Hello All,

I'd like to check with you whether you are following a change ratio to serve as guideline in the need for control limit update.

I've seen the mention of change ratio in Intel's training material: pg 53-54 of source:

wenku.baidu.com/view/acb18969a45177232f60a29e.html

Change ratio is to be calculated through the following formula:

CR = abs-value {[CL(old)-CL(new)]/stdev}

A change ratio of > 1.5 is deemed to be a problem while > 1.0 is deemed to be potentially a problem.

Thoughts?
 
Elsmar Forum Sponsor

Steve Prevette

Deming Disciple
Staff member
Super Moderator
#2
Seems like there is a circular logic problem. I don't change my control limits unless I have justification to, generally with a trending signal (such as a point outside the control limits). But this seems to suggest that I calculate new control limits, and then use the new control limit as justification to calculate the new control limits. Hmmmm.
 
D

Darius

#3
Interesting, I have seen some control charts with changes on control limits but not a word about how it was done.

I have done something similar but as a statistical test :mg:, It has been a topic with some experts, if control charts can be taken as a statistical test, many are against it, but I found it handy for change detection. This approach can be more fast as detection rule..., it may worth have a try, but a point to be addresed is how many points should be taken from the last point, because a change includes more variation and a change of mean, but if you take 10000 points the last few point showing a change may not affect the statistics in a noticeable way.

Any process changes, narrow control limits or not reflecting the same parameters as the process it self (mean and standard deviation) could result on many false alarms because the practitioner didn't saw the change and changed the control limits accordingly. Agree that Donald Wheeler said the same Steve said, sort of "recalculate only if you know something changed", but fixing it just make it sort of specs limits.
 

Steve Prevette

Deming Disciple
Staff member
Super Moderator
#4
Interesting, I have seen some control charts with changes on control limits but not a word about how it was done.
Here is a writeup on the logic I use: http :// www .efcog .org/wg/esh_es/Statistical_Process_Control/SPC_Trending_Primer/daytwo/20 Life Cycle of a Trend Day Two.pdf - DEAD LINK (404) UNLINKED

I am probably more willing to follow a statistical signal in rebaselining than Dr. Wheeler would, in the case of one can't figure out the reason in the process that the change occurred. Certainly it is preferable to BOTH have a SPC signal, and also knowledge that the process indeed did change.
 
Last edited by a moderator:
Thread starter Similar threads Forum Replies Date
D Reports under change management | ISO 13485:2016 & ISO 9001:2015 ISO 13485:2016 - Medical Device Quality Management Systems 3
Q Time change via change of Time Zone Qualification and Validation (including 21 CFR Part 11) 3
T IEC 60601-1-8:2020 Is it necessary to change the alarm melody? IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M Change in Constitution / Ownership of firm -------ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 1
U Power supply - Change From 160 to 300 Watts - Significant change? EU Medical Device Regulations 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
M Label change - 510(k) Medical Device and FDA Regulations and Standards News 5
M EMS change management ISO 14001:2015 Specific Discussions 2
E Document Change Request forms (or no forms)? ISO 13485:2016 - Medical Device Quality Management Systems 9
J Significant change related to design and intended use EU Medical Device Regulations 3
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
S Cleaning process center change ISO 13485:2016 - Medical Device Quality Management Systems 4
U NOC - What is considered a "design change" EU Medical Device Regulations 5
qualprod What do CB´s change when doing a partial moving ? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
Y Algo change significancy Medical Information Technology, Medical Software and Health Informatics 3
Revision36 Engineering Change Order Industry Standards Other Medical Device and Orthopedic Related Topics 4
Z Iterative development and FDA change requests IEC 62304 - Medical Device Software Life Cycle Processes 12
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
R Medical Device - Change manufacturing plant Design and Development of Products and Processes 6
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5
R Do we need issue ECN (Engineering Change Notice) towards updated Material Specification? Design and Development of Products and Processes 2
A What does this line from MDCG 2020-3 (MDR art. 120 substantial change) mean to you? EU Medical Device Regulations 4
M Change management procedure when 7.3 is not applicable ISO 13485:2016 - Medical Device Quality Management Systems 5
D Change Approval Requirements - Does every change need formal customer approval? Design and Development of Products and Processes 17
Q Change the shape of the raw material FAI AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
D Engineering Change Order (ECO) metrics to track ISO 13485:2016 - Medical Device Quality Management Systems 6
P Notified Body Approval of Change EU Medical Device Regulations 2
F Change to Formulation due to Reach (China Medical Device Regulations) China Medical Device Regulations 0
E Change in control plan - Do I have to do sampling? IATF 16949 - Automotive Quality Systems Standard 1
S Forced ServiceNow validation - No change in our current user and functional requirements IT (Information Technology) Service Management 6
M Address change for a company with CE/ISO13485 EU Medical Device Regulations 2
G Need to change KPI we called NC parts (maximum 3%.) to FTQ (first time quality) IATF 16949 - Automotive Quality Systems Standard 4
J FDA notification of address change US Food and Drug Administration (FDA) 2
D Class 3 Device - Change of supplier of material Canada Medical Device Regulations 6
D List A IVD - Change to material supplier EU Medical Device Regulations 3
R Change Management vs Opportunity for Improvement ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Is There a Revision History or Change Log for Canadian Regulations? Canada Medical Device Regulations 3
C Brazil - Product Code (and brand) Change Other Medical Device Regulations World-Wide 1
S Requirement to Conduct New Shelf-life Testing? (re-do testing for design change) EU Medical Device Regulations 3
dgrainger Informational EU medical device website change from 'Growth' to 'Health and Food Safety' (6/2020) Medical Device and FDA Regulations and Standards News 0
J Sub-supplier change from manual to automated process - same specs - Report to FDA? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
S Special 510(K) - Labeling change from Rx to OTC Other US Medical Device Regulations 11
A Document Change Notice vs complete System re-write Manufacturing and Related Processes 4
S MDR Delay - MDD design Change? (before new MDR DOA) EU Medical Device Regulations 8
Jane's Like-for-like critical raw material change qualification - type of testing/ number of lots required ISO 13485:2016 - Medical Device Quality Management Systems 4
R Change Notification - Registrar vs Notified body ISO 13485:2016 - Medical Device Quality Management Systems 1
Marc Insects and Climate Change - 2020 World News 0
A UDI and Design Controls - Labeling change via the Design Control process 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
Q Company Ownership Change ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
Q Legal Manufacturing Address Change – multiple registrations at same address 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2

Similar threads

Top Bottom