Good day all

I work for a manufacturing concern, and our products are inter alia flameproof alternators and lighting for the mining industry. We are currently upgrading into I/S intrinsically safe products. So we are being audited by Sira and IECex for exporting.

Products are designed,drawings done by my bosses, owners of business,design and drawings are send to ATL (test lab)and after approval we start production.

Question : Can I exclude Clause 7.3 Design and Development ?
I am not sure who does the development, prototype etc.
Hi Andre;

I just have a few quick questions. You state that the products are designed and drawings done by your bosses. Where do they get the information needed to do the design of the product? Are the drawings ever revised? Is there and existing work instruction or procedure in your company at this time that details how this process is achieved? Customer communication thru to production of the designed parts?

Regards
Jan
 
Elsmar Forum Sponsor
A

Andre Venter

#62
Hello Harry

Thanks for your answer, I have a page or so back quoted from the link you have provided.
 
A

Andre Venter

#63
Hello Howste
These are technical drawings, which were approved along with the specific product,by a lab and these were then certified by a registered CB.

Our product certification clauses state that neither the drawings or the product can be changed or modified without prior approval of the CB or the ATL.
 
A

Andre Venter

#64
Hi Andre;

I just have a few quick questions. You state that the products are designed and drawings done by your bosses. Where do they get the information needed to do the design of the product? Are the drawings ever revised? Is there and existing work instruction or procedure in your company at this time that details how this process is achieved? Customer communication thru to production of the designed parts?

Regards
Jan
Hello Jan

There are no procedures,WI or any other documents about design as we have always excluded it from our scope. There is no customer specifics about our catalogue products, they were as far as I can gather been designed by the company owners and directors, but in accordance with an ATL and a CB. We do however adhere and comply to all regulatory spec's.
 
Last edited by a moderator:
M

mmagargee

#65
Good day all

I work for a manufacturing concern, and our products are inter alia flameproof alternators and lighting for the mining industry. We are currently upgrading into I/S intrinsically safe products. So we are being audited by Sira and IECex for exporting.

Products are designed,drawings done by my bosses, owners of business,design and drawings are send to ATL (test lab)and after approval we start production.

Question : Can I exclude Clause 7.3 Design and Development ?
I am not sure who does the development, prototype etc.
I apologize in advance for responding to a stale thread, but the issue regarding the appropriateness of excluding design activities from an IECEx audit should reference the appropriate standard. That audit will be done under ISO/IEC 80079-34 (back at the time of this thread it would have been EN 13980) and both standards exclude that activity from the scope. See 80079-34, 7.3.1 - 7.3.6. Those six sub clauses state, "subclause 7.3.x of ISO 9001:2008 is not within the scope of this standard." However, clause 7.3.7 of 80079-34 states that sub clause 7.3.7 of ISO 9001:2008 does apply and adds the requirement for an EX person to approve design changes. Also, many IECEx manufacturers have parallel ISO 9001 certifications, and of course this thread went into great detail about being able to exclude design from those certifications.
 
