Case study help as per ISO 9001: 2015

MDGMG

Posts Moderated
#1
Please guide us for following case study:

You are auditing the design and development process in an organisation that designs and manufactures industrial equipment.
They are currently dealing with a serious customer complaint relating to faulty safety mechanisms. They have sent engineers to this customer to repair some equipment they designed, manufactured and supplied two years earlier for contract number A123.
You find a recent note on file that states that the engineers are currently having difficulty in repairing the equipment. They have been issued with the latest drawings for the equipment (serial number X134, revision 3). The drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment.
You confirm with the Design Manager that revision 3 is the current version of the drawings and that revision 3 does not include the change to the safety mechanism. You ask the Design Manager why the modification to safety mechanism was not made to the drawing and he replies that the change was reviewed and considered to be minor with no impact on the equipment and it didn’t affect the customer’s contract specification.

Question: A) If it's non-non-conformoity :
1) Description of non conformity
2) Relevant evidence
3) ISO 9001:2015 clause and requirement
B) If it's not a non-conformity,
1) Evidence for reporting non-conformity
2) Audit trails you would follow, including, evidence sought and purpose.
 
Elsmar Forum Sponsor

John Broomfield

Staff member
Super Moderator
#2
Is the Design Manager new?

At least 2 years has passed since this equipment was designed. So, the latest drawing may not be the pertinent drawing.

Examine the superseded drawings (or maintenance manual) of the modified safety mechanism used for contract A123.

Potentially, this is a nonconformity:

Nature: "Failure to ensure design outputs (drawings) are adequate for subsequent processing (maintenance) ".
See: ISO 9001:2015, clause 8.3.5b.
Evidence: Safety mechanism not included in approved drawings (include dwg number and rev) for the equipment (serial number X134, rev 3) as applicable to contract A123.

Ask what are the criteria for including the customer in risk assessments? Do these criteria change for safety devices?
 

Randy

Super Moderator
#3
..........or the previous review and testing found nothing and it required multiple cycles and use for the flaw to reveal itself after end user operation. It can happen, therefore technically there were no errors then, but improvement needs to take place now in the testing or review process as well as in the design.....Multiple pathways & possible causes.... Reminds me of a Jimmy Stewart movie "No Highway in the Sky" or maybe United 232 as examples, even the Shuttle program.
 

Tagin

Trusted Information Resource
#4
The drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment.
You confirm with the Design Manager that revision 3 is the current version of the drawings and that revision 3 does not include the change to the safety mechanism.
If the change to the safety mechanism was not in the drawings, then what instructed manufacturing to install the change to the safety mechanism prior to delivery and installation of the equipment?
 

Pjservan

Involved In Discussions
#5
Looks like how the change was made needs to be reviewed as you stated "drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment." The question to me is how this modification was made? Was it consider a Design Change? How was risk associated with the change assessed and how was it determined that it was a minor change. Was the situation that the customer (with the complaint) considered? What is being done about it now?
 

MDGMG

Posts Moderated
#6
Looks like how the change was made needs to be reviewed as you stated "drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment." The question to me is how this modification was made? Was it consider a Design Change? How was risk associated with the change assessed and how was it determined that it was a minor change. Was the situation that the customer (with the complaint) considered? What is being done about it now?

There is a design changed but it was considered as minor and same was not included in drawing.
 

MDGMG

Posts Moderated
#7
If the change to the safety mechanism was not in the drawings, then what instructed manufacturing to install the change to the safety mechanism prior to delivery and installation of the equipment?
1) Machine was supplied with previous design (which not included with safety mechanism)
2) During the visit by the service official, He was having only new design
 

Tagin

Trusted Information Resource
#8
1) Machine was supplied with previous design (which not included with safety mechanism)
2) During the visit by the service official, He was having only new design
Ok, I misunderstood your original post. The machine was not originally supplied with the safety change.

The drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment.
Then it does not appear that any design change has ever been approved or implemented. What evidence do you have that a design change was actually approved and implemented?
 

Jim Wynne

Staff member
Admin
#9
You seem to be contradicting yourself. You first stated that the modification was made to the installed equipment:
You find a recent note on file that states that the engineers are currently having difficulty in repairing the equipment. They have been issued with the latest drawings for the equipment (serial number X134, revision 3). The drawings do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment.
Now you say that it wasn't.
1) Machine was supplied with previous design (which not included with safety mechanism)
Which is correct?
 

MDGMG

Posts Moderated
#10
There are three aspects to the case study given (needs considerable understanding)
1) Equipment was designed , manufactured and supplied two years earlier with contract number A123
2) The drawing do not contain a modification to the safety mechanism that was made prior to delivery and installation of the equipment
3) Design manager replies that the change was reviewed and considered to be minor on the equipment with no impact on the equipment and it didn't affect the customers contract specification.

Hope above points will help for conclusion. For my point of view further investigation is required as there is a lack of document control and review mechanism.
 
