@deepikanegi, are you saying you have some nonconforming material, some people in your company want to rework or release to use-as-is, you want to use risk-based-thinking on that decision, and you want to use the FMEA format to document your risk-based thinking. That would be a non-traditional use of the FMEA tool, but it might be helpful as I described. FMEA-style thinking might facilitate a more comprehensive analysis, past the obvious, to include other stakeholder concerns and longer-term timeframes. In my scenario, the decision to use is made by decision makers with thorough consideration of risk. It would be a misuse of the FMEA tool if parts are deemed okay solely because the RPN score comes out lower than a arbitrary threshold.
 

Jim Wynne

Staff member
Admin
#4
@deepikanegi, are you saying you have some nonconforming material, some people in your company want to rework or release to use-as-is, you want to use risk-based-thinking on that decision, and you want to use the FMEA format to document your risk-based thinking. That would be a non-traditional use of the FMEA tool, but it might be helpful as I described. FMEA-style thinking might facilitate a more comprehensive analysis, past the obvious, to include other stakeholder concerns and longer-term timeframes. In my scenario, the decision to use is made by decision makers with thorough consideration of risk. It would be a misuse of the FMEA tool if parts are deemed okay solely because the RPN score comes out lower than a arbitrary threshold.
Let's remember that PFMEA is a process, not a form. The form is a record of the process. It makes no sense to me to use the form, and the RPN calculations for standard MRB activities. What you describe as "FMEA-style thinking" (considering the risks of a decision) is what's done whenever a decision has to be made.
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#5
a well executed PFMEA might help with disposition, IF the nonconforming things are raw materials or in process material AND the PFMEA is clear in how the nonconformance will effect either the processes ability to produce conforming material OR conforming product. A fundamental purpose of the FMEA process is to identify potential critical input characteristics and to determine the tolerances on those input characteristics that will guarantee the production product that meets Customer needs. For companies that treat FMEA like a ‘check the box’ activity this is rarely done. If the FMEA was correctly done, then almost certainly the disposition of nonconforming material would be scrap, return to vendor or rework. It could not be use as is, because a correctly executed FMEA woul result in real tolerances such that any material that was non conforming to those tolerances would result in bad product.
If you are going to use the ‘thought process’ of PFMEA adn the debunked RPN thing then you might as well use a crystal ball. RPNs adn occurence are just guesses that are driven by our biasesa and agendas.

I guess the real response here is WHY do you want to use the PFMEA for disposition of nonconforming material ? HOW do you intend to use it? WHAT kind of material do you propose using it for?
 
Thread starter Similar threads Forum Replies Date
R DFMEA/PFMEA mitigation of high severity (9-10) in low volume products IATF 16949 - Automotive Quality Systems Standard 1
T Annual Validation as a detection mode on a PFMEA? FMEA and Control Plans 5
P Understanding DFMEA and PFMEA - Supplier Related IATF 16949 - Automotive Quality Systems Standard 21
A ISO 14971 PFMEA Manufacturing Risk ISO 14971 - Medical Device Risk Management 2
J On PFMEA for danger labels - Label always should be assigned severity 10 ? FMEA and Control Plans 3
V Customer Print Specifications on PFMEA FMEA and Control Plans 13
blile Increasing PFMEA occurrence ranking after non-conformance FMEA and Control Plans 4
A PFMEA new AIAG FMEA and Control Plans 0
Q Is that any difficulty to do software DFMEA and PFMEA in ISO 13485? ISO 13485:2016 - Medical Device Quality Management Systems 5
bobdoering Informational New AIAG PFMEA Process - Excel Template Attached FMEA and Control Plans 23
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
A PFMEA English language question IATF 16949 - Automotive Quality Systems Standard 4
S Is there any connection between PFMEA and Acceptance Plan FMEA and Control Plans 1
K PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
N PFMEA repetitive failure modes in subsecuent stations. FMEA and Control Plans 1
T DFMEA/PFMEA and SCCAF alignment FMEA and Control Plans 19
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
A PFMEA - How long should the recommended actions remain in the recommended actions column? APQP and PPAP 3
S How to fulfill PFMEA "requirement" column? FMEA and Control Plans 2
T Informational Family or Baseline PFMEA Rules FMEA and Control Plans 22
A PFMEA severity score different applications FMEA and Control Plans 11
M Control Method correspondence between PFMEA and CP FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
W Is the RPN (risk priority number) in the PFMEA really a RPN without the detectability ISO 14971 - Medical Device Risk Management 4
I Making a process PFMEA, no DFMEA (non-automotive toll manufacturer) FMEA and Control Plans 1
Proud Liberal DFMEA / PFMEA linkage - Where in the standards do I find it? FMEA and Control Plans 5
N PQC (Product Quality Characteristics) and PFMEA FMEA and Control Plans 3
N PFMEA Potential Failure Mode for Weight FMEA and Control Plans 5
M I need a sample Reverse PFMEA Process Checklist FMEA and Control Plans 2
C PFMEA example with machining (lathe+mill) FMEA and Control Plans 1
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
B Proactive efforts to reduce risk - PFMEA risk reduction activities IATF 16949 - Automotive Quality Systems Standard 8
N PFMEA no effect ratings FMEA and Control Plans 15
N DFMEA, Drawings and PFMEA of an Assembly Process FMEA and Control Plans 12
A PFMEA for DC Motor FMEA and Control Plans 5
Crimpshrine13 PFMEA Scope - Oversized Special Characteristic FMEA and Control Plans 4
B PFMEA and Control Plan Links APQP and PPAP 2
B Update our PFMEA after Supplier updates their PFMEA? FMEA and Control Plans 4
Q PFMEA Scope and Detection Controls FMEA and Control Plans 1
A VDA 4 and PFMEA - What's main difference? VDA Standards - Germany's Automotive Standards 0
A Corrective Action Column in Control Plan and aligning PFD, PFMEA and Control Plan FMEA and Control Plans 6
O PFMEA - Reducing Severity (S) Ranking - Manufacturing Process Design Changes FMEA and Control Plans 4
R Is PFMEA (Process FMEA) for OEM sufficient to address Risk? ISO 13485:2016 - Medical Device Quality Management Systems 7
J Example PFMEA for Hydraulic Cylinders wanted FMEA and Control Plans 0
G SOP or Work Instruction for PFMEA? FMEA and Control Plans 5
M Changing FMEA template to include Detection Ranking for the PFMEA FMEA and Control Plans 2
S Required PFMEA Content - Final QC Inspection FMEA and Control Plans 7
Z Failure Mode Identification in PFMEA according to AIAG FMEA Rev.4 FMEA and Control Plans 6
N PFMEA for Non-Manufacturing Processes such as audits, direct procurement, etc. FMEA and Control Plans 5

Similar threads

Top Bottom