Thread starter Similar threads Forum Replies Date
S Example of a DFSS (Design for Six Sigma) Project or a Case Study Six Sigma 4
P Missing 1m visual alarm signal in case of software/display failure, mitigation? ISO 14971 - Medical Device Risk Management 3
M ISO 9001:2015 case study sample ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Case study help as per ISO 9001: 2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
M Case study solution help required as per ISO 9001 : 2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
M Case study resources ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
D Safety Assurance Case Report Format ISO 14971 - Medical Device Risk Management 4
DuncanGibbons Looking for example aerospace part CAD files to be used for a case study Career and Occupation Discussions 2
M Informational USFDA – Digital Health Update: The FDA Announces an Opportunity for Test Case Volunteers for the Test Plan for the Software Precertification Program Medical Device and FDA Regulations and Standards News 0
M Informational EU – Medicinal products and medical devices: Coordinated approach in case of a withdrawal of the United Kingdom from the Union without a deal Medical Device and FDA Regulations and Standards News 0
A Audit purpose - case study - What is the role of SQE in such case? General Auditing Discussions 3
M Case study - If the restaurant (ISO 9001:2015 certified) was run by 2 persons covering cooking and purchasing processes (Mother and Father) supported ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
K Student wanting Case Study about Internal Audit Report Internal Auditing 1
I Cleanroom Actions in case of Actions Limit Alarm Qualification and Validation (including 21 CFR Part 11) 3
L Benefits that the QA's gain with a Test Case Template Misc. Quality Assurance and Business Systems Related Topics 1
M Does ISO 10993 Apply to Packaging? (e.g. Travel Case) Other Medical Device Related Standards 4
Z Is PPAP Re-qualification needed in case of not quoted dimension change? APQP and PPAP 4
J MDIC (Medical Device Innovation Consortium) and the "Case for Quality"? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
J If/how to apply LVD (Low Voltage Directive) in this case CE Marking (Conformité Européene) / CB Scheme 6
I Reaction plan in case of power outage Misc. Quality Assurance and Business Systems Related Topics 7
R Medical Device Safety Assurance Case Reports Other Medical Device and Orthopedic Related Topics 6
M Specific Capability case - Target Value is same as the Lower Limit Capability, Accuracy and Stability - Processes, Machines, etc. 9
L Business case for an electronic EMS (Electronic Manufacturing Services) ISO 14001:2015 Specific Discussions 2
C Case Hardening and Case Depth Measurement Manufacturing and Related Processes 4
Ajit Basrur India marks three years since last polio case Hospitals, Clinics & other Health Care Providers 2
L Need Help with Case Study Questions Manufacturing and Related Processes 16
J Electronic Components inside a Wooden Case Manufacturing and Related Processes 4
S Certificate Suspension Necessary in case of No Production? ISO 13485:2016 - Medical Device Quality Management Systems 4
A Type of Materials to comply with IEC 60601 (Dental Laser Case) IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
L Printing Machine Make Ready Rapid Changeover Case Study Lean in Manufacturing and Service Industries 2
E Short Case Studies - Major/Minor Nonconformance, Observation or OK? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
H Case Studies of Six Sigma in Service Processes Six Sigma 1
somashekar What documented procedure in this case ... ISO 13485:2016 - Medical Device Quality Management Systems 5
M Who is the Specification Developer in this case? ISO 13485:2016 - Medical Device Quality Management Systems 10
G Six Sigma Case Studies - Does anyone have a good source for LSS case studies? Six Sigma 8
B The Case for a 25-Hour Work Week Coffee Break and Water Cooler Discussions 4
S Production Equipment Forms - Case study with ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 31
R LKV Value: Can not verify Reliasoft Case Study Reliability Analysis - Predictions, Testing and Standards 2
M Business Case for ISMS (Information Security Management System) IEC 27001 - Information Security Management Systems (ISMS) 1
A AS9102 FAI Case Outline Difference AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
P 7.1, 7.3 and APQP Requirements Applicability in Transfer Case IATF 16949 - Automotive Quality Systems Standard 1
I Six Sigma Assignment Problem - Case Study: Productivity Improvement Six Sigma 2
W Applying ISO 9001 Clause 7.3 in Special Case - Oil Refinery ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
V Manual of Procedure for Case of Emergencies Business Continuity & Resiliency Planning (BCRP) 4
S Business Case for Process Mapping Process Maps, Process Mapping and Turtle Diagrams 4
B KPI = 0 - Accidents (Actual accident is 150 case/year) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 21
M Internal Warehouse Handling - A Reverse Logistic Case! Process Maps, Process Mapping and Turtle Diagrams 6
P Single Use Devices - Surgeon must have backup in stock, just in case? ISO 13485:2016 - Medical Device Quality Management Systems 17
Y Advice on this real case on AQL (Acceptable Quality Level)? AQL - Acceptable Quality Level 3
Sidney Vianna New Collection of International Case Studies proves Economic Benefits of Standards Other ISO and International Standards and European Regulations 1

Similar threads

Top Bottom