Can I Summarize Cp and Cpk of all Dimensions

O

oleg_v

#1
hi
i have a part with multiply dimensions to all dimensions a need to do cp and cpk
my question is can i summarize cp and cpk of all dimensions and one cp and cpk to the hole part?


thanks
 
Elsmar Forum Sponsor

Miner

Forum Moderator
Staff member
Admin
#3
Why do you want to do this? A single number would be misleading because it would imply a certain level of capability, and not show how bad a single dimension might be. If you want to summarize the indices show the max and min values.
 

Stijloor

Staff member
Super Moderator
#4
Why do you want to do this? A single number would be misleading because it would imply a certain level of capability, and not show how bad a single dimension might be. If you want to summarize the indices show the max and min values.
I propose to exterminate any Cp, Cpk or whatever letter combination is used to indicate "capability." The capability "Magic Wand" does not exist and I do not believe in fairy tales. Too many get too much wrapped up in trying to obtain some magic number to indicate how "good" a process is :mad: while most process are not even in (statistical) control. How about just focusing on improvement?

Stijloor.
 

Miner

Forum Moderator
Staff member
Admin
#5
I propose to exterminate any Cp, Cpk or whatever letter combination is used to indicate "capability." The capability "Magic Wand" does not exist and I do not believe in fairy tales. Too many get too much wrapped up in trying to obtain some magic number to indicate how "good" a process is :mad: while most process are not even in (statistical) control. How about just focusing on improvement?

Stijloor.
Easy Jan,

Put the the gun down, keep your hands where I can see them and back away slowly. :modcop:
 
S

statdoug

#6
One could argue that ISO standards did not strictly mandate the calculation and tracking of capability indices, and yet the fact that so many companies have responded by doing this indicates that it is a product of the systems of ISO certification. It also coincides with the interests of quality personnel who are looking for job security, to develop and implement such a system.
 
T

tbsiva

#8
That does not add any value...What do you infer from the result... If u summarise the cpk values and find that the Cpk values are low, again you have to go back to the individual dimensions to analyse for the improvement actions
 
O

oleg_v

#9
Hi
thanks for your response i think i go for the individual cp/cpk measurement
to be shore that all my dimension in the part is ion control.

thanks
Oleg :agree1:
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#10
One could argue that ISO standards did not strictly mandate the calculation and tracking of capability indices, and yet the fact that so many companies have responded by doing this indicates that it is a product of the systems of ISO certification. It also coincides with the interests of quality personnel who are looking for job security, to develop and implement such a system.
The Cp/Cpk craze comes more from the automotive industry than ISO.
 
