C
What would you recommend for attribute data? In my case the Inspector not only sample for SPC but also for attributes. Does the 3 to 5 samples apply?
Does the lot or bath size being produced matters?
What would be a good justification for using 3 to 5 samples (in-process inspection) for variable and attribute data idependently of the frequency and lot size?
Thanks in advanced.
Does the lot or bath size being produced matters?
What would be a good justification for using 3 to 5 samples (in-process inspection) for variable and attribute data idependently of the frequency and lot size?
Thanks in advanced.