master list (if applicable).
 
#7
No argument

If so, why would a quality professional need to do the latter? Seems to me like a pure admin task.
Not going to argue that Jim. Larger organizations I've worked with have had a "Document Controller" who performed the function. In other organizations they left it up to the QA or QM because "they have the expertise". Most "quality professionals" I know do have a bit of administrative duties on their plate. After all, we know that without such duties, the quality professional would have nothing to do but drink coffee all day! :rolleyes:
 

Mike S.

Happy to be Alive
Trusted Information Resource
#8
Jim Wade said:

* someone else can check naming conventions, page numbering, layout, typos, spellos and so on on?

If so, why would a quality professional need to do the latter? Seems to me like a pure admin task.

rgds Jim

I agree with you and db, Jim, a Q Pro need not be the one to do it, but in small to mid-sized companies this is often a hat the QM or his/her assistants wears in my experience. In one former company we had a Doc Control person who did nothing else, just doc control. Now, in IMHO, for a 250-300 person company this is not a full-time job unless you overcomplicate and "bureaucratize" things WAY too much to ensure your job security, which this person did. Getting a L3 procedure done, or getting a customer drawing accepted and filed, or getting a copy of a customer drawing, required about the same amount of paperwork and headaches as a home mortgage loan. It was crazy, and this person was sooooo protective of her ideas and her turf that she was eventually canned for her poor attitude and lack of cooperation. Seems to me, especially in today's "lean" (slimmed down staff) companies of smaller size, this is usually the QM's balliwick. JMO of course.
 
E

energy

#9
value added review?

Not discounting the importance of a value added review:rolleyes: , which is another hazy description for a normal review, here's what and why we do what we do. All cognizant parties review a draft submitted by someone, agree on the content (no more value added review than that is normally required) and the procedure is put into an "official" looking format for final review and subsequent release. The fact that WE decided that a procedure is needed, to possibly fill in some technical gap that cannot be accomplished soley through on the job training, is what we consider "value added".:rolleyes:

Recognizing the Doc Control issue and formatting, which is the QA Mgr's job here because nobody does it better, :vfunny: the QA Mgr creates the document based on departmental input. The Review and Authorization block will contain the QA Mgr as the authorizer for the "Q" procedures, who is also the MR. In the case of selected Departmental level 3's, the QA Mgr is shown as the "Originator" and the respective Department Manager is the "Authorizer". It's a simple system.

And let's not forget the most important thing. It's always nice to see the QA Mgr's title on all documents, especially when he/she is the MR. :biglaugh: :biglaugh: Hey, that's why I have a job. Butt out, Jimbob!:agree:
 
T

tarheel

#10
QM Signoff

Whether you can judge the technical merits, you should be able to look for adherence to the proper format, etc. More importantly, you should also review for references making sense, making sure the procedure is not duplicating anything already in the system. After all, shouldn't the MR be the expert on the QMS?
This doesn't relieve anyone else from responsibility, just a reality check.
 
Thread starter Similar threads Forum Replies Date
D Change Approval Requirements - Does every change need formal customer approval? Design and Development of Products and Processes 17
T Formal Q Self Assessment - Problem with assigning Product and Process Customer and Company Specific Requirements 1
M MDR - Is a formal GSPR Procedure required? EU Medical Device Regulations 20
V Manufacturing without a Formal Drawing ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
R MDR Software Rule 11 Formal Interpretation EU Medical Device Regulations 7
I Bench Testing & Pre-verification vs. Formal verification 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
S Formal written response to a corrective action? Nonconformance and Corrective Action 9
J When to Take Formal Action on a Supplier Supplier Quality Assurance and other Supplier Issues 7
S Forecasting and Material Planning - Are formal procedures required? Document Control Systems, Procedures, Forms and Templates 3
Q Is there a formal process for disputing a 483 for a medical device company? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
S Is a formal review after OQ (in Process Validation) required? Qualification and Validation (including 21 CFR Part 11) 2
A Auditor threatening Formal NC and CA for not enough PA Preventive Action and Continuous Improvement 23
M Continuous Improvement Log vs. Formal CAPA System Preventive Action and Continuous Improvement 3
N The formal definition of Domestic Environments in in CISPR 11 IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
W Is formal training required for Internal Auditors? Internal Auditing 7
R Auditing a process outside the realm of the formal Internal Audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A 483 Response Letter - Are there any Special Formal or Content related Requirements? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 16
P Acquire formal USFDA Inspector for USFDA Inspection Preparation 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
M ISO TS 24971 Updates and formal objection of the European Commission to ISO 14971 ISO 14971 - Medical Device Risk Management 24
A Formal Way for Documenting Design Input Requirements 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
L Formal Resource Request Form example wanted Document Control Systems, Procedures, Forms and Templates 3
J Supplier Quality Management System (QMS) Audit - Formal Documented QMS does not exist ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
T TS16949 Certification withdrawn - What should be included in a formal appeal request? IATF 16949 - Automotive Quality Systems Standard 3
H Formal Quality Qualification - What qualification(s) would be the best? Professional Certifications and Degrees 10
A Difference between formal and informal Kaizen Lean in Manufacturing and Service Industries 6
L Is it required to write a formal corrective action on any nonconformance? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 29
A No Formal Documented Performance Evaluation for Contractual Personnel ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 28
J Does Management Review need to be a Formal Meeting? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33
C ISO 9001:2008 Contract Review for a business that doesn't have formal contract review Contract Review Process 11
M Formal SQAM requirements interpretation training Customer and Company Specific Requirements 5
Hershal Formal complaint to Europe regarding beer..... Coffee Break and Water Cooler Discussions 43
K No Formal Design Process - Audit Finding - Help with Section 7.3 of ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 24
P Formal Quality Control Agreement with specific suppliers - Required? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
M Sterile Field - Legal/formal definition US Food and Drug Administration (FDA) 4
J Formal CS1 Notification Letter Ideas and/or Template needed IATF 16949 - Automotive Quality Systems Standard 14
K Is formal Internal Auditor training required for ISO 17025:2004 - Clause 4.14.1 ISO 17025 related Discussions 5
V GAGE R&R Formal definition/ formulas for master's thesis Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
R Training Needed for Registration - Is Formal ISO Training Required? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 23
C Does a small typo in a procedure require a formal change notice? Document Control Systems, Procedures, Forms and Templates 22
E FDA - Audit - Response - Observation form 483. Do we now receive a formal letter? US Food and Drug Administration (FDA) 5
I Internal Auditor Training - Does TS 16949 Require Formal Training or Certification? Internal Auditing 19
H Placed in the position of implementing ISO 9001:2000 but have no formal training ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 26
Sidney Vianna Official ISO Interpretations - A Formal Process for ISO9001 Interpretation Requests ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 20
A Quality Audit Report - Report Format and some Formal Sentences General Auditing Discussions 22
CarolX Request for Formal CA - To Issue or Not to Issue Nonconformance and Corrective Action 15
Z The requirement of 'a formal training program for R&M' - 4.18 Training QS-9000 - American Automotive Manufacturers Standard 3
I When to start a formal corrective action as a follow-up action after audits General Auditing Discussions 11
U QS 9000 Audit - Trainer of internal auditors not having formal training QS-9000 - American Automotive Manufacturers Standard 6
Marc Quality Records and Forms - No formal forms Records and Data - Quality, Legal and Other Evidence 0
B When is a Formal Corrective Action Necessary? Nonconformance and Corrective Action 11

Similar threads