Change Orders in SharePoint

M
#1
Hello everyone! First time positing in this group/forum.

We're currently using Lotus Notes database to process Change Orders. It's really an old software and improvements/changes are not supported anymore.
We are looking at migrating our Change Order system through a MS SharePoint site (recommended by the Management).

Does anyone have experience using SharePoint site in processing change orders or any similar system for reference?
Also, what other databases or software do you use in your organization that you recommend highly?

Thank you,
Maria
 
Elsmar Forum Sponsor

GStough

Staff member
Super Moderator
#2
TrackWise and MasterControl are a couple of document management systems that come to mind. Both can easily manage your change order process, as well as most of your other QMS processes (audit, CAPA, etc.).
 

pbojsen

Involved In Discussions
#3
Are you planning on using electronic signatures for your change orders? If so, you will might need the cloud-based version of SharePoint. Easier than on premises version for e-sigs.
 

qualprod

Trusted Information Resource
#4
Hello everyone! First time positing in this group/forum.

We're currently using Lotus Notes database to process Change Orders. It's really an old software and improvements/changes are not supported anymore.
We are looking at migrating our Change Order system through a MS SharePoint site (recommended by the Management).

Does anyone have experience using SharePoint site in processing change orders or any similar system for reference?
Also, what other databases or software do you use in your organization that you recommend highly?

Thank you,
Maria
It depends on your needs, SharePoint is sold as it is, not to easy to be customized, but again, first do a list of your needs (proposals, flow of approvals , changes, notifications,etc . If have lot of needs, maybe SP is not for you,
Hello everyone! First time positing in this group/forum.

We're currently using Lotus Notes database to process Change Orders. It's really an old software and improvements/changes are not supported anymore.
We are looking at migrating our Change Order system through a MS SharePoint site (recommended by the Management).

Does anyone have experience using SharePoint site in processing change orders or any similar system for reference?
Also, what other databases or software do you use in your organization that you recommend highly?

Thank you,
Maria
A
Are you planning on using electronic signatures for your change orders? If so, you will might need the cloud-based version of SharePoint. Easier than on premises version for e-sigs.
First off, do a list of your needs, e.g. requests, flow of approvals, notifications into the system or by email, transactions, calculations, etc. If your needs are similar, then probably SP is not for you, SP is a generic application, which has limited customization, according to your needs, maybe you need a home-made development, supported by SQL or other database on the backend And visual basic or java script in the front end.
Hope this helps
 
Thread starter Similar threads Forum Replies Date
XRAY_3121 Informational MDSAP Audit Findings - Document change orders Other Medical Device Regulations World-Wide 12
D How to process Customer ECO's (Engineering Change Orders) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
J Numbering System for Change Orders used to Manage Controlled Documents Document Control Systems, Procedures, Forms and Templates 5
J Reducing Engineering Change Orders Document Control Systems, Procedures, Forms and Templates 16
Ed Panek Notified Body Substantial Change MDD EU Medical Device Regulations 1
A Purchasing Controls on Change Management of Literature/Labeling ISO 13485:2016 - Medical Device Quality Management Systems 3
A For software change - New Channel of interoperability CE Marking (Conformité Européene) / CB Scheme 4
JoCam IEC 60601-1 and 60601-1-2 retest after PCBA change IEC 60601 - Medical Electrical Equipment Safety Standards Series 3
N ISO 13485 7.3.9 Change control in medical device software ISO 13485:2016 - Medical Device Quality Management Systems 6
A ISO 13485 procedure change and reflect to legacy manufacture items ISO 13485:2016 - Medical Device Quality Management Systems 2
R AS9102 FAI Change in Material / Process Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D Reports under change management | ISO 13485:2016 & ISO 9001:2015 ISO 13485:2016 - Medical Device Quality Management Systems 3
Q Time change via change of Time Zone Qualification and Validation (including 21 CFR Part 11) 3
T IEC 60601-1-8:2020 Is it necessary to change the alarm melody? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M Change in Constitution / Ownership of firm -------ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
U Power supply - Change From 160 to 300 Watts - Significant change? EU Medical Device Regulations 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
M Label change - 510(k) Medical Device and FDA Regulations and Standards News 5
M EMS change management ISO 14001:2015 Specific Discussions 2
E Document Change Request forms (or no forms)? ISO 13485:2016 - Medical Device Quality Management Systems 9
J Significant change related to design and intended use EU Medical Device Regulations 3
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Cleaning process center change ISO 13485:2016 - Medical Device Quality Management Systems 4
U NOC - What is considered a "design change" EU Medical Device Regulations 5
qualprod What do CB´s change when doing a partial moving ? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Y Algo change significancy Medical Information Technology, Medical Software and Health Informatics 3
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 4
Z Iterative development and FDA change requests IEC 62304 - Medical Device Software Life Cycle Processes 12
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
R Medical Device - Change manufacturing plant Design and Development of Products and Processes 6
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
A What does this line from MDCG 2020-3 (MDR art. 120 substantial change) mean to you? EU Medical Device Regulations 4
M Change management procedure when 7.3 is not applicable ISO 13485:2016 - Medical Device Quality Management Systems 5
D Change Approval Requirements - Does every change need formal customer approval? Design and Development of Products and Processes 17
Q Change the shape of the raw material FAI AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
D Engineering Change Order (ECO) metrics to track ISO 13485:2016 - Medical Device Quality Management Systems 6
P Notified Body Approval of Change EU Medical Device Regulations 2
F Change to Formulation due to Reach (China Medical Device Regulations) China Medical Device Regulations 0
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
S Forced ServiceNow validation - No change in our current user and functional requirements IT (Information Technology) Service Management 4
M Address change for a company with CE/ISO13485 EU Medical Device Regulations 2
G Need to change KPI we called NC parts (maximum 3%.) to FTQ (first time quality) IATF 16949 - Automotive Quality Systems Standard 4
J FDA notification of address change US Food and Drug Administration (FDA) 2
D Class 3 Device - Change of supplier of material Canada Medical Device Regulations 6
D List A IVD - Change to material supplier EU Medical Device Regulations 3
R Change Management vs Opportunity for Improvement ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Is There a Revision History or Change Log for Canadian Regulations? Canada Medical Device Regulations 3
C Brazil - Product Code (and brand) Change Other Medical Device Regulations World-Wide 1
S Requirement to Conduct New Shelf-life Testing? (re-do testing for design change) EU Medical Device Regulations 3

Similar threads

Top Bottom