Thread starter Similar threads Forum Replies Date
M Case study solution help required as per ISO 9001 : 2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
L Need Help with Case Study Questions Manufacturing and Related Processes 16
M ISO 9001:2015 case study sample ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Case study resources ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
DuncanGibbons Looking for example aerospace part CAD files to be used for a case study Career and Occupation Discussions 2
A Audit purpose - case study - What is the role of SQE in such case? General Auditing Discussions 3
M Case study - If the restaurant (ISO 9001:2015 certified) was run by 2 persons covering cooking and purchasing processes (Mother and Father) supported ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
K Student wanting Case Study about Internal Audit Report Internal Auditing 1
L Printing Machine Make Ready Rapid Changeover Case Study Lean in Manufacturing and Service Industries 2
S Example of a DFSS (Design for Six Sigma) Project or a Case Study Six Sigma 4
S Production Equipment Forms - Case study with ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 31
R LKV Value: Can not verify Reliasoft Case Study Reliability Analysis - Predictions, Testing and Standards 2
I Six Sigma Assignment Problem - Case Study: Productivity Improvement Six Sigma 2
Q Lean in Service - Case Study on the Implementation of Lean Tools in IT Lean in Manufacturing and Service Industries 9
D Short Quality Cases for my Quality Workshop so I can make a Case Study Quality Tools, Improvement and Analysis 10
E Quality Risk Management (QRM) - A Case Study Quality Manager and Management Related Issues 7
J Process Capability - Interview Case Study Capability, Accuracy and Stability - Processes, Machines, etc. 1
F Root Cause Analysis Problem Case Study for Exercise? Problem Solving, Root Cause Fault and Failure Analysis 10
B Case Study - Implementation of ISO 9001:2008 in Small Companies ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
K Lead Auditor Course - Case Study ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
JodiB Evaluate a business or organization - Need case study for school! Coffee Break and Water Cooler Discussions 16
M Cmk (Machine Capability) - Case study Capability, Accuracy and Stability - Processes, Machines, etc. 5
T ISO 9004:9000 Case study needed ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
A Should a Nonconformance be issued in this Case Study? Miscellaneous Environmental Standards and EMS Related Discussions 12
M APQP Case Study? Boss wants to give a workshop on APQP APQP and PPAP 7
D Detailed Six Sigma Case Study Needed Six Sigma 9
B Just Starting on the ISO 9001 Implementation Road - A case study! ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 22
Z MSA - Gage R&R Study Analysis - SAMPLE - Case Study Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 20
Steve Prevette A Case Study - Flaws in a performance measure report Registered Visitor Articles Archive 6
V Complaints Management System - Restaurant chain business - Study case Statistical Analysis Tools, Techniques and SPC 11
K Torque Gauge R&R - Non-Replicable GRR Case Study Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5
D Safety Assurance Case Report Format ISO 14971 - Medical Device Risk Management 4
M Informational USFDA – Digital Health Update: The FDA Announces an Opportunity for Test Case Volunteers for the Test Plan for the Software Precertification Program Medical Device and FDA Regulations and Standards News 0
M Informational EU – Medicinal products and medical devices: Coordinated approach in case of a withdrawal of the United Kingdom from the Union without a deal Medical Device and FDA Regulations and Standards News 0
I Cleanroom Actions in case of Actions Limit Alarm Qualification and Validation (including 21 CFR Part 11) 3
L Benefits that the QA's gain with a Test Case Template Misc. Quality Assurance and Business Systems Related Topics 1
M Does ISO 10993 Apply to Packaging? (e.g. Travel Case) Other Medical Device Related Standards 4
Z Is PPAP Re-qualification needed in case of not quoted dimension change? APQP and PPAP 4
J MDIC (Medical Device Innovation Consortium) and the "Case for Quality"? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 6
J If/how to apply LVD (Low Voltage Directive) in this case CE Marking (Conformité Européene) / CB Scheme 6
I Reaction plan in case of power outage Misc. Quality Assurance and Business Systems Related Topics 7
R Medical Device Safety Assurance Case Reports Other Medical Device and Orthopedic Related Topics 6
M Specific Capability case - Target Value is same as the Lower Limit Capability, Accuracy and Stability - Processes, Machines, etc. 9
L Business case for an electronic EMS (Electronic Manufacturing Services) ISO 14001:2015 Specific Discussions 2
C Case Hardening and Case Depth Measurement Manufacturing and Related Processes 4
Ajit Basrur India marks three years since last polio case Hospitals, Clinics & other Health Care Providers 2
J Electronic Components inside a Wooden Case Manufacturing and Related Processes 4
S Certificate Suspension Necessary in case of No Production? ISO 13485:2016 - Medical Device Quality Management Systems 4
A Type of Materials to comply with IEC 60601 (Dental Laser Case) IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
E Short Case Studies - Major/Minor Nonconformance, Observation or OK? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9