Thread starter Similar threads Forum Replies Date
W LTPD, AQL, Ppk and Cpk validation sampling plan table Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
M Cp and Cpk for straightness and parallelism Capability, Accuracy and Stability - Processes, Machines, etc. 8
Q Capability - CPk comparison values Capability, Accuracy and Stability - Processes, Machines, etc. 12
D Tolerance definition based on expected Cp/cpk Reliability Analysis - Predictions, Testing and Standards 14
K Analysis variation among the lots during cpk calculation. Design and Development of Products and Processes 1
S Recommendation for user friendly Gaga R&R and Cpk software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
A How to set up Continuous CpK monitoring of an injection mold process Reliability Analysis - Predictions, Testing and Standards 7
A Interpretation with regards to Ppk > Cpk Capability, Accuracy and Stability - Processes, Machines, etc. 14
U Cpk Calculation - I analyse a double seam cans Manufacturing and Related Processes 15
Proud Liberal Cp / Cpk on position using multiple MMC bonuses Capability, Accuracy and Stability - Processes, Machines, etc. 2
I Can we use pin gauges to measure an accurate Cpk ? Capability, Accuracy and Stability - Processes, Machines, etc. 9
T Final process capability results - What I am supposed to present? Cp and CpK? APQP and PPAP 11
F CpK on a manufactured assembly? Reliability Analysis - Predictions, Testing and Standards 7
M How is the Cmk and Cpk calculated? Statistical Analysis Tools, Techniques and SPC 0
O Cpk for Unilateral Tolerance Capability, Accuracy and Stability - Processes, Machines, etc. 9
B How to calculate CPK with n = 1 Manufacturing and Related Processes 2
O CPK with a P value less than 0.005 Manufacturing and Related Processes 8
A Short Term vs. Long Term SPC Study - Where is Cp and Cpk Defined Statistical Analysis Tools, Techniques and SPC 8
A Cpk Formula seems off, need help!? Capability, Accuracy and Stability - Processes, Machines, etc. 11
D Cp/Cpk on Gages for MSA (vs. Cg/Cgk) Capability, Accuracy and Stability - Processes, Machines, etc. 21
E Questions regarding Cpk Calculation - Should we be using LSL/USL or LCL/UCL? Capability, Accuracy and Stability - Processes, Machines, etc. 5
B Maximum Material Condition with Bonus - Determine Cpk for this one kpc Measurement Uncertainty (MU) 2
Hami812 Cpk Setting Tolerance - Cart before the Horse? (Wifi Routers) Capability, Accuracy and Stability - Processes, Machines, etc. 3
T Calculating LCL, UCL, Cp, and Cpk in an Excel Spreadsheet Statistical Analysis Tools, Techniques and SPC 3
Proud Liberal Cpk on Position w/ MMC on Location and Size Capability, Accuracy and Stability - Processes, Machines, etc. 3
E SPC Production - Getting Cpk and Ppk Statistical Analysis Tools, Techniques and SPC 8
S Track Cpk trend Statistical Analysis Tools, Techniques and SPC 5
M Cp & Cpk about a diameter measured with min.,max. and average values. Capability, Accuracy and Stability - Processes, Machines, etc. 13
P Non-normal Data Cpk Statistical Analysis Tools, Techniques and SPC 5
alonFAI Cpk for Solder Paste Height Statistical Analysis Tools, Techniques and SPC 5
I As a part of validation, should i include the acceptance criteria of CPk index >1.33? Qualification and Validation (including 21 CFR Part 11) 4
T Cpk for 0 as Ideal Value Statistical Analysis Tools, Techniques and SPC 1
P Profile Tolerance and CPK Manufacturing and Related Processes 3
V When to use Cp Cpk and Pp Ppk Capability, Accuracy and Stability - Processes, Machines, etc. 4
M Calculating Cpk when sample size equals to 1 Capability, Accuracy and Stability - Processes, Machines, etc. 12
S CpK in Minitab when 0.0 is the lower spec limit Statistical Analysis Tools, Techniques and SPC 7
I Best way to Chart an On-Going CPK Requirement Capability, Accuracy and Stability - Processes, Machines, etc. 4
U Cpk for Contaminant Mass - Washing Parts Capability, Accuracy and Stability - Processes, Machines, etc. 6
G Help with Cpk procedure Capability, Accuracy and Stability - Processes, Machines, etc. 3
J Calculation of σ within subgroups for Cpk in Minitab Using Minitab Software 1
S Value of Ppk or Cpk when targeting thinner material Statistical Analysis Tools, Techniques and SPC 4
B How to validate Microsoft Excel Spreadsheet Calculations for the Cpk value Capability, Accuracy and Stability - Processes, Machines, etc. 9
D Calculating Cpk on Non-Normal Data Distribution Capability, Accuracy and Stability - Processes, Machines, etc. 10
D Cpk relation to Reliability Capability, Accuracy and Stability - Processes, Machines, etc. 4
B Process Capability - Changing Limits to Improve Cpk or find Root Causes? Capability, Accuracy and Stability - Processes, Machines, etc. 6
B Cpk vs Ppk to look at the Capability by Fixture Capability, Accuracy and Stability - Processes, Machines, etc. 4
R Convincing Management Cpk without Stability is Meaningless Capability, Accuracy and Stability - Processes, Machines, etc. 7
C Hardness Testing - Low Cpk's using Minitab Misc. Quality Assurance and Business Systems Related Topics 10
L Cpk after Data Transformation - How to Transform LCL /UCL to get Capability Report Capability, Accuracy and Stability - Processes, Machines, etc. 8
V Customer requires CpK 2 and PpK 1.5 Capability, Accuracy and Stability - Processes, Machines, etc